CN201807856U - Too for combining and integrating suspension cage of construction lifter - Google Patents
Too for combining and integrating suspension cage of construction lifter Download PDFInfo
- Publication number
- CN201807856U CN201807856U CN201020212241XU CN201020212241U CN201807856U CN 201807856 U CN201807856 U CN 201807856U CN 201020212241X U CN201020212241X U CN 201020212241XU CN 201020212241 U CN201020212241 U CN 201020212241U CN 201807856 U CN201807856 U CN 201807856U
- Authority
- CN
- China
- Prior art keywords
- frock
- facade
- tool
- vertical face
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a tool for combining and integrating a suspension cage of a construction lifter, which comprises a bottom supporting platform and six planar combining tools of the suspension cage. The tool is characterized in that: the bottom supporting platform comprises a bottom plate, the lower part of which is anchored in concrete; the bottom plate is fixedly connected with a front vertical face tool and movably connected with a rear vertical face tool; a bottom surface tool is arranged on the upper surface of the bottom plate exposed out of the concrete; and the front vertical face tool and the rear vertical face tool are movably connected to form a top surface tool, a left vertical face tool and a right vertical face tool. By adopting the technical scheme, the bottom plate, the bottom of which is anchored in the concrete, has enough strength and rigidity so as to ensure that the shape tolerance and the position tolerance of the bottom plate can be controlled; and the rear vertical face tool is movably connected with the bottom plate, so after the whole suspension cage is assembled and the rear vertical face tool is disassembled, the whole suspension cage can be integrally taken out. The tool structure ensures good effect and high efficiency of a suspension cage finished product.
Description
Technical field
The utility model relates to a kind of frock clamp of processing construction facility parts,, be specifically related to a kind of frock of cage combination of building hoist.
Background technology
Building hoist is the manned loading construction machinery that often uses in the building, because its unique body structure makes it take not only comfortable but also safety, is used widely at the realm of building construction.The casing that the manned loading of building hoist is used also is cage, in use bear complicated stress, the strength and stiffness that are easy to generate distortion or destruction so its structure are most important to construction safety, because it mainly adopts Welding Structure, when combination, must use frock clamp to guarantee the machining accuracy of cage.Prior art all is that each main facade Combination Welding is carried out overall package later on more basically, exists multiple welding to be out of shape when branch assembling and last overall package, causes finished product structural entity Deformation control poor effect.
The utility model content
The technical problems to be solved in the utility model provides a kind of once assembling, global formation, the building hoist cage composite entity frock of the little easy control of bulk deformation.
The technical scheme that the utility model technical solution problem is adopted is: a kind of building hoist cage composite entity frock, six plane assembled tools that comprise bottom supporting platform and cage, it is characterized in that: the bottom supporting platform comprises that the bottom is anchored at the base plate in the concrete, base plate is fixedlyed connected with preceding facade frock, base plate also flexibly connects with back facade frock, base plate exposes concrete upper surface and is provided with the bottom surface frock, flexibly connect between preceding facade frock and the back facade frock, constitute end face frock and left and right facade frock.
Adopt the technical program, its technique effect is: the base plate of bottom anchor in concrete has enough strength and stiffness, the preceding facade of cage is the plane at main bearing member place, the frock that plays the location clamping action is fixedlyed connected with base plate, guarantees that its main form tolerance and position of related features can both be controlled when welding; Back facade frock and base plate flexibly connect, make things convenient for the moulding of cage overall package after, remove back facade frock, can take out cage is whole.This tool structure guarantees that the cage finished product is effective, the efficient height.
Further, the structure of preceding facade frock and back facade frock is limited, it is characterized in that: facade frock and back facade frock include one group of column parallel to each other before described, and column is provided with and is used for the anchor clamps that the shaped steel location clamps.This structure guarantees that the distortion of cage on whole face is restricted owing to clamping, and is convenient to install and regulate.
