CN201803714U - 风积沙路基大比例动态模型 - Google Patents

风积沙路基大比例动态模型 Download PDF

Info

Publication number
CN201803714U
CN201803714U CN201020557030XU CN201020557030U CN201803714U CN 201803714 U CN201803714 U CN 201803714U CN 201020557030X U CN201020557030X U CN 201020557030XU CN 201020557030 U CN201020557030 U CN 201020557030U CN 201803714 U CN201803714 U CN 201803714U
Authority
CN
China
Prior art keywords
roadbed
model
aeolian sand
concrete
scale dynamic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201020557030XU
Other languages
English (en)
Inventor
黄俊文
肖均
张建经
全孝
唐开富
马涛
Original Assignee
China Railway Erju Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN201020557030XU priority Critical patent/CN201803714U/zh
Application granted granted Critical
Publication of CN201803714U publication Critical patent/CN201803714U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

本实用新型公开了一种风积沙路基大比例动态模型,该模型包括模型槽、模型路基、混凝土沥青路面和混凝土沥青路面基础,其中模型路基安放在模型槽底面之上,模型路基由边坡和路基组成,在模型路基的路基之上是混凝土沥青路面基础,紧贴混凝土沥青路基础之上为混凝土沥青路面,在所述的模型路基的表面、路基中部、路基底面都安装有至少一个测试传感器。本实用新型的有益效果是:有效的分析了在车辆荷载重复作用下,路基的动应力、弹性变形及永久变形的变化规律,并且提出了风积沙路基塑性应变与重复荷载作用次数之间符合εp(N)=εp(1)+SlogN这种半对数模式,为高速公路风积沙路基的设计提供了保证。

