CN201785849U - Large-aperture plastic pipeline integral inspection well - Google Patents

Large-aperture plastic pipeline integral inspection well Download PDF

Info

Publication number
CN201785849U
CN201785849U CN2010202651714U CN201020265171U CN201785849U CN 201785849 U CN201785849 U CN 201785849U CN 2010202651714 U CN2010202651714 U CN 2010202651714U CN 201020265171 U CN201020265171 U CN 201020265171U CN 201785849 U CN201785849 U CN 201785849U
Authority
CN
China
Prior art keywords
connecting cylinder
horizontal connecting
pit shaft
inspection well
vertical shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202651714U
Other languages
Chinese (zh)
Inventor
陈志江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN NACHUAN PIPE TECHNOLOGY Co Ltd
Original Assignee
FUJIAN NACHUAN PIPE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN NACHUAN PIPE TECHNOLOGY Co Ltd filed Critical FUJIAN NACHUAN PIPE TECHNOLOGY Co Ltd
Priority to CN2010202651714U priority Critical patent/CN201785849U/en
Application granted granted Critical
Publication of CN201785849U publication Critical patent/CN201785849U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to an inspection well for sewage disposal and water drainage, in particular to a large-aperture plastic pipeline integral inspection well, which comprises a plastic vertical shaft. A plastic transverse connecting drum is connected to the lower portion of the vertical shaft, the transverse connecting drum is provided with at least two adapting openings or insertion openings connected with liquid drainage pipelines, the inner peripheral sections of both the vertical shaft and the transverse connecting drum are circular, the inner diameter of the vertical shaft ranges from 800mm to 2500mm, and the inner diameter of the transverse connecting drum ranges from 300mm to 4000mm. Compared with the prior art, the inspection well has the advantage of extremely simple construction and lower construction cost due to the fact that the vertical shaft can be welded with transverse connecting drums of different sizes and angles in a matching manner according to the actual size and the actual angle of a sewage disposal and water drainage pipeline in a construction site, no seepage at connection positions since the inspection well, the sewage disposal and water drainage pipeline are all made of plastic pipes, and longer service life capable of reaching 50 years.

