CN201793612U - Converter bottom-blowing device - Google Patents

Converter bottom-blowing device Download PDF

Info

Publication number
CN201793612U
CN201793612U CN2010202787945U CN201020278794U CN201793612U CN 201793612 U CN201793612 U CN 201793612U CN 2010202787945 U CN2010202787945 U CN 2010202787945U CN 201020278794 U CN201020278794 U CN 201020278794U CN 201793612 U CN201793612 U CN 201793612U
Authority
CN
China
Prior art keywords
gas permeable
permeable brick
converter
tail pipe
blowing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202787945U
Other languages
Chinese (zh)
Inventor
陈建
田义胜
饶江平
孔勇江
刘路长
程华田
林利平
崔辉
杨文军
张嘉严
杨引文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Group Corp
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CN2010202787945U priority Critical patent/CN201793612U/en
Application granted granted Critical
Publication of CN201793612U publication Critical patent/CN201793612U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The utility model relates to a converter bottom-blowing device, comprising an air brick arranged at the bottom of the converter, an air brick tail pipe and a vent pipe, wherein the upper end of the air brick tail pipe is connected with the lower end of the air brick; the converter bottom-blowing device further comprises an air inlet hole arranged at the bottom of a permanent layer of the converter bottom; the vent pipe is transversely arranged in the permanent layer of the converter bottom, one end of the vent pipe is connected with the lower end of the air brick tail pipe in the permanent layer of the converter bottom, and the other end is bent and extends out of the converter through the air inlet hole. The converter bottom-blowing device has the following advantages: as the vent pipe is transversely arranged in the permanent layer of the converter bottom and is connected with the air brick tail pipe in the permanent layer of the converter bottom, a labyrinth passage structure of molten steel is formed at the converter bottom; and when molten steel leaks, the occurrence of leakage of the molten steel can be prevented as molten steel can be cooled before bleeding out.

Description

A kind of converter bottom blowing device
Technical field
The utility model relates to converter, particularly converter bottom blowing device.
Background technology
On modernized mammoth conveter, top bottom compound blowing technology is used comparatively ripe, become the standard configuration of modernized converter substantially, and bottom blowing system need be connected inner gas permeable brick with outside supply air line.
As shown in Figure 1; present method of attachment mainly is directly to pass method; its gas permeable brick tail pipe 3 directly passes the outer back of stove and links to each other with the outer permeability cell 7 of stove; be that furnace bottom air inlet port 6 is under gas permeable brick 1; gas permeable brick tail pipe 3 usefulness protective casings 8 entangle; fill with ramming mass 9 on every side, this kind method is applicable to that furnace bottom adopts the converter of cross building method.For the converter of using annular building method, need the higher precision of building by laying bricks or stones accurate to guarantee contraposition.
The method that directly passes take place in converter bottom the slit when oozing steel owing to there is not the protection of furnace bottom permanent layer, make molten steel very easily from the box hat the bottom blowing hole directly ooze out, enlarged and oozed the steel passage and cause bleed-out.
The utility model content
Technical problem to be solved in the utility model is: a kind of converter bottom blowing device is provided, and this device can prevent that invar water from from the gas permeable brick seepage bleed-out taking place.
The utility model solves the problems of the technologies described above the technical scheme that is adopted:
A kind of converter bottom blowing device, it comprises gas permeable brick, gas permeable brick tail pipe and the permeability cell that is arranged on furnace bottom; The upper end of gas permeable brick tail pipe is connected with the lower end of gas permeable brick; Converter bottom blowing device also comprises the air inlet port that is arranged on furnace bottom permanent layer bottom; Permeability cell is lateral arrangement in the furnace bottom permanent layer, and an end of permeability cell is connected with the lower end of gas permeable brick tail pipe in the furnace bottom permanent layer, stretches out outside the stove by air inlet port after the other end bending of permeability cell.
In the such scheme, connect by the elbow web member between gas permeable brick tail pipe and the permeability cell.
In the such scheme, the gas permeable brick tail pipe is a curved tube.
In the such scheme, gas permeable brick tail pipe and permeability cell are high temperature resistant pipeline.
Advantage of the present utility model is: because permeability cell lateral arrangement in the furnace bottom permanent layer, and in the furnace bottom permanent layer, be connected with the gas permeable brick tail pipe, formed the labyrinth channel structure of molten steel at furnace bottom, during the molten steel seepage, because molten steel can cool off before oozing out, and has avoided the generation of bleed-out.
Description of drawings
Fig. 1 is the structural representation of existing bottom blowing device
Fig. 2 is the structural representation of the utility model device
Fig. 3 is the structural representation of elbow web member
Among the figure: 1-gas permeable brick, 2-furnace bottom permanent layer, 3-gas permeable brick tail pipe, 4-elbow web member, 5-furnace bottom box hat, 6-air inlet port, 7-permeability cell, 8-protective casing, 9-ramming mass.
Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail:
The utility model converter bottom blowing device embodiment as shown in Figure 2, it comprises gas permeable brick 1, gas permeable brick tail pipe 3, permeability cell 7 that is arranged on furnace bottom and the air inlet port 6 that is arranged on furnace bottom permanent layer 2 bottoms, and air inlet port 6 is opened on the furnace bottom box hat 5 of furnace bottom permanent layer 2 bottoms; The upper end of gas permeable brick tail pipe 3 is connected with the lower end of gas permeable brick 1; Permeability cell 7 is lateral arrangement in furnace bottom permanent layer 2, and an end of permeability cell 7 is connected with the lower end of gas permeable brick tail pipe 3 by elbow web member 4 (as shown in Figure 3) in furnace bottom permanent layer 2, stretches out outside the stove by air inlet port 6 after the other end bending of permeability cell 7.
Gas permeable brick tail pipe 3 also is a curved tube.Gas permeable brick tail pipe 3 and permeability cell 7 are high temperature resistant pipeline.
Principle of work of the present utility model is: bottom blown gas enters from permeability cell 7, arrives gas permeable brick 1 by gas permeable brick tail pipe 3, carries out bottom blowing by 1 pair of molten steel of gas permeable brick and stirs.In the work, if the molten steel seepage takes place, then molten steel can flow along gas permeable brick tail pipe 3 and enter permeability cell 7 through web member, because ventilative tail pipe is crooked, so the flow process of molten steel increases greatly, and the junction of gas permeable brick tail pipe 3 and permeability cell 7 is embedded in the furnace bottom permanent layer 2, molten steel is cooling gradually in flowing, avoid the further expansion of seepage, and then avoided the generation of bleed-out, guaranteed the security of producing.