Further, the syndeton on back facade frock and ground is limited, the column bottom of described back facade frock is provided with connecting plate with holes, and described base plate is provided with the screwed hole of correspondence.This structure makes the flexible connection of column and bottom surface adorn, tear open rapidly, raises the efficiency.
Further, the syndeton of anchor clamps on the column of preceding facade frock and column is limited, it is characterized in that: the anchor clamps before described on the column of facade frock are threaded with column.The convenient mounting or dismounting of this structure are raised the efficiency.
Description of drawings
Below in conjunction with drawings and Examples technical solutions of the utility model are further specified:
Fig. 1 is the stereogram of the object-cage that will process of a kind of building hoist cage of the utility model composite entity frock;
Fig. 2 is the stereogram of a kind of building hoist cage of the utility model composite entity frock.
The specific embodiment
As shown in Figure 1, cage comprise bottom surface 1, the facade 2 at actuating unit place is installed and be installed into bin gate facade 3, end face 4, the facade 5 of discharge door is installed and the facade 6 of driver's cabin is installed.Each face all is the plane that is formed by the rod member welding.Therefore each other position and size is exactly the problem that processing must be considered between the rod member.Such as channel-section steel 101 on its bottom surface 1 and angle steel 102, the channel-section steel 401 on the end face 4, channel-section steel 403 and angle steel 402, its depth of section is inconsistent, must consider accurate positioning man-hour adding, and will have corresponding clamping device to realize the accuracy of processing dimension in addition.
As shown in Figure 2, a kind of building hoist cage of the utility model composite entity frock, in order to satisfy above-mentioned processing request, its bottom surface is adopted steel plate and is anchored in the concrete, be welded with the column 7 that many channel-section steels constitute on the bottom surface, the top connects into integral body by backstay 702 between many root posts 7, strengthens its rigidity.Column 7 is provided with location channel-section steel 701 and location-plate 703.Opposite at the steel plate upper pillar stand 7 of bottom surface is provided with many active columns 8, active column 8 tops are connected to form one by backstay 804, the lower end employing bolt of active column 8 is connected with the Connection Block 801 on being welded on the bottom surface steel plate, the cage welding finishes, remove after the active column 8, easily cage integral body is taken out from frock.Also be provided with the channel-section steel 801 of location usefulness on the active column 8.Active column 8 and column 7 link into an integrated entity by backstay 802.The channel-section steel 101 on corresponding cage on the bottom surface and the position of angle steel 102 are provided with a plurality of positioning tubes 901, and are provided with the clamping device 902 that screw pair is formed.Adopt structure of the present utility model, the base plate of its bottom anchor in concrete has enough strength and stiffness, the preceding facade of cage is the plane at main bearing member place, the frock that plays the location clamping action is fixedlyed connected with base plate, guarantees that its main form tolerance and position of related features can both be controlled when welding; Back facade frock and base plate flexibly connect, make things convenient for the moulding of cage overall package after, remove back facade frock, can take out cage is whole.This tool structure guarantees that the cage finished product is effective, the efficient height.
Above embodiment only illustrates embodiment of the present utility model; can not be interpreted as qualification to protection domain of the present utility model; so long as employing the technical solution of the utility model; perhaps only make routine improvement or distortion that those of ordinary skill in the art can both expect, all fall into protection domain of the present utility model.
Claims (4)
1. building hoist cage composite entity frock, six plane assembled tools that comprise bottom supporting platform and cage, it is characterized in that: the bottom supporting platform comprises that the bottom is anchored at the base plate in the concrete, base plate is fixedlyed connected with preceding facade frock, base plate also flexibly connects with back facade frock, base plate exposes concrete upper surface and is provided with the bottom surface frock, flexibly connects between preceding facade frock and the back facade frock, constitutes end face frock and left and right facade frock.
2. building hoist cage composite entity frock before as claimed in claim 1 is characterized in that: facade frock and back facade frock include one group of column parallel to each other before described, and column is provided with and is used for the anchor clamps that the shaped steel location clamps.
3. building hoist cage composite entity frock before as claimed in claim 2 is characterized in that: the column bottom of described back facade frock is provided with band connecting hole connecting plate, and described base plate is provided with corresponding screwed hole.
4. building hoist cage composite entity frock before as claimed in claim 2 is characterized in that: the anchor clamps before described on the column of facade frock are threaded with column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201020212241XU CN201807856U (en) | 2010-06-01 | 2010-06-01 | Too for combining and integrating suspension cage of construction lifter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201020212241XU CN201807856U (en) | 2010-06-01 | 2010-06-01 | Too for combining and integrating suspension cage of construction lifter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201807856U true CN201807856U (en) | 2011-04-27 |
Family
ID=43890804
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201020212241XU Expired - Fee Related CN201807856U (en) | 2010-06-01 | 2010-06-01 | Too for combining and integrating suspension cage of construction lifter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201807856U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102069336A (en) * | 2010-06-01 | 2011-05-25 | 重庆盈丰升机械设备有限公司 | Combined integral fixture of construction elevator cage |
CN116511813A (en) * | 2023-07-03 | 2023-08-01 | 山西建筑工程集团有限公司 | Integral tool for construction lifter cage combination |
-
2010
- 2010-06-01 CN CN201020212241XU patent/CN201807856U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102069336A (en) * | 2010-06-01 | 2011-05-25 | 重庆盈丰升机械设备有限公司 | Combined integral fixture of construction elevator cage |
CN116511813A (en) * | 2023-07-03 | 2023-08-01 | 山西建筑工程集团有限公司 | Integral tool for construction lifter cage combination |
CN116511813B (en) * | 2023-07-03 | 2023-09-22 | 山西建筑工程集团有限公司 | Integral tool for construction lifter cage combination |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102069336A (en) | Combined integral fixture of construction elevator cage | |
CN201807856U (en) | Too for combining and integrating suspension cage of construction lifter | |
CN201891171U (en) | Integral bolt assembling frame | |
CN202592071U (en) | Large-scale steel plate drill hole simple and easy positioning device | |
CN205600352U (en) | A anchor clamps for special -shaped workpiece processing | |
CN203635631U (en) | High-rigidity portal frame type segmenting guide and guard fixing device | |
CN202684366U (en) | Automobile flexible production line workpiece support workbench | |
CN103231194A (en) | Clamping and positioning device for welding machining of rear frame | |
CN102704696A (en) | Space locator for high, big and heavy steel upright column | |
CN201702534U (en) | Positioning module used for assembling and welding steel structure box type rod element | |
CN206734046U (en) | A kind of new automobile engine support | |
CN204022286U (en) | Transfer crane is without corbel type door frame | |
CN206029800U (en) | Roof beam body assembled fitting platform | |
CN205532603U (en) | Shaft three -layer platform sling stand connecting device | |
CN101604888B (en) | Special cart for stator assembly | |
CN205476444U (en) | Light -duty support post based on low level jacking die carrier system | |
CN210147912U (en) | Vehicle part assembling clamp | |
CN204893707U (en) | On spare part anchor clamps in bent axle hole in grinding RV reduction gear simultaneously | |
CN216586997U (en) | Beam-column connection corrosion-resistant hardware fitting | |
CN205521104U (en) | Big -arch shelter is spanner for pillar | |
CN204197783U (en) | Goods shelf support top connection structure | |
CN203557148U (en) | Fixture for boring horn-shaped workpiece | |
CN210549159U (en) | General type driver's cabin welding transition anchor clamps | |
CN204590650U (en) | The flexible reinforcing construction of steam-pressing aero-concrete wall body door or window hole | |
CN215889064U (en) | Stand structure of steel construction installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110427 Termination date: 20170601 |