CN201813099U - 交流超或特高压线路带电作业电位转移分流棒 - Google Patents
交流超或特高压线路带电作业电位转移分流棒 Download PDFInfo
- Publication number
- CN201813099U CN201813099U CN201020540504XU CN201020540504U CN201813099U CN 201813099 U CN201813099 U CN 201813099U CN 201020540504X U CN201020540504X U CN 201020540504XU CN 201020540504 U CN201020540504 U CN 201020540504U CN 201813099 U CN201813099 U CN 201813099U
- Authority
- CN
- China
- Prior art keywords
- lead
- high voltage
- extra high
- ultra
- potential shift
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Testing Relating To Insulation (AREA)
Abstract
一种交流超或特高压线路带电作业电位转移分流棒,它包括金属钩以及与金属钩相连接的金属棒,在金属棒的另一端连接至少两根引线,在每根引线的端头设置连接头。采用上述技术方案的本实用新型,增设了引线的数量,多根引线的存在将对电流进行分流,所以对于单根引线来说,放电的电流不至于过大,所以不会击穿引线,从而保证了工作人员的安全。
Description
技术领域
本实用新型属于高压输电线路领域,具体地说是涉及一种交流超/特高压线路带电作业电位等电位进入方法和电位转移棒。
背景技术
带电作业已成为电力线路检测、检修、改造的重要手段和方法,为电力系统的安全可靠运行和提高经济效益发挥了十分重要的作用。进入等电位是输电线路带电作业的重要工作步骤,直接关系到作业人员的安全和作业的效率。我国现有的500kV及以下电压等级输电线路带电作业中多采用作业人员穿着全套屏蔽服装(包括导电手套)后乘坐吊篮或吊椅等运载工具接近导线,在距离带电体一定距离(对于110KV、220KV线路,此距离为0.3m;对于500KV线路,此距离为0.4m)时直接用手接触带电体实现电位转移从而进入等电位。例如《四川电力技术》2004年第1期上的“高海拔500 kV输电线路带电作业技术分析”一文介绍了相关的方法。
在作业人员进入等电位过程中的电位转移时,会有一个电容放电脉冲电流,并伴随有电弧。这一脉冲电流随着电压等级的提高而增大,而电弧则随着脉冲电流的增大而增强。对于750-1000kV超/特高压交流线路,若仍采用500kv及以下电压等级带电作业中所使用的方法进入等电位,在电位转移过程时脉冲电流和电弧将对作业人员的安全造成危害,并将损坏屏蔽服。
专利号为200710169042.8的实用新型专利,虽然也解决了上述方案,但是由于引线过少过细,所以在放电的过程中往往会击穿引线,从而引起事故。
实用新型内容
本实用新型的目的是提供一种安全性好、提高带电作业效率的交流超或特高压线路带电作业电位转移分流棒。
为实现上述目的,本实用新型采用以下技术方案:
本实用新型包括金属钩以及与金属钩相连接的金属棒,在金属棒的另一端连接至少两根引线,在每根引线的端头设置连接头。
在所述金属棒的另一端连接至少四根引线。
在所述金属棒的另一端连接五根引线。
采用上述技术方案的本实用新型,增设了引线的数量,多根引线的存在将对电流进行分流,所以对于单根引线来说,放电的电流不至于过大,所以不会击穿引线,从而保证了工作人员的安全。
附图说明
图1为本实用新型的整体结构示意图。
图2为本实用新型中电位转移棒的结构示意图。
具体实施方式
如图1所示,在电力塔上设有地线1和横担3,横担3上挂有绝缘子串2,绝缘子串2的下端设有导线4。
交流超/特高压线路带电作业等电位进入方法:作业人员穿戴超/特高压交流带电作业全套屏蔽服装,将电位转移棒与屏蔽服连接良好后乘坐绝缘的吊篮6接近导线4,在距离导线4约0.5m时,使用本实用新型的电位转移棒5接触导线4进行电位转移,进入等电位。
如图2所示,本实用新型包括金属钩10以及与金属钩10相连接的金属棒9,在金属棒9的另一端连接至少两根引线7,在每根引线7的端头设置连接头8。需要说明的是,可以在上述金属棒9的另一端连接至少四根引线7,即引线7的数量可以为两根、三根、四根、五根或甚至更多根。另外,金属棒9为圆柱形,且表面光滑。
本实用新型的原理是:通过金属钩10、金属棒9将电流引下,多根引线7的存在将对电流进行分流,所以对于单根引线7来说,放电的电流不至于过大,所以不会击穿引线7。
Claims (3)
1.一种交流超或特高压线路带电作业电位转移分流棒,它包括金属钩(10)以及与金属钩(10)相连接的金属棒(9),其特征在于:在金属棒(9)的另一端连接至少两根引线(7),在每根引线(7)的端头设置连接头(8)。
2.根据权利要求1所述的交流超或特高压线路带电作业电位转移分流棒,其特征在于:在所述金属棒(9)的另一端连接至少四根引线(7)。
