CN201773317U - Fieldbus control system used for teaching - Google Patents
Fieldbus control system used for teaching Download PDFInfo
- Publication number
- CN201773317U CN201773317U CN2010202965548U CN201020296554U CN201773317U CN 201773317 U CN201773317 U CN 201773317U CN 2010202965548 U CN2010202965548 U CN 2010202965548U CN 201020296554 U CN201020296554 U CN 201020296554U CN 201773317 U CN201773317 U CN 201773317U
- Authority
- CN
- China
- Prior art keywords
- bus
- profibus
- teaching
- control system
- control unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Control By Computers (AREA)
Abstract
The utility model relates to a fieldbus control system (FCS) used for teaching, which is applied to the fields of process control, industrial automation and the like. The FCS comprises an industrial Ethernet, an upper PROFIBUS-DP bus and a lower PROFIBUS-DP bus, wherein a host monitoring computer is connected with a host server through the industrial Ethernet, the host server is connected with a field main control unit through the upper PROFIBUS-DP bus, the field main control unit is connected with an ET200M distributed-type I/O through the lower PROFIBUS-DP bus, and the interfaces of the ET200M distributed-type I/O are connected with controlled objects respectively. The utility model has the advantages that: the FCS adopts the control technique that can build an integral networked fieldbus control experiment, provides an appropriate hardware platform for theoretical researches, and provides the teachers with the verification platform of researches in the theoretical level.
Description
Technical field
The utility model relates to a kind of teaching equipment, particularly a kind of teaching field bus control system that is applicable to process control, industrial automation and relevant speciality.
Background technology
On-the-spot vertically technology is the development trend of the industrial control technology that generally believes in the present industrial automation industry.The widespread use of field bus technique makes institution of higher learning to the field bus control system experiment device for teaching a large amount of demands arranged.The field bus control system of practical application is many owing to counting in the Industry Control, distribution is wide, is not suitable for directly as experiment device for teaching.Though be applicable to that in the market the experiment device for teaching of automatic field is a lot, also do not have the experiment device for teaching of complete embodiment Field Bus Control Technology characteristics.
Summary of the invention
The purpose of this utility model is exactly the weak point in the background technology, and a kind of teaching field bus control system is provided.
For achieving the above object, the utility model adopts following technical scheme: the teaching field bus control system, it comprises Industrial Ethernet, last PROFIBUS-DP bus, following PROFIBUS-DP bus, the upper monitoring computing machine connects with director server by Industrial Ethernet, director server is connected with on-the-spot main control unit by last PROFIBUS-DP bus, the PROFIBUS-DP bus was connected with ET200M distributed I/O under on-the-spot main control unit passed through, and the interface of ET200M distributed I/O connects respectively at controlling object.
For a kind of optimization of the present utility model, the platform number of described upper monitoring computing machine is less than or equal to 16.
The utility model is compared with background technology, has to have built a whole network fieldbus experiment control technology, and suitable theoretical research hardware platform is provided, and makes the teacher in the research of theoretical level verification platform freely be arranged.
Description of drawings
Fig. 1 is the theory structure synoptic diagram of teaching with field bus control system.
Embodiment
Embodiment 1: with reference to Fig. 1.The teaching field bus control system, it comprises Industrial Ethernet 1, last PROFIBUS-DP bus 2, following PROFIBUS-DP bus 3, upper monitoring computing machine 4 connects with director server 5 by Industrial Ethernet 1, director server 5 is connected with on-the-spot main control unit 6 by last PROFIBUS-DP bus 2, PROFIBUS-DP bus 3 was connected with ET200M distributed I/O 7 under on-the-spot main control unit 6 passed through, and the interface of ET200M distributed I/O 7 connects respectively at controlling object 8.The platform number of described upper monitoring computing machine 4 is less than or equal to 16.
The upper monitoring computing machine 4 that CP5611-DP address card and WinCC human interface software be installed is by Industrial Ethernet 1 communication that links to each other with S7-300PLC (CPU315-2DP), S7-300PLC (CPU315-2DP) is director server 5, its slave station is ET200M distributed I/O 7, and it is made up of IM153DP communication module, analog quantity load module, analog output module and digital quantity input/output module.ET200M distributed I/O 7 links to each other with simulation controlling object 8 by cable respectively, and respectively simulation controlling object 8 is controlled.
Claims (2)
1. teaching field bus control system, it is characterized in that: it comprises Industrial Ethernet, last PROFIBUS-DP bus, following PROFIBUS-DP bus, the upper monitoring computing machine connects with director server by Industrial Ethernet, director server is connected with on-the-spot main control unit by last PROFIBUS-DP bus, the PROFIBUS-DP bus was connected with ET200M distributed I/O under on-the-spot main control unit passed through, and the interface of ET200M distributed I/O connects respectively at controlling object.
2. teaching field bus control system according to claim 1 is characterized in that: the platform number of described upper monitoring computing machine is less than or equal to 16.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202965548U CN201773317U (en) | 2010-08-17 | 2010-08-17 | Fieldbus control system used for teaching |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202965548U CN201773317U (en) | 2010-08-17 | 2010-08-17 | Fieldbus control system used for teaching |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201773317U true CN201773317U (en) | 2011-03-23 |
Family
ID=43753159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202965548U Expired - Fee Related CN201773317U (en) | 2010-08-17 | 2010-08-17 | Fieldbus control system used for teaching |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201773317U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103794109A (en) * | 2012-11-01 | 2014-05-14 | 同济大学 | Electric power control system with simulation training function, and simulation training method thereof |
-
2010
- 2010-08-17 CN CN2010202965548U patent/CN201773317U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103794109A (en) * | 2012-11-01 | 2014-05-14 | 同济大学 | Electric power control system with simulation training function, and simulation training method thereof |
CN103794109B (en) * | 2012-11-01 | 2016-04-20 | 同济大学 | