CN201778290U - Supporting device capable of rapidly eliminating gaps - Google Patents

Supporting device capable of rapidly eliminating gaps Download PDF

Info

Publication number
CN201778290U
CN201778290U CN2010205379030U CN201020537903U CN201778290U CN 201778290 U CN201778290 U CN 201778290U CN 2010205379030 U CN2010205379030 U CN 2010205379030U CN 201020537903 U CN201020537903 U CN 201020537903U CN 201778290 U CN201778290 U CN 201778290U
Authority
CN
China
Prior art keywords
bracing
bridge
eliminate
strutting arrangement
sphere
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205379030U
Other languages
Chinese (zh)
Inventor
吴智山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Luxing New Road Technology Co Ltd
Original Assignee
Beijing Luxing New Road Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Luxing New Road Technology Co Ltd filed Critical Beijing Luxing New Road Technology Co Ltd
Priority to CN2010205379030U priority Critical patent/CN201778290U/en
Application granted granted Critical
Publication of CN201778290U publication Critical patent/CN201778290U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a supporting device capable of rapidly eliminating gaps, which comprises a base nut. A spiral ejector rod is connected to the center of the base nut in a threaded manner through trapezoidal threads, rotation of a manual twisting lever arranged on the periphery of the spiral ejector rod realizes the lifting function of the spiral ejector rod, an unbalance-loading-resistant pressure head connected to the spiral ejector rod by a spherical-faced isolating pad is capable of sliding along a spherical face, and handheld suspension lugs are arranged on two sides of the base nut. The supporting device can rapidly eliminating the gaps among the bottom of a bridge and bridge pier cushion blocks without affecting stress on a bridge structure.