Description

The integrated manhole of large-bore plastics pipeline
Technical field
The utility model relates to the manhole of a kind of blowdown, drainage pipe inspection usefulness, is meant the integrated manhole in heavy-caliber plastic pipe road especially.
Background technology
The manhole that uses in the prior art is generally brick manhole or concrete prefabricated manhole, and all there are a lot of shortcomings in these two kinds of manholes.Such as brick well, be to lay corresponding draining blow-off line at the construction field (site) earlier by the workman, and then pile up around pipeline with fragment of brick at the scene according to the size of draining blow-off line and the connected mode of pipeline, there is following shortcoming: the one, efficiency of construction is low, construction period is longer, the wasting manpower and material resources; The 2nd, when line size was big, floor space was bigger during construction, and the engineering time is longer, production, life around the influence construction; The 3rd, fragment of brick is difficult to mate with the shape of pipeline, at interface seepage takes place easily, and the life-span is shorter.Concrete prefabricated for another example manhole is prefabricated finishing in factory, assembles at the construction field (site) and is connected, and has following shortcoming: the one, and its on-the-spot mobility is poor, can't adapt to the Iterim Change of line size; The 2nd, be difficult to mate with the shape of pipeline, seepage takes place easily at interface, the life-span is shorter.
The utility model content
Main purpose of the present utility model is to overcome the shortcoming of prior art, provides the large-bore plastics pipeline integrated manhole, applicable to draining, the blow-off line of various sizes.
The utility model adopts following technical scheme:
The integrated manhole of large-bore plastics pipeline, comprise the vertical pit shaft of a plastics system, the bottom of this vertical pit shaft is connected with the horizontal connecting cylinder of a plastics system, this horizontal connecting cylinder has at least two birdsmouths that link to each other with Drainage pipe or socket, the cross section of the internal diameter of this vertical pit shaft and this horizontal connecting cylinder is circle, the internal diameter of this vertical pit shaft is 800-2500mm, and the internal diameter of this horizontal connecting cylinder is 300-4000mm.
According to a better embodiment of the present utility model, described vertical pit shaft is welded on the described horizontal connecting cylinder.
According to a better embodiment of the present utility model, the outer wall of described vertical pit shaft is formed with the scroll ribs or forms level and smooth real wall.
According to a better embodiment of the present utility model, the outer wall of described horizontal connecting cylinder is formed with the scroll ribs or forms level and smooth real wall.
According to a better embodiment of the present utility model, described vertical pit shaft is a high density polyethylene pipe.
According to a better embodiment of the present utility model, described horizontal connecting cylinder is a high density polyethylene pipe.
According to a better embodiment of the present utility model, in the birdsmouth of described horizontal connecting cylinder, be provided with electric fuse.
The integrated manhole of large-bore plastics pipeline of the present utility model in use, at first in factory, produce vertical pit shaft, the horizontal connecting cylinder that weld size does not wait on vertical pit shaft selects installation to get final product according to the real size of on-the-spot blowdown, drainage pipe more then.
By above-mentioned to description of the present utility model as can be known, compared with prior art, the integrated manhole of large-bore plastics pipeline of the present utility model has following beneficial effect:
One, real size and angle according to job site blowdown, drainage pipe, vertically pit shaft can mate weld size and the different horizontal connecting cylinder of angle, it is extremely simple to construct, construction cost is lower, and because manhole and draining, blow-off line are all plastic pipe, its junction leakproof, application life is longer, can reach 50 years;
Two, vertically the outer wall of pit shaft and horizontal connecting cylinder is formed with the scroll ribs or forms level and smooth real wall, makes that the structure of manhole is more firm, and load performance is better;
Three, vertically pit shaft and horizontal connecting cylinder are high density polyethylene pipe, have good heat resistance and cold resistance, and chemical stability is good, also has higher rigidity and toughness, and mechanical strength is good, and dielectric properties, environmental stress crack resistance are also better;
Four, in the birdsmouth of horizontal connecting cylinder, be provided with electric fuse, when being connected, only needing to insert power supply and can finish welding with pipeline, can realize zero seepage.
Description of drawings
Fig. 1 is the structural representation of the utility model specific embodiment one;
Fig. 2 is the structural representation of the utility model specific embodiment two;
Fig. 3 is the side-looking structural representation of the utility model specific embodiment three;
Fig. 4 is the plan structure schematic diagram of the utility model specific embodiment three.
The specific embodiment
Below the utility model will be further described by the specific embodiment.
The specific embodiment one
With reference to Fig. 1, the integrated manhole of heavy-caliber plastic pipe way of the present utility model, comprise the vertical pit shaft 10 of a high density polyethylene (HDPE) system, the bottom of this vertical pit shaft 10 is connected with the horizontal connecting cylinder 20 of a high density polyethylene (HDPE) system, this horizontal connecting cylinder 20 has two birdsmouths that link to each other with Drainage pipe 21,22, the cross section of the internal diameter of this vertical pit shaft 10 and this horizontal connecting cylinder 20 is circle, and the internal diameter of this vertical pit shaft 10 is 1000mm, and the internal diameter of this horizontal connecting cylinder 20 is 900mm.
With reference to Fig. 1, vertically the outer wall of pit shaft 10 is formed with scroll ribs 11, and laterally the outer wall of connecting cylinder 20 is formed with scroll ribs 23; In the birdsmouth 21,22 of horizontal connecting cylinder 20, be provided with electric fuse, such as just being provided with electric fuse 211 in the birdsmouth 21.
The specific embodiment two
With reference to Fig. 2, the integrated manhole of large-bore plastics pipeline of the present utility model, comprise the vertical pit shaft 10 of a high density polyethylene (HDPE) system, the bottom of this vertical pit shaft 10 is connected with the horizontal connecting cylinder 20 of a high density polyethylene (HDPE) system, this horizontal connecting cylinder 20 has two sockets that link to each other with Drainage pipe 21,22, the cross section of the internal diameter of this vertical pit shaft 10 and this horizontal connecting cylinder 20 is circle, and the internal diameter of this vertical pit shaft 10 is 1000mm, and the internal diameter of this horizontal connecting cylinder 20 is 3000mm.
With reference to Fig. 2, vertically the outer wall of pit shaft 10 forms level and smooth real wall 11, and laterally the outer wall of connecting cylinder 20 forms level and smooth real wall 23.
The specific embodiment three
With reference to Fig. 3 and Fig. 4, the difference of this specific embodiment and the specific embodiment two is: vertically the internal diameter of pit shaft 10 is 800-1200mm, vertically the lower end direct heat welding of pit shaft 10 is at the upper side wall of horizontal connecting cylinder 20, and laterally connecting cylinder 20 internal diameters are 1000-4000mm.
Above-mentioned only is two specific embodiment of the present utility model, but design concept of the present utility model is not limited thereto, and allly utilizes this design that the utility model is carried out the change of unsubstantiality, all should belong to the behavior of invading the utility model protection domain.