3.根据权利要求1所述的交流超或特高压线路带电作业电位转移分流棒,其特征在于:在所述金属棒(9)的另一端连接五根引线(7)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201020540504XU CN201813099U (zh) | 2010-09-25 | 2010-09-25 | 交流超或特高压线路带电作业电位转移分流棒 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201020540504XU CN201813099U (zh) | 2010-09-25 | 2010-09-25 | 交流超或特高压线路带电作业电位转移分流棒 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201813099U true CN201813099U (zh) | 2011-04-27 |
Family
ID=43896037
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201020540504XU Expired - Fee Related CN201813099U (zh) | 2010-09-25 | 2010-09-25 | 交流超或特高压线路带电作业电位转移分流棒 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201813099U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102403672A (zh) * | 2011-08-30 | 2012-04-04 | 国网电力科学研究院 | 超/特高压交直流混压线路带电作业等电位转移安全方法 |
CN102412520A (zh) * | 2010-09-25 | 2012-04-11 | 河南省电力公司焦作供电公司 | 交流超或特高压线路带电作业电位转移分流棒 |
-
2010
- 2010-09-25 CN CN201020540504XU patent/CN201813099U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102412520A (zh) * | 2010-09-25 | 2012-04-11 | 河南省电力公司焦作供电公司 | 交流超或特高压线路带电作业电位转移分流棒 |
CN102403672A (zh) * | 2011-08-30 | 2012-04-04 | 国网电力科学研究院 | 超/特高压交直流混压线路带电作业等电位转移安全方法 |
CN102403672B (zh) * | 2011-08-30 | 2013-11-13 | 国网电力科学研究院 | 超/特高压交直流混压线路带电作业等电位转移安全方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101227068B (zh) | 交流超或特高压线路带电作业电位转移棒 | |
CN103149489B (zh) | 一种电气化铁道at牵引网断线判别方法 | |
CN101567530B (zh) | 带电进入660kV直流线路直线塔等电位的安全方法 | |
CN104316830A (zh) | 铁路at供电方式越区供电时的故障测距方法 | |
CN104283148A (zh) | 一种用于66kV输电线路带电作业的绝缘斗臂车 | |
CN201813099U (zh) | 交流超或特高压线路带电作业电位转移分流棒 | |
CN201153196Y (zh) | 交流超/特高压线路带电作业电位转移棒 | |
CN102403672B (zh) | 超/特高压交直流混压线路带电作业等电位转移安全方法 | |
CN201821070U (zh) | 双回紧凑型输电线路跳线为水平绕跳的转角塔 | |
CN205123128U (zh) | 一种带电更换特高压接地极线路直线绝缘子的工具 | |
CN203553745U (zh) | 800kV特高压直流线路150kN级软质绝缘拉棒 | |
CN205159908U (zh) | 一种后备保护卡线器 | |
CN102412520A (zh) | 交流超或特高压线路带电作业电位转移分流棒 | |
CN203932808U (zh) | 带电更换绝缘子导线提升装置 | |
CN205777802U (zh) | 一种高压输电线塔 | |
CN201742027U (zh) | 110kV同塔双回线路带电更换绝缘子专用工具 | |
CN204205403U (zh) | 一种用于66kV输电线路带电作业的绝缘斗臂车 | |
CN205159920U (zh) | 带电更换同塔多回输电线路跳线悬垂绝缘子串用绝缘插板 | |
CN201502207U (zh) | 架空线路高压塔杆 | |
CN204538618U (zh) | 一种可使电缆在钢绞线上移动的电缆挂钩 | |
CN202616664U (zh) | 绝缘抬线器 | |
CN102684108A (zh) | 10kV线路架空导线带电修复方法及绝缘抬线器 | |
CN102383639A (zh) | 紧凑结构杆塔 | |
CN207939173U (zh) | 一种适用于高原型35kV双回架空线路的"T"接结构 | |
CN204706830U (zh) | 高压带电断、接引线装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110427 Termination date: 20180925 |
|