CN201804274U - Isolation debugging system for transformer substation monitor system - Google Patents

Isolation debugging system for transformer substation monitor system Download PDF

Info

Publication number
CN201804274U
CN201804274U CN2010205535950U CN201020553595U CN201804274U CN 201804274 U CN201804274 U CN 201804274U CN 2010205535950 U CN2010205535950 U CN 2010205535950U CN 201020553595 U CN201020553595 U CN 201020553595U CN 201804274 U CN201804274 U CN 201804274U
Authority
CN
China
Prior art keywords
server
debugging
subsystem
monitor
fortune
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205535950U
Other languages
Chinese (zh)
Inventor
陈卫东
赵康伟
康健民
田生林
王晓卉
梅峰
张建勋
万晓光
刘铁城
李晓丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
North China Grid Co Ltd
Maintenance Branch of State Grid Hebei Electric Power Co Ltd
Beijing Electric Power Transmission and Transformation Co
Original Assignee
North China Grid Co Ltd Beijing Ultra-Hv Co
North China Grid Co Ltd
Beijing Electric Power Transmission and Transformation Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Grid Co Ltd Beijing Ultra-Hv Co, North China Grid Co Ltd, Beijing Electric Power Transmission and Transformation Co filed Critical North China Grid Co Ltd Beijing Ultra-Hv Co
Priority to CN2010205535950U priority Critical patent/CN201804274U/en
Application granted granted Critical
Publication of CN201804274U publication Critical patent/CN201804274U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model relates to an isolation debugging system for a transformer substation monitor system, which comprises an in-operation monitor subsystem and an isolation debugging subsystem. The isolation debugging subsystem includes a debugging server and a data transmission medium, and the isolation debugging subsystem interchanges data with the in-operation monitor subsystem by the aid of the data transmission medium. The isolation debugging system with the technical scheme has the advantages that normal operation of the original monitor system is unaffected by expansion of a transformer substation, a server network used for the modification and an original monitor system network are relatively independent and do not affect to each other, normal monitor operation of the monitor system on original operational equipment is not affected, and fault operation on the original operational equipment through the monitor system due to human factors can also be avoided.

Description

Monitoring system of electric substation is isolated debug system
Technical field
The utility model relates to the debug system in a kind of power transmission and transformation field, particularly relates to a kind of monitoring system of electric substation and isolates debug system.
Background technology
Upgrading of the supervisory system of transformer station and transformer station change, extend and happen occasionally.And finish on upgrading of supervisory system at present and the basis that reorganization and expansion all is based on the original supervisory system of transformer station, on operational outfit, revise database and carry out the transmission of corresponding four distant amounts, can cause the hidden danger (some maloperation phenomenons in fact also took place really) of some secure contexts substation safety stable operation.Mainly having following hidden danger takes place:
1. in transformer station's reorganization and expansion process, when first and second equipment is carried out whole transmission, supervisory system certainly will show the transmission information of a large amount of building equipments, to the operations staff normally the prison dish ruuning situation of operational outfit (monitor) impact, if in the debugging transmission process of new equipment, the signal that operational outfit breaks down or accident is sent can be mixed in a large amount of new equipment transmission information, is unfavorable for operations staff's supervision.
2. when equipment such as new isolating switch, disconnecting link carry out the remote control transmission, need to separate at interval the five anti-even Xie Wufang that stand entirely sometimes, can might produce the maloperation phenomenon normal running precocity influence in the station.
3. new observing and controlling screen is linked in the operational system, if accidentally mistake is established in the IP address, is made as the consolidated network address with former operational outfit, can cause network conflict, and supervisory system can not normally show the normal condition of operational outfit.
4. above-mentioned mistake also can cause mistake occurring to the information that scheduling is transmitted, and impacts.
5. when in master server, adding the database of newly added equipment,, can have influence on the normal operation of former runtime database if produce mistake.
6. when in master server, adding the supervision remote control picture of newly added equipment,, may cause operating the newly added equipment mistiming and be operable to operational outfit, cause influence without redemption if mistake appears in dynamic link.
Because above-mentioned existing supervisory control of substation tie up to the supervisory system upgrading of transformer station and transformer station change, extend in the defective of existence, the design people is actively studied innovation, isolate debug system and adjustment method in the hope of founding a kind of novel monitoring system of electric substation, make it have more practicality.
The utility model content
Fundamental purpose of the present utility model is, provide a kind of monitoring system of electric substation to isolate debug system, technical matters to be solved is in upgrading that carries out transformer station or enlarging, adopt the supervisory system of isolating to debug, thereby avoid to fortune supervisory system impact, thereby be suitable for practicality more.
The purpose of this utility model and solve its technical matters and realize by the following technical solutions.Isolate debug system according to a kind of monitoring system of electric substation that the utility model proposes, be included in the fortune Monitor And Control Subsystem and isolate the debugging subsystem, described isolation debugging subsystem comprises debugging server and data transmission media; Described isolation is debugged subsystem and carry out data interaction by this data transmission media between the fortune Monitor And Control Subsystem.
The purpose of this utility model and solve its technical matters and also can be applied to the following technical measures to achieve further.
Aforesaid monitoring system of electric substation is isolated debug system, wherein said the fortune Monitor And Control Subsystem physically with isolate the debugging subsystem and isolate fully.
Aforesaid monitoring system of electric substation is isolated debug system, wherein saidly comprises first server and second server at the fortune Monitor And Control Subsystem, and described first server is connected with the substation equipment system respectively with second server.
Aforesaid monitoring system of electric substation is isolated debug system, and wherein said isolation debugging subsystem also comprises switch, and linking to each other with debugging server forms LAN.
Aforesaid monitoring system of electric substation is isolated debug system, and wherein said data transmission media is a hard disk.
The purpose of this utility model and solve its technical matters and also adopt following technical scheme to realize.Adjustment method according to a kind of monitoring system of electric substation that the utility model proposes may further comprise the steps, and step 1 copies on the debug system the service data at the fortune monitoring system of electric substation; Step 2 is formed debugging network with debug system and debugged apparatus; Step 3 is debugged debugged apparatus in debug system, forms the commissioning test data in debug system; Step 4 copies to the commissioning test data of debug system at the fortune monitoring system of electric substation, replaces this service data at the fortune monitoring system of electric substation.
The purpose of this utility model and solve its technical matters and also can be applied to the following technical measures to achieve further.
Aforesaid monitoring system of electric substation is isolated debug system, and isolating fully physically at fortune monitoring system of electric substation and debug system described in the wherein said step 1, described data reproduction process comprises:
Data transmission media is installed on the fortune monitoring system of electric substation, will copies on the data transmission media in the service data of fortune monitoring system of electric substation; This data transmission media from the unloading of fortune monitoring system of electric substation, is installed to this data transmission media on the debug system then, then the service data on this data transmission media is copied on the debug system.Described fortune monitoring system of electric substation comprise first server and second server, these two servers have identical service data.Described step 4 comprises following process: the commissioning test data are copied on first server, disconnect the communication of second server and each equipment of transformer station, carry out communication by first server and each equipment of transformer station; Treat that first server copies to the commissioning test data on the second server after working properly again, disconnect the communication of first server and each equipment of transformer station, connect the communication of second server and each equipment of transformer station, treat the communication that first server and each equipment of transformer station are connected in second server back working properly, realize the state that two server moves simultaneously.Above-mentioned in fortune monitoring system of electric substation and debug system tool employing identical operations system, this operating system is solaris operating system or windows operating system.
By technique scheme, the utility model monitoring system of electric substation is isolated debug system and is had following advantage at least:
Adopt the technical solution of the utility model, make transformer station's enlarging process not influence the operate as normal of former supervisory system, it is relatively independent transforming the server network and the former supervisory system network that use, is independent of each other.Can not have influence on the normal monitoring operation of supervisory system, more can avoid some human factors by the maloperation of supervisory system to original operational outfit to original operational outfit.In the construction debug process, the safe and stable operation of transformer station has very big meaning.
Above-mentioned explanation only is the general introduction of technical solutions of the utility model, for can clearer understanding technological means of the present utility model, and can be implemented according to the content of instructions, below with preferred embodiment of the present utility model and conjunction with figs. describe in detail as after.
Description of drawings
Fig. 1 is that the monitoring system of electric substation of the utility model preferred embodiment is isolated debug system.
Embodiment
For further setting forth the utility model is to reach technological means and the effect that predetermined utility model purpose is taked, below in conjunction with accompanying drawing and preferred embodiment, to isolating its embodiment of debug system, structure, feature and effect thereof according to the monitoring system of electric substation that the utility model proposes, describe in detail as after.
See also shown in Figure 1ly, the monitoring system of electric substation of the utility model preferred embodiment is isolated debug system, and it is included in fortune Monitor And Control Subsystem 10 and isolates debugging subsystem 20, should the fortune Monitor And Control Subsystem physically with isolate the debugging subsystem and isolate fully.Describedly is connected the various data of generation when receiving substation equipment 30 and moving with substation equipment 30 at fortune Monitor And Control Subsystem 10.Should comprise first server 11, second server 12 and operating terminal 13 at fortune Monitor And Control Subsystem 10, described first server 11 is the identical server of configuration with second server 12, these two server parallel runnings, receive the various service datas that substation equipment 30 produces simultaneously, and on operating terminal 13, show.Operating terminal 13 can be operated and debug substation equipment 30 by input instruction.First server 11 is identical with the effect of second server 12, and wherein any one server isolated operation can be finished monitoring and the adjustment to substation equipment.Described isolation debugging subsystem 20 comprises a debugging server 21, data transmission media 22 and operating terminal 23, and this debugging server 21 is used for the equipment that transformer station's reorganization and expansion process needs to debug is debugged.Data transmission media 22 can be the part of debugging server 21, for being installed in a hard disk in the debugging server 21, also can be the equipment that is independent of debugging server 21 for example, for example is portable hard drive, CD etc.The effect of data transmission media 22 is and will be that first server in the Monitor And Control Subsystem 10 or the data in the second server duplicate, and these data are copied in the debugging server 21, make debugging server 21 and first server 11 (or second server 12) have identical operating system and substation operation data.Described isolation debugging subsystem 20 also comprises switch 24, and linking to each other with debugging server 21 forms LAN.Tested equipment 40 is connected in this switch 24, thereby form LAN with debugging server 21, the related data of this tested equipment 40 then can be entered in the debugging server 21, carry out tested equipment 40 is debugged from operating terminal 23, can be complementary with the data in the debugging server 21 up to this tested equipment 40.At this moment, in debugging server 21, just formed new database with tested equipment 24 related datas.After tested equipment 40 is finished debugging, the data in the debugging server 21 are copied on the data transmission media 22, then the data on the data transmission media 22 are copied on first server 11 and the second server 12.At this moment, just had the data of tested equipment 24 on the Monitor And Control Subsystem 10 in fortune, this tested equipment 24 not be by according to then can producing in the substation operation system the influence in the fortune supervisory system, thereby guaranteed the safe operation in fortune transformer station.
The utility model has also proposed a kind of adjustment method of monitoring system of electric substation, adopts above-mentioned monitoring system of electric substation to isolate debug system, and this method may further comprise the steps,
Step 1 copies on the debug system the service data at the fortune monitoring system of electric substation; Comprise:
Data transmission media is installed on the fortune monitoring system of electric substation, will copies on the data transmission media in the service data of fortune monitoring system of electric substation;
This data transmission media from the unloading of fortune monitoring system of electric substation, is installed to this data transmission media on the debug system then, then the service data on this data transmission media is copied on the debug system.
Step 2 is formed debugging network with debug system and debugged apparatus;
Step 3 is debugged debugged apparatus in debug system, forms the commissioning test data in debug system;
Step 4, the commissioning test data of debug system are copied at the fortune monitoring system of electric substation, replace this service data at the fortune monitoring system of electric substation, concrete steps comprise: the commissioning test data are copied on first server, disconnect the communication of second server and each equipment of transformer station, carry out communication by first server and each equipment of transformer station; Treat that first server copies to the commissioning test data on the second server after working properly again, disconnect the communication of first server and each equipment of transformer station, connect the communication of second server and each equipment of transformer station, treat the communication that first server and each equipment of transformer station are connected in second server back working properly, realize the state that two server moves simultaneously.
Above-mentioned adopts the identical operations system at fortune monitoring system of electric substation and debug system tool, and this operating system is solaris operating system or windows operating system.
Example 1
The 500kV transformer station of North China has 17 at present, is made of 5 cover systems of Nan Ruiji guarantor, southern auspicious science and technology, four directions, Beijing three companies respectively in the fortune supervisory system, and producer disperses, and onserver-class, application system and system platform are of a great variety.Use the website of Nan Rui scientific ﹠ technical corporation supervisory system to use two kinds of systems altogether, i.e. NS2000 (UNIX) system and NS2000 (WINDOWS) system.
The specific embodiments of NS2000 (UNIX) system-SUN type:
The system that this type is installed is used for a southern 500kV and becomes, and selects for use the SUN-ULTRA45 workstation as server, prepares a hard disk.At first hard disk is installed on the presence server.Solaris operating system and the oracle Database Systems consistent with the presence server version are installed on debugging server then, up-to-date backup with server in the station, scene imports this machine again, and this debugging server just can revert to and the on-the-spot the same function of moving of server like this.
When this website is extended work, the hard disk of this website correspondence can be installed on the machine, import on-the-spot up-to-date data backup then.Machine after importing is finished in system enlarging can with new on the independent networking of measurement and control unit carry out function debugging, concrete grammar is to form a LAN (Local Area Network) separately with newly going up measurement and control unit and this machinery utilization switch, at this moment can make on this machine new on the database of measurement and control unit, picture and form etc., after waiting this enlarging unit debugging to finish, with the data importing of this hard disk first server (carrying out the data backup work on first server) before to on-the-spot operation, after importing finishes to restart first server, second server is disconnected from network, by each unit communications in first server and the station, observe operating mode and data etc. all normal after, again with the data importing second server, first server is disconnected from network, observe each unit communications situation in second server and the station, the state of duplex running is recovered in all normal back, at last with picture and the database and the server sync of workstations such as operator station, observed data etc. all normal after, the data importing work of enlargement is promptly accused and is finished.
The above, it only is preferred embodiment of the present utility model, be not that the utility model is done any pro forma restriction, though the utility model discloses as above with preferred embodiment, yet be not in order to limit the utility model, any those skilled in the art, in not breaking away from the technical solutions of the utility model scope, when the technology contents that can utilize above-mentioned announcement is made a little change or is modified to the equivalent embodiment of equivalent variations, in every case be the content that does not break away from technical solutions of the utility model, according to technical spirit of the present utility model to any simple modification that above embodiment did, equivalent variations and modification all still belong in the scope of technical solutions of the utility model.

Claims (5)

1. a monitoring system of electric substation is isolated debug system, it is characterized in that: be included in the fortune Monitor And Control Subsystem and isolate the debugging subsystem, described isolation debugging subsystem comprises debugging server and data transmission media; Described isolation is debugged subsystem and carry out data interaction by this data transmission media between the fortune Monitor And Control Subsystem.
2. monitoring system of electric substation according to claim 1 is isolated debug system, it is characterized in that wherein said the fortune Monitor And Control Subsystem physically with isolate the debugging subsystem and isolate fully.
3. monitoring system of electric substation according to claim 1 is isolated debug system, it is characterized in that wherein said fortune Monitor And Control Subsystem comprise first server and second server, described first server is connected with the substation equipment system respectively with second server.
4. monitoring system of electric substation according to claim 1 is isolated debug system, it is characterized in that wherein said isolation debugging subsystem also comprises switch, and linking to each other with debugging server forms LAN.
5. monitoring system of electric substation according to claim 2 is isolated debug system, and wherein said data transmission media is a hard disk.
CN2010205535950U 2010-10-09 2010-10-09 Isolation debugging system for transformer substation monitor system Expired - Lifetime CN201804274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205535950U CN201804274U (en) 2010-10-09 2010-10-09 Isolation debugging system for transformer substation monitor system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205535950U CN201804274U (en) 2010-10-09 2010-10-09 Isolation debugging system for transformer substation monitor system