Claims (9)

1. the integrated manhole of large-bore plastics pipeline, it is characterized in that: comprise the vertical pit shaft of a plastics system, the bottom of this vertical pit shaft is connected with the horizontal connecting cylinder of a plastics system, this horizontal connecting cylinder has at least two birdsmouths that link to each other with Drainage pipe or socket, the cross section of the internal diameter of this vertical pit shaft and this horizontal connecting cylinder is circle, the internal diameter of this vertical pit shaft is 800-2500mm, and the internal diameter of this horizontal connecting cylinder is 300-4000mm.
2. the integrated manhole of large-bore plastics pipeline as claimed in claim 1 is characterized in that: described vertical pit shaft is welded on the described horizontal connecting cylinder.
3. the integrated manhole of large-bore plastics pipeline as claimed in claim 1 or 2 is characterized in that: the outer wall of described vertical pit shaft is formed with the scroll ribs or forms level and smooth real wall.
4. the integrated manhole of large-bore plastics pipeline as claimed in claim 3 is characterized in that: described vertical pit shaft and horizontal connecting cylinder are high density polyethylene pipe.
5. the integrated manhole of large-bore plastics pipeline as claimed in claim 1 or 2 is characterized in that: the outer wall of described horizontal connecting cylinder is formed with the scroll ribs or forms level and smooth real wall.
6. the integrated manhole of large-bore plastics pipeline as claimed in claim 5 is characterized in that: described vertical pit shaft and horizontal connecting cylinder are high density polyethylene pipe.
7. the integrated manhole of large-bore plastics pipeline as claimed in claim 1 or 2 is characterized in that: described vertical pit shaft is a high density polyethylene pipe.
8. the integrated manhole of large-bore plastics pipeline as claimed in claim 1 or 2 is characterized in that: described horizontal connecting cylinder is a high density polyethylene pipe.
9. the integrated manhole of large-bore plastics pipeline as claimed in claim 1 or 2 is characterized in that: be provided with electric fuse in the birdsmouth of described horizontal connecting cylinder.
CN2010202651714U 2010-07-14 2010-07-14 Large-aperture plastic pipeline integral inspection well Expired - Fee Related CN201785849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202651714U CN201785849U (en) 2010-07-14 2010-07-14 Large-aperture plastic pipeline integral inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202651714U CN201785849U (en) 2010-07-14 2010-07-14 Large-aperture plastic pipeline integral inspection well

Publications (1)

Publication Number Publication Date
CN201785849U true CN201785849U (en) 2011-04-06

Family

ID=43817820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202651714U Expired - Fee Related CN201785849U (en) 2010-07-14 2010-07-14 Large-aperture plastic pipeline integral inspection well

Country Status (1)

Country Link
CN (1) CN201785849U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102367684A (en) * 2011-10-25 2012-03-07 江苏通全球工程管业有限公司 Connection structure of well base and pitshaft of inspection well

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102367684A (en) * 2011-10-25 2012-03-07 江苏通全球工程管业有限公司 Connection structure of well base and pitshaft of inspection well

Similar Documents

Publication Publication Date Title
CN201232197Y (en) Combined inspection well
CN201495558U (en) Plastic inspection chamber
CN201665909U (en) Large-caliber plastic tube all-in-one inspection well
CN201495560U (en) Plastic inspection chamber
CN102605803A (en) Inspection well
CN204962055U (en) Dual protection drain pipe
CN201785849U (en) Large-aperture plastic pipeline integral inspection well
CN2881268Y (en) Double-wall corugated pipe with bilayer wall spigot-and socket mouth
CN201464427U (en) Ultrasonic detection pipe of bridge foundation pile
CN204080862U (en) With the waterproof short tube through walls of earrings
CN202500153U (en) Integral ribbed plastic inspection well
CN202227461U (en) Inspection well component capable of being combined rapidly
CN202509613U (en) Launder
KR20120006225A (en) Manhole having dual structure
CN202466792U (en) Inspection well with connection short pipe
CN202865870U (en) Large-scale plastic inspection well
CN209975580U (en) Prefabricated assembled anticorrosive concrete inspection shaft
CN209229184U (en) Drain glass pipe
CN202530553U (en) Inspection well
CN201981553U (en) Plastic pipeline type inspection shaft
CN201738429U (en) Drainage inspection well
CN201972231U (en) Sewage inspection well
CN101539227A (en) Connecting device of drain pipe
CN205314128U (en) Plastic power communication well of integral type
CN202450614U (en) Precast concrete inspection shaft

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110406

Termination date: 20170714

CF01 Termination of patent right due to non-payment of annual fee