Description

风积沙路基大比例动态模型
技术领域
本实用新型涉及一种模型,具体涉及一种用于测试风积沙路基动力特性的试验模型。
背景技术
现场试验是研究路基动态特征的基本手段,为研究路基的动态特征提供第一手资料,很多国家都通过现场试验来研究路基的动态特征。如日本研究者对路基动应力和下沉进行了试验,德国队具有不同刚度的路基进行了轮载试验,国内很多专家也通过现场试验对路基的动态特征进行了一系列的研究。
但是室内试验才是研究路基动态特征的最有效方法。现场试验虽然是最直接的,但是有很多局限性。影响路基动态特征的因素很多,例如,行车速度、轴重、路基填土性质等,若都通过现场试验来一一研究是不可行的。但是目前很多室内试验采用的模型仅仅是采用路基填料制作而成的一个很小的扰动样,存在着尺寸效应的影响,试验数据并不准备准确,而且无法进行模拟车辆荷载对路基的作用的试验。
实用新型内容
本实用新型克服了现有技术的不足,提供一种风积沙路基大比例动态模型,该模型结构完备,可以模拟测试车辆荷载对路基的作用,能考虑更多因素对路基动态特征的影响,能更深入更广泛的研究路基的动态特征。
为解决上述的技术问题,本实用新型采用以下技术方案:
一种风积沙路基大比例动态模型,该模型包括模型槽、模型路基、混凝土沥青路面和混凝土沥青路基础,其中模型路基安放在模型槽底面之上,模型路基由边坡和路基组成,在模型路基的路基之上是混凝土沥青路面基础,紧贴混凝土沥青路面基础之上为混凝土沥青路面,在所述的模型路基的表面、路基中部、路基底面都安装有至少一个测试传感器。
所述的混凝土沥青路面上在荷载作用位置处还设置有钢板。
所述的模型路基的表面、路基中部、路基底面分别安装有两个测试传感器。
所述的模型槽高2.1米、宽1.2米、长3.21米。
所述的测试传感器排列为两列。
与现有技术相比,本实用新型的有益效果是:有效的分析了在车辆荷载重复作用下,路基的动应力、弹性变形及永久变形的变化规律,并且提出了风积沙路基塑性应变与重复荷载作用次数之间符合εp(N)=εp(1)+SlogN这种半对数模式,为高速公路风积沙路基的设计提供了保证。
附图说明
图1为本实用新型的结构示意图。
具体实施方式
下面结合附图对本实用新型作进一步阐述。
如图1所示,一种风积沙路基大比例动态模型,该模型包括模型槽4、模型路基3、混凝土沥青路面1和混凝土沥青路面基础2,其中模型路基3安放在模型槽4底面之上,模型路基3由边坡31和路基组成,在模型路基3之上是混凝土沥青路面基础2,紧贴混凝土沥青路面基础2之上为混凝土沥青路面1,在所述的模型路基3的表面、路基中部、路基底面都分别安装有二个测试传感器6。而且这六个测试传感器6整齐排列为两列。所述的混凝土沥青路面1上在荷载作用位置处还设置有钢板5,用于模拟车轮作用,其面积与车轮作用面积相当。模型槽4高2.1米、宽1.2米、长3.21米。模型路基高1.32米,混凝土沥青路面和基层厚度分别为20cm和58cm,当然我们也可以根据需要设计各个组成部分的厚弃和其他参数。
下面再来详细叙述本实新型的加工方法其使用介绍。
模型路基3的填料我们可以选用现场运来的风积沙,当模型槽内路基填筑高度分别达到30cm、60cm、90cm、100cm、132cm时,进行夯实,然后选取两个不同的位置用灌砂法测试压实度,保证所有测试位置的压实度都达到设计压实度96%,为了保证压实质量,当填筑高度达到60cm、100cm和132cm时,都进行了k30试验。
沥青混凝土路面1直接由沥青混凝土生产厂家生产和施工,为了保证底基层的强度在10天内达到要求的强度,用水泥代替了粉煤灰。经过对多个水泥试样在不同天数的单轴强度实验结果进行分析,基层的强度在10天内基本达到了设计要求,证明用水泥代替粉煤灰是可行的。
为防止边坡31在试验过程中发生滑移,确保路基稳定,应对风积沙路基边坡进行防护。在试验中,采用木板来模拟粘土包边材料。
测试传感器6分别埋设于路基表面、路基中部、路基底面,试验测试了动应力、弹性变形和永久变形。动应力使用BY-2型土压力盒,量程为0.5MPa;动变形的测试采用在模型中预先布置沉降板,由电涡流位移传感器测量沉降板的竖向动变形;累计沉降的测试,为了保证实测累计沉降的稳定性,在路基面安装了两个实测路基面永久位移的千分表,在约定的振动次数下,由人工读取累计沉降,见图1一共选择了六个测试位置,当然我们测试位置也可以根据需要放在其他地点。试验中,采用电动伺服激振装置进行加载,最大轴重采用14吨,与重型运煤车量的轴重一致。根据规范,计算出车辆行驶过程中轮胎与路面的接触面积的当量圆直径为213mm,,用等面积的钢板5代替,通过加载装置将荷载作用的钢板5上,然后传递给路面及路基。加载频率设定为3赫兹,这个频率与车辆每小时行驶100公里的频率一致,重复加载100万次。分别在加载到第10次、1000次、100000次、500000次和1000000次时,通过数据采集系统读取各个传感器的试验数据。

Claims (5)

1.一种风积沙路基大比例动态模型,其特征在于:该模型包括模型槽(4)、模型路基(3)、混凝土沥青路面(1)和混凝土沥青路面基础(2),其中模型路基(3)安放在模型槽(4)底面之上,模型路基(3)由边坡和路基组成,在模型路基(3)的路基之上是混凝土沥青路面基础(2),紧贴混凝土沥青路面基础(2)之上为混凝土沥青路面(1),在所述的模型路基(3)的表面、路基中部、路基底面分别安装有至少一个测试传感器(6)。
2.根据权利要求1所述的风积沙路基大比例动态模型,其特征在于:所述的混凝土沥青路面(1)上在荷载作用位置处还设置有钢板(5)。
3.根据权利要求1所述的风积沙路基大比例动态模型,其特征在于:所述的模型路基(3)的表面、路基中部、路基底面分别安装有两个测试传感器(6)。
4.根据权利要求1所述的风积沙路基大比例动态模型,其特征在于:所述的模型槽(4)高2.1米、宽1.2米、长3.21米。
5.根据权利要求3所述的风积沙路基大比例动态模型,其特征在于:所述的测试传感器(6)排列为两列。
CN201020557030XU 2010-10-11 2010-10-11 风积沙路基大比例动态模型 Expired - Lifetime CN201803714U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020557030XU CN201803714U (zh) 2010-10-11 2010-10-11 风积沙路基大比例动态模型