Description

Can eliminate the bracing or strutting arrangement in gap fast
Technical field
When the utility model relates generally to a kind of bridge lifting, be used for eliminating fast the bracing or strutting arrangement that supports the gap, do not influence bridge force-bearing.
Background technology
In the maintenance of the reconstruction of road and bridge, it is inevitable that the increasing of the replacing of bearing and bridge floor transformed.Because it is at existing bridge that bridge pad replacing or bridge floor are increased, its constructure scheme is subjected to the influence of many factors, as headroom, substructure form etc. at the bottom of bridge construction type, span, section form, the beam, situation varies, and is difficult to provide unified job practices.The method of bearing replacement has many, is abound with cribbing method, steel nose girder method, saddle type support method etc. as traditional sleeper, and these methods need be on stable ground, and the support that building structure is very strong is placed heavy large-scale jack on support.Along with the development of hydraulic technique, the jacking ability of super book type jack is increasing, can satisfy the requirement of up to a hundred tons of weight, and body height is low, can directly be placed in the narrow space.Present most bridge lifting all adopts super book type jack, and also comparative maturity of the construction technology of this respect.
Because fast, safely and efficiently raising jack-up construction efficient and assurance bridge construction quality being had great significance of bridge jacking construction technology, therefore though adopt ultrathin jack can satisfy the requirement of the low and up to a hundred tons of weight of headroom at the bottom of the beam, but the bridge jacking height needs to adopt the construction method of falling the top application just can finish the bridge jacking process often because stroke is not enough.For example: headroom has only several centimeters bridge need be raised to tens centimeters or tens centimeters at the bottom of the beam, if do not build steel structure support in order to reduce expenses, just can only adopt super book type jack, and place it on the bridge pier under the bridge, finish the jacking of bridge by falling the method on top.Need on bridge pier, place lip block before switching jack, so that the beam that falls uses.Because the lip block at every place is different with the gap between the bridge bottom, generally in 1~10mm scope, traditional method is the employing manual method, just squeezes into the book steel plate with hammer and timber wedge is eliminated the gap.
Because present most bridge all adopts super book type jack to change bearing or increase bridge floor, caused and paid attention to how synchronization of jacking up, having despised the asynchronous of the construction method of falling the top also has bigger influence to bridge equally.Because there is following problem in the construction method of falling the top application: 1. because the cushion block at every place is different because of compress variation behind the beam that falls with backing plate, after repeatedly switching construction, the error of accumulation may cause bridge deflection or skew, seriously can cause the bridge construction unbalance stress, bring unsafe hidden danger for the structure of bridge; 2. because the job site need be with the cushion block material of a large amount of different-thickness, so the field operation workload is big, and the part material can only use once, causes waste; 3. in the man-hour of falling the top application, use hammer to squeeze into book steel plate and timber wedge, efficiency of construction is low; 4. can not guarantee to fall synchronous altitude behind the beam.So adopt this construction method of falling top application efficiency of construction low and cost is high.
The utility model content
When the problem that the utility model need solve provides a kind of bridge lifting, be used for eliminating fast the bracing or strutting arrangement that supports the gap, do not influence bridge force-bearing.
For solving the problems of the technologies described above, technical scheme that the utility model adopts is:
A kind ofly can eliminate the bracing or strutting arrangement in gap fast, comprise the base nut, its center is provided with the spiral push rod that is threaded, and the manual strand thick stick that is provided with by spiral push rod periphery rotates and makes described spiral push rod realize elevating function; Described spiral push rod connects the anti-bias load pressure head by the sphere dottle pin, and anti-bias load pressure head bottom is the sphere of projection, and there is the through hole of a band boss at the center, can slide along sphere; Described sphere dottle pin top is recessed sphere, and the bottom is the awl cylinder, and there is a through hole at the center; Described spiral push rod head periphery has 6 uniform blind holes, and centre bore is tubaeform, and there is the through hole of a band boss its underpart; Hanger is held in the both sides of described base nut.
Further, the described trapezoidal thread that is threaded to;
Further, described sphere dottle pin is a polytetrafluoroethylmaterial material.
The utility model becomes rotatablely moving of spiral push rod into the oscilaltion of anti-bias load pressure head and moves owing to utilize screw-drive mechanism, supports the gap thereby can eliminate fast and effectively; Sphere dottle pin wear-resisting and that sliding-frictional resistance is little is housed between spiral push rod head and anti-bias load pressure head, can reduces friction; The bottom design of anti-bias load pressure head is become sphere, can solve the uneven problem in bridge bottom.Though the support device structure that can eliminate the gap fast described in the utility model is simple, during operation and leicht fallen D/A.Volume is the helical rotation mechanism of φ 110 * 80mm, and heavily about 7 kilograms, adjustable height 30mm manually twists the long 200mm of thick stick, and pretightning force can reach 2000 kilograms, only needs the power of pulling with 12 kilograms, and supporting capacity can reach 100 tons.So easy to operate, the efficiency of construction height, supporting capacity is big, and, can use repeatedly, reduce construction cost greatly.
Description of drawings
With embodiment the utility model is described in further detail with reference to the accompanying drawings below.
Fig. 1 is the structure sectional view of bracing or strutting arrangement described in the utility model;
Fig. 2 is the vertical view of bracing or strutting arrangement described in the utility model;
Fig. 3 is the schematic diagram of unbalance loading angle δ after the device described in the utility model jack-up and between the bridge bottom;
Fig. 4 uses scheme of installation for the utility model device.
Among the figure: 1, anti-bias load pressure head; 2, sphere dottle pin; 3, spiral push rod; 4, base nut; 5, hold hanger; 6, manually twist thick stick; 7, bridge; 8, bridge pier; 9, jack; 10, oil pipe; 11, bracing or strutting arrangement; 12, cushion block.
The specific embodiment
Shown in Fig. 1 to 2, a kind ofly can eliminate the bracing or strutting arrangement in gap fast, comprise base nut 4, its center is provided with the spiral push rod 3 that is threaded, and the manual strand thick sticks 6 that are provided with by spiral push rod 3 peripheries rotate and make described spiral push rod 3 realize elevating functions; The described trapezoidal thread that is threaded to; Described spiral push rod 3 connects anti-bias load pressure head 1 by sphere dottle pin 2, and anti-bias load pressure head 1 bottom is the sphere of projection, and there is the through hole of a band boss at the center, can slide along sphere; Described sphere dottle pin 2 tops are recessed sphere, and the bottom is the awl cylinder, and there is a through hole at the center, is polytetrafluoroethylmaterial material; Described spiral push rod 3 head peripheries have 6 uniform blind holes, and centre bore is tubaeform, and there is the through hole of a band boss its underpart; Hanger 5 is held in the both sides of described base nut 4.
Fig. 3 provided after the device described in the utility model jack-up and the bridge bottom between the schematic diagram of unbalance loading angle δ, anti-bias load pressure head 1 contacts with bridge 7 bottom surfaces, base nut 4 is supported on the bridge pier 8.
The concrete mode of occupation in scene of the present utility model as shown in Figure 4, at first lift bridge 7 by hydraulic jack 9, placing bracing or strutting arrangement 11 described in the utility model near jack 9 sides then, base nut 4 pads are placed on the cushion block (steel plate) 12, manually strand thick stick 6 one ends insert in spiral push rod 3 holes, fix base nut 4 simultaneously, rotate spiral push rod 3, tightly withstand up to anti-bias load pressure head 1 till the bottom surface of bridge 7 by the jacking direction.Can eliminate the bottom of bridge 7 and the gap between the cushion block 12 on the bridge pier 8 so easily and quickly, hydraulic oil in the jack 9 are let out by oil pipe 10 get back in the fuel tank, the height of decline jack is to body height, bracing or strutting arrangement 11 described in the utility model can stably support the weight of bridge 7 simultaneously, play jack 9 with hassock piece pad then, again jack-up bridge 7 again, so repeated multiple times reaches till the predetermined altitude always.

Claims (7)

1. can eliminate the bracing or strutting arrangement in gap fast for one kind, it is characterized in that: comprise base nut (4), its center is provided with the spiral push rod (3) that is threaded, and manual strand thick stick (6) rotation that is provided with by spiral push rod (3) periphery makes described spiral push rod (3) realize elevating function; Described spiral push rod (3) connects anti-bias load pressure head (1) by sphere dottle pin (2), and described anti-bias load pressure head (1) can slide along sphere.
2. according to claim 1ly can eliminate the bracing or strutting arrangement in gap fast, it is characterized in that: described anti-bias load pressure head (1) bottom is the sphere of projection, and there is the through hole of a band boss at the center.
3. according to claim 1ly can eliminate the bracing or strutting arrangement in gap fast, it is characterized in that: the described trapezoidal thread that is threaded to.
4. according to claim 1ly can eliminate the bracing or strutting arrangement in gap fast, it is characterized in that: described sphere dottle pin (2) top is recessed sphere, and the bottom is the awl cylinder, and there is a through hole at the center.
5. according to claim 1ly can eliminate the bracing or strutting arrangement in gap fast, it is characterized in that: described sphere dottle pin (2) is a polytetrafluoroethylmaterial material.
6. according to claim 1ly can eliminate the bracing or strutting arrangement in gap fast, it is characterized in that: described spiral push rod (3) head periphery has 6 uniform blind holes, and centre bore is tubaeform, and there is the through hole of a band boss its underpart.
7. according to claim 1ly can eliminate the bracing or strutting arrangement in gap fast, it is characterized in that: hanger (5) is held in the both sides of described base nut (4).
CN2010205379030U 2010-09-21 2010-09-21 Supporting device capable of rapidly eliminating gaps Expired - Fee Related CN201778290U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205379030U CN201778290U (en) 2010-09-21 2010-09-21 Supporting device capable of rapidly eliminating gaps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205379030U CN201778290U (en) 2010-09-21 2010-09-21 Supporting device capable of rapidly eliminating gaps

Publications (1)

Publication Number Publication Date
CN201778290U true CN201778290U (en) 2011-03-30

Family

ID=43791505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205379030U Expired - Fee Related CN201778290U (en) 2010-09-21 2010-09-21 Supporting device capable of rapidly eliminating gaps

Country Status (1)

Country Link
CN (1) CN201778290U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949134A (en) * 2010-09-21 2011-01-19 北京市路兴公路新技术有限公司 Supporting device capable of rapidly eliminating gap
CN103487535A (en) * 2012-06-08 2014-01-01 北京普源精电科技有限公司 Injection pump of automatic sample injector

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949134A (en) * 2010-09-21 2011-01-19 北京市路兴公路新技术有限公司 Supporting device capable of rapidly eliminating gap
CN103487535A (en) * 2012-06-08 2014-01-01 北京普源精电科技有限公司 Injection pump of automatic sample injector

Similar Documents

Publication Publication Date Title
CN102108786B (en) Overall lifting construction method of ultra-large type building member and device thereof
CN202416183U (en) Bent cap collar-clamp type cast support
CN208933818U (en) A kind of road and bridge support
CN109252530A (en) A kind of base pit engineering support safeguard and its application method
CN201778290U (en) Supporting device capable of rapidly eliminating gaps
CN101949134A (en) Supporting device capable of rapidly eliminating gap
CN202755456U (en) Building jacking system
CN102900240B (en) Unloading method for construction pillar in building
CN201695337U (en) Straight-line segment bracket of side pier of grouting continuous beam
CN208950360U (en) A kind of auxiliary support mechanism of building structure strengthening
CN201121294Y (en) Hydraulic sliding device
CN206705525U (en) A kind of girder bending-down prosthetic device for bridge crane
CN203099228U (en) Anchor bolt leveling structure
CN205259066U (en) Bridge panel
CN204151670U (en) Pressure-adjusting type bridge bearing pad
CN211341757U (en) Cast-in-place formwork for house construction
CN102704398B (en) Jacking construction method of capping beam
CN208716799U (en) A kind of power engineering earth anchor dismounting device
CN208455626U (en) A kind of rockbolt static pressure steel pipe pile structure for building
CN203855991U (en) Device for conducting anti-pulling frictional resistance test on bed rock
CN201738239U (en) Vice cable saddle structure for bridges
CN206570707U (en) A kind of bridge stiffening device
CN205223842U (en) Cable -stay bridge structure system prevents that negative reaction structure from appearing in girder
CN214309934U (en) Single particle strength testing device under three-dimensional rigid loading condition
CN105398544B (en) Tug anchor device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110330

Termination date: 20150921

EXPY Termination of patent right or utility model