CN201775972U - Tower with novel structure - Google Patents

Tower with novel structure Download PDF

Info

Publication number
CN201775972U
CN201775972U CN2009201093953U CN200920109395U CN201775972U CN 201775972 U CN201775972 U CN 201775972U CN 2009201093953 U CN2009201093953 U CN 2009201093953U CN 200920109395 U CN200920109395 U CN 200920109395U CN 201775972 U CN201775972 U CN 201775972U
Authority
CN
China
Prior art keywords
tower
plate
seal pot
new structure
mass transfer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201093953U
Other languages
Chinese (zh)
Inventor
王宝华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING XIANFENG INNOVATION AND TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
BEIJING XIANFENG INNOVATION AND TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING XIANFENG INNOVATION AND TECHNOLOGY DEVELOPMENT Co Ltd filed Critical BEIJING XIANFENG INNOVATION AND TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN2009201093953U priority Critical patent/CN201775972U/en
Application granted granted Critical
Publication of CN201775972U publication Critical patent/CN201775972U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Vaporization, Distillation, Condensation, Sublimation, And Cold Traps (AREA)

Abstract

The utility model discloses a tower with a novel structure, relating to the mass transfer course in the industrial field and belonging to the field of a gas-liquid mass transfer device. A liquid receiving disc and supporting angle iron in the tower are manufactured into a whole body so as to enhance the processing efficiency and the levelness of tower plates; a liquid dropping plate and the liquid receiving disc are manufactured into a detachable mode so as to be convenient for the assembly, the maintenance and the cleaning of equipment; and a safety plate is arranged above each manhole, i.e. below the lowest tower plate of the tower body so as to take the action of protecting workers when the tower is installed and maintained. The tower can be used for the mass transfer course in the fields of chemical industry, petrochemical industry, light industry, metallurgy and the like, and has the advantages of simple structure, low cost, obvious economic benefit and the like.