Publications (1)

Publication Number Publication Date
CN201804274U true CN201804274U (en) 2011-04-20

Family

ID=43873776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205535950U Expired - Lifetime CN201804274U (en) 2010-10-09 2010-10-09 Isolation debugging system for transformer substation monitor system

Country Status (1)

Country Link
CN (1) CN201804274U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101944778A (en) * 2010-10-09 2011-01-12 华北电网有限公司 Isolation debugging system and debugging method of transformer substation monitoring system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101944778A (en) * 2010-10-09 2011-01-12 华北电网有限公司 Isolation debugging system and debugging method of transformer substation monitoring system
CN101944778B (en) * 2010-10-09 2012-07-04 华北电网有限公司 Isolation debugging system and debugging method of transformer substation monitoring system

Similar Documents

Publication Publication Date Title
CN107167680B (en) RTDS-based power distribution network distributed test system
CN103713214A (en) Intelligent transformer station relay protection closed loop test system
CN101944778B (en) Isolation debugging system and debugging method of transformer substation monitoring system
CN106329720B (en) Detection and debugging method for secondary system of reconstruction and extension project of intelligent substation
CN108646111A (en) A kind of relay protection automatic test approach and system based on 61850 communications
CN107633083A (en) A kind of model matching method of power equipment CIM and production integration system
CN103730894B (en) EMS image checking mehtod and device
CN110865263A (en) Intelligent substation virtual test method based on minimum test system
CN109861860B (en) Method and system for establishing virtual-real link mapping relationship of intelligent substation
CN103837785A (en) Feeder automation detection and simulation system
CN104698374A (en) Method for improving testing efficiency and accuracy of automatic relay protecting tester
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN105680441A (en) Simulated replacement technique-based simulated point-alignment device
CN1972287A (en) Communication protocol record analysis apparatus and its analysis method
CN110086678A (en) Binary channels real-time data acquisition system and acquisition method based on Redis
CN201804274U (en) Isolation debugging system for transformer substation monitor system
CN106781917A (en) It is a kind of to support a pair of power distribution automation Training Simulation Systems of multi-mode
CN107992019B (en) Main station and sub station integrated error-prevention system closed loop test method and system
CN204089191U (en) Power distribution network multiple target is collaborative from the major clique system that becomes
CN106981924B (en) method for synchronizing power monitoring information and station-level comprehensive monitoring system
CN203951261U (en) switchyard fault simulator
CN111010301A (en) Auxiliary on-site module of third-generation intelligent substation and configuration-free method thereof
CN114371355A (en) Self-adaptive joint debugging system for realizing multi-interval point-to-point test of distribution automation terminal
CN108132664B (en) Automatic relay protection information point aligning method suitable for intelligent substation
CN209805504U (en) Power distribution network automation information joint debugging simulation test system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: NORTH CHINA GRID CO., LTD.

Effective date: 20131219

Owner name: NORTH CHINA GRID CO., LTD. BEIJING ELECTRIC DISTRI

Free format text: FORMER OWNER: BEIJING ELECTRIC DISTRIBUTION CO. NORTH CHINA GRID CO., LTD. BEIJING ULTRA-HV COMPANY

Effective date: 20131219

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100053 XUANWU, BEIJING TO: 100031 DONGCHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20131219

Address after: 100031 West Chang'an Avenue, Beijing, No. 86

Patentee after: State Grid Corporation of China

Patentee after: North China Grid Co., Ltd.

Patentee after: Beijing Electric Distribution Co.

Patentee after: Maintenance Branch Company, State Grid Northern Hebei Electric Power Co., Ltd.

Address before: 100053 Beijing city Xuanwu District Street No. 482

Patentee before: North China Grid Co., Ltd.

Patentee before: Beijing Electric Distribution Co.

Patentee before: North China Grid Co., Ltd. Beijing Ultra-HV Company

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110420