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020557030XU CN201803714U (zh) 2010-10-11 2010-10-11 风积沙路基大比例动态模型

Publications (1)

Publication Number Publication Date
CN201803714U true CN201803714U (zh) 2011-04-20

Family

ID=43873211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020557030XU Expired - Lifetime CN201803714U (zh) 2010-10-11 2010-10-11 风积沙路基大比例动态模型

Country Status (1)

Country Link
CN (1) CN201803714U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102519811A (zh) * 2011-12-16 2012-06-27 山东大学 强度衰减路基变形和应力变化规律试验模型及试验方法
CN103994933A (zh) * 2014-04-23 2014-08-20 深圳市工勘岩土集团有限公司 测量土体变形及吸力的非饱和土体边坡装置及其操作方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102519811A (zh) * 2011-12-16 2012-06-27 山东大学 强度衰减路基变形和应力变化规律试验模型及试验方法
CN102519811B (zh) * 2011-12-16 2014-05-07 山东大学 强度衰减路基变形和应力变化规律试验模型及试验方法
CN103994933A (zh) * 2014-04-23 2014-08-20 深圳市工勘岩土集团有限公司 测量土体变形及吸力的非饱和土体边坡装置及其操作方法

Similar Documents

Publication Publication Date Title
Ishikawa et al. Cyclic deformation of granular material subjected to moving-wheel loads
CN103308401B (zh) 铁路路基大周次加速加载物理模型试验装置的制备方法
Erlingsson Impact of water on the response and performance of a pavement structure in an accelerated test
CN102108656B (zh) 高速铁路无砟轨道路基动力学模型试验系统
Chen et al. Experimental study on dynamic load magnification factor for ballastless track-subgrade of high-speed railway
CN101787716B (zh) 一种研究高速铁路动力响应和长期沉降规律的模型试验装置
Cui et al. In situ tests simulating traffic-load-induced settlement of alluvial silt subsoil
CN109706981B (zh) 高陡边坡桥墩基础受力变形特性的振动台模型测试系统
CN105444731A (zh) 一种交通荷载下路基变形监测模型装置和实验方法
CN110207915B (zh) 一种道砟散体与基床动力响应模型及试验方法
Chen et al. Full-scale field testing on a highway composite pavement dynamic responses
Ebrahimi et al. Protocol for testing fouled railway ballast in large-scale cyclic triaxial equipment
Gräbe Resilient and permanent deformation of railway foundations under principal stress rotation
CN110940571A (zh) 一种模拟棚架结构动态土拱效应的试验装置
Ngo et al. Influence of synthetic inclusions on the degradation and deformation of ballast under heavy-haul cyclic loading
CN201803714U (zh) 风积沙路基大比例动态模型
CN209620130U (zh) 高陡边坡桥墩基础受力变形特性的振动台模型测试系统
Song et al. Pressure distribution under steel and timber crossties in railway tracks
Oliver et al. Mechanical stabilization of unbound layers to increase pavement performance and incorporation of benefits into ME analysis
CN104005393A (zh) 一种路基压实质量测定装置及其测定方法
CN111472243A (zh) 一种路基路面结构综合动态模量的测试方法
CN113624319B (zh) 一种轨道交通环形振动模拟试验装置
CN212077884U (zh) 重复荷载作用下在役公路路基动态模量缩尺测试系统
CN114414182A (zh) 一种包含振动测试的模型箱试验系统及其使用方法
Rao et al. Design and development of a laboratory model for generation of dynamic stress in soil

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160105

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

Address before: 610041, No. nine, No. 156, building B, high building, Xing Xing Road, Chengdu hi tech Zone, Sichuan

Patentee before: China Railway Erju Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee after: China Railway No. 2 Engineering Group Co., Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110420