Claims (4)

1. converter bottom blowing device, it comprises gas permeable brick, gas permeable brick tail pipe and the permeability cell that is arranged on furnace bottom; The upper end of gas permeable brick tail pipe is connected with the lower end of gas permeable brick; It is characterized in that: converter bottom blowing device also comprises the air inlet port that is arranged on furnace bottom permanent layer bottom; Permeability cell is lateral arrangement in the furnace bottom permanent layer, and an end of permeability cell is connected with the lower end of gas permeable brick tail pipe in the furnace bottom permanent layer, stretches out outside the stove by air inlet port after the other end bending of permeability cell.
2. converter bottom blowing device according to claim 1 is characterized in that: connect by the elbow web member between gas permeable brick tail pipe and the permeability cell.
3. converter bottom blowing device according to claim 1 and 2 is characterized in that: the gas permeable brick tail pipe is a curved tube.
4. converter bottom blowing device according to claim 1 and 2, it is characterized in that: gas permeable brick tail pipe and permeability cell are high temperature resistant pipeline.
CN2010202787945U 2010-08-03 2010-08-03 Converter bottom-blowing device Expired - Fee Related CN201793612U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202787945U CN201793612U (en) 2010-08-03 2010-08-03 Converter bottom-blowing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202787945U CN201793612U (en) 2010-08-03 2010-08-03 Converter bottom-blowing device

Publications (1)

Publication Number Publication Date
CN201793612U true CN201793612U (en) 2011-04-13

Family

ID=43848531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202787945U Expired - Fee Related CN201793612U (en) 2010-08-03 2010-08-03 Converter bottom-blowing device

Country Status (1)

Country Link
CN (1) CN201793612U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106065426A (en) * 2016-08-01 2016-11-02 北京荣诚京冶科技有限公司 A kind of bottom blowing element supplying oxygen spray powder bottom converter
CN107790693A (en) * 2016-09-06 2018-03-13 鞍钢股份有限公司 Method for preventing steel leakage of steel ladle external-mounted air brick

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106065426A (en) * 2016-08-01 2016-11-02 北京荣诚京冶科技有限公司 A kind of bottom blowing element supplying oxygen spray powder bottom converter
CN106065426B (en) * 2016-08-01 2018-05-29 北京荣诚京冶科技有限公司 A kind of bottom blowing element that oxygen spray powder is supplied for converter bottom
CN107790693A (en) * 2016-09-06 2018-03-13 鞍钢股份有限公司 Method for preventing steel leakage of steel ladle external-mounted air brick

Similar Documents

Publication Publication Date Title
CN101701495A (en) Individualized circulation method for temperature control of bulk concrete
CN201793612U (en) Converter bottom-blowing device
CN103663960B (en) A kind of fibre drawing furnace
CN110846452B (en) Device and method for searching leakage points of damaged cooling wall of blast furnace
CN202539561U (en) Ventilation device capable of preventing negative pressure steel leakage
CN202658177U (en) Bottom blowing protection brick structure for converter
CN203835412U (en) Underwater-roadway leakage processing structure
CN110846053A (en) Coke oven brick gas channel pipe inserting structure
CN204198774U (en) Blast furnace tuyere water leakage alarm device
CN201251194Y (en) Combined sealing device of boiler roof of a generating plant
CN203501741U (en) Electrode hole brick with gas seal device
CN203683725U (en) Carbon fiber heat preserving carrier plate with exhausting device for polycrystalline silicon ingot furnace
CN206843528U (en) RH stoves wind rubber seal with the fire resisting of glass heatproof
CN204918642U (en) Rectilinear hot -blast tubular construction of tuber pipe is mixed in top combustion stove's area
CN209957821U (en) Blast furnace tapping chute observation hole structure
CN204115464U (en) Rotary kiln tuyere
CN204687447U (en) A kind of fire-proof and thermal-insulation sleeve pipe with guiding
CN203948956U (en) The leak test plant of directly buried pipeline
CN206814807U (en) A kind of protective case brick of converter bottom blowing air brick
CN203613214U (en) Pre-buried thermocouple monitoring device for furnace-front iron runner
CN202254887U (en) Water cooling device of exhaust gas smoke tube for silicon metal smelting ore furnace
CN202124638U (en) Dip pipe of steel refining furnace
CN207031467U (en) A kind of energy saving and environment friendly molten iron streamer device
CN202155523U (en) Argon blowing protective piece used for die casting
CN110656213A (en) Blast furnace hot blast stove foundation air leakage repairing structure and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110413

Termination date: 20150803

EXPY Termination of patent right or utility model