Description

A kind of tower of new structure
Technical field
The utility model relates to a kind of tower of new structure, belongs to the mass transfer apparatus field in the industrial process such as Chemical Engineering.
Background technology
The mass transfer apparatus that uses in industrial production such as chemical industry, oil, light industry, metallurgy mainly contains plate column and packed tower two big classes, plate column since anti-stifled tower performance good, be easy to cleaning, lower etc. former thereby obtained using widely for big tower expense, but also exist some problems in the real world applications, these problems have hindered further developing of plate column.For example: in traditional tower, support angle steel and seal pot welds, in the process of welding, be easy to be out of shape, make whole tower tray out-of-flatness, thereby make the liquid layer thickness inequality, influenced the mass transfer effect between gas-liquid two-phase; Down-flow plate is welded on the inner wall of tower in traditional tower, thereby makes the zone between down-flow plate and the inner wall of tower be difficult to safeguard and clean; Seal pot is welded on the inner wall of tower in traditional tower, thereby makes take action in the process of tower tray installation, maintenance and cleaning unusual inconvenience of workman; In installation and maintenance process, the workman enters in the tower from manhole, some equipment that the workman carries fall down possibly because of carelessness, smash following equipment, even injure following workman by a crashing object, if protective equipment is not set, will drops at the bottom of the tower when workman accidentally drops because of carelessness, thereby workman's health will be caused serious injury in the tower.
Summary of the invention
The utility model purpose is to provide a kind of tower of new structure, the problem of being mentioned above this tower can effectively solve.
In order to achieve the above object, the utility model has adopted following technical scheme: support angle steel 1 and seal pot 2 to make one; Down-flow plate 4 is made the detachable part that hangs on the flat otic placode 3; Seal pot 2 is made the detachable part that hangs on the female lug plate 8; Above each manhole 10, promptly below these part tower body 5 bottom column plates, a guard plate 9 is set, guard plate 9 is percent opening one group of sieve plate greater than column plate 7, even also do not pull down when maintenance.
The utility model compare with known technology can comment as follows:
Support angle steel 1 and seal pot 2 to make one, can improve working (machining) efficiency like this, reduce welding capacity, reduce distortion, make that column plate 7 mounting planes are more flat, thereby improve the levelness of column plate 7; Down-flow plate 4 is made the detachable part that hangs on the flat otic placode 3, is convenient to assemble tower, is convenient to safeguard and clears up small space in the downspout; Seal pot 2 is made removable, is convenient to the maintenance and the cleaning of seal pot 2 and other tower internals; Above each manhole 10; promptly below these part tower body 5 bottom column plates, a guard plate 9 is set; so both gas can be evenly distributed on the tower section; again can be with the article that fall down in this section; or the people accidentally drops and all tackles when falling down, and installation, maintenance and cleaning are played a protective role.
Description of drawings
Specific embodiments of the present utility model is described in detail as follows with reference to accompanying drawing:
Fig. 1 is the tower overall schematic of new structure.
Fig. 2 supports angle steel and seal pot structural representation.
Fig. 3 is removable down-flow plate structural representation.
Fig. 4 is removable seal pot structural representation.
Fig. 5 is the guard plate position view.
Among the figure: 1 for supporting angle steel, and 2 is seal pot, and 3 is flat otic placode, and 4 is down-flow plate, and 5 is tower body, and 6 is securing member, and 7 is column plate, and 8 is the female lug plate, and 9 is guard plate, and 10 is manhole.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in further details.
As shown in Figure 2, support angle steel 1 and seal pot 2 to make one, can improve working (machining) efficiency like this, reduce welding capacity, reduce distortion, make that column plate 7 mounting planes are more flat, improve the levelness of column plate 7, thereby make that liquid level thickness is more even on the tower tray, and then the separative efficiency, the fluid that improve column plate 7 flow flux and output.
As shown in Figure 3, earlier at two flat otic placodes 3 of inner wall of tower appropriate location welding, down-flow plate 4 is connected on the flat otic placode 3 by securing member 6, be convenient to assemble tower, down-flow plate 4 can be removed when maintenance and cleaning tower internals, so reached the purpose of safeguarding and clearing up the interior small space of downspout easily.
As shown in Figure 4, at two blocks of female lug plates 8 of inner wall of tower appropriate location welding, seal pot 2 is fixed on the female lug plate 8 by securing member 6 earlier, and seal pot 2 just can be pulled down when needed easily like this, is convenient to the maintenance and the cleaning of seal pot 2 and other tower internals.
As shown in Figure 5, above each manhole 10, promptly below these part tower body 5 bottom column plates a guard plate 9 is set, guard plate 9 is percent opening one group of sieve plate greater than column plate 7, even also do not pull down when maintenance.It both can be evenly distributed on gas on the tower section, improved the mass-transfer efficiency of gas-liquid two-phase, and the workman that can tackle the article that fall down in this section or accidentally drop and fall down plays a protective role to installation, maintenance and cleaning again.
Embodiment: adopt the tower of the new structure of the utility model announcement that the vinyl chloride system is separated, feed rate is 45m 3/ h, wherein vinyl chloride accounts for 90% (mass percent, down together), and dichloroethanes accounts for 3%, and acetylene accounts for 2%, and water accounts for 1%, and all the other are trace impurity.Tower height is 25m, and tower diameter is 2m, 40 layers of column plate, and distance between plates is 400mm.After the tower of the new structure that process the utility model is announced was handled, cat head vinyl chloride accounted for 85%, and acetylene accounts for 14%, and other is a light impurity.Vinyl chloride accounts for 95% at the bottom of the tower, and dichloroethanes accounts for 3.2%, and water accounts for 1.2%, and all the other are heavy seeds, has reached good separating effect.The identical traditional tower of size approximately needed 2~3 days finish installation, and the tower of the new structure that the utility model is announced only needed 1 day just can finish installation, and in the maintenance afterwards maintenance time shortened to 1 day by original 2~3 days.

Claims (5)

1. the tower of a new structure, this tower is by supporting angle steel (1), seal pot (2), down-flow plate (4), column plate (7) and manhole parts such as (10) to form, it is characterized in that: change the connected mode of supporting between angle steel (1) and seal pot (2), down-flow plate (4) and seal pot (2) and the tower body (5), and in tower, be provided with guard plate (9).
2. the tower of a kind of new structure according to claim 1 is characterized in that: support angle steel (1) and seal pot (2) to make one in this tower.
3. the tower of a kind of new structure according to claim 1, it is characterized in that: down-flow plate (4) is made the detachable part that hangs on the flat otic placode (3).
4. the tower of a kind of new structure according to claim 1, it is characterized in that: seal pot (2) is made the detachable part that hangs on the female lug plate (8).
5. the tower of a kind of new structure according to claim 1, it is characterized in that: top in each manhole (10), promptly below the bottom column plate of this part tower body a guard plate (9) is set, guard plate (9) is the one group sieve plate of percent opening greater than column plate.
CN2009201093953U 2009-06-29 2009-06-29 Tower with novel structure Expired - Lifetime CN201775972U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201093953U CN201775972U (en) 2009-06-29 2009-06-29 Tower with novel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201093953U CN201775972U (en) 2009-06-29 2009-06-29 Tower with novel structure

Publications (1)

Publication Number Publication Date
CN201775972U true CN201775972U (en) 2011-03-30

Family

ID=43789206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201093953U Expired - Lifetime CN201775972U (en) 2009-06-29 2009-06-29 Tower with novel structure

Country Status (1)

Country Link
CN (1) CN201775972U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101934158B (en) * 2009-06-29 2012-04-18 北京先锋创新科技发展有限公司 Novel tower equipment
CN103007693A (en) * 2012-12-21 2013-04-03 泰州职业技术学院 Gas-liquid mass transfer equipment
CN103310698A (en) * 2013-07-05 2013-09-18 辽宁石化职业技术学院 Plate type tower section for teaching
CN106799059A (en) * 2017-03-17 2017-06-06 河南中托力合化学有限公司 Energy-saving hexane precise distillation apparatus

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101934158B (en) * 2009-06-29 2012-04-18 北京先锋创新科技发展有限公司 Novel tower equipment
CN103007693A (en) * 2012-12-21 2013-04-03 泰州职业技术学院 Gas-liquid mass transfer equipment
CN103310698A (en) * 2013-07-05 2013-09-18 辽宁石化职业技术学院 Plate type tower section for teaching
CN106799059A (en) * 2017-03-17 2017-06-06 河南中托力合化学有限公司 Energy-saving hexane precise distillation apparatus

Similar Documents

Publication Publication Date Title
CN201775972U (en) Tower with novel structure
CN201997161U (en) Multifunctional efficient filter
CN101934158B (en) Novel tower equipment
CN201308790Y (en) Second-stage industrial water filtering and iron-removing system
CN202078765U (en) Stripping tower
CN107470024A (en) A kind of machining center board cooling liquid filtering apparatus
CN107952314A (en) A kind of graphite production chip-discharging filtering device
CN202207493U (en) Full-automatic filter
CN207357351U (en) A kind of machining center board cooling liquid filtering apparatus
CN201862301U (en) Blast furnace slag washing water filter
CN208660485U (en) It is a kind of convenient for fixed environmental protection sewage-treatment plant
CN102179103B (en) Filtering and slag-discharging system
CN201579277U (en) Large-water quantity lower high-density straight collecting pipe cooling device
CN201346419Y (en) Microporous ceramic filter
CN203002133U (en) Acid mist collection device
CN203065533U (en) Simple wear-resistant ball oil draining device
CN204469327U (en) Foreign material are separated recoiling device
CN201665575U (en) Filter-material intercept device and aeration biofilter with filter-material intercept device
CN205796740U (en) A kind of drawer type Multistage filtering device
CN205603690U (en) Electrolysis trough chlorine cooling device
CN216366921U (en) A high-efficient filtration equipment of many shunt tubes for industrial waste water
CN211565309U (en) Cutting fluid circulation refrigerating system
CN203043962U (en) Scale depositing basket
CN201978592U (en) Improved structure of filtering barrel
CN209885985U (en) Lubricating oil multi-stage filter device

Legal Events

Date Code Title Description
DD01 Delivery of document by public notice

Addressee: Wang Baohua

Document name: Notification to Go Through Formalities of Registration

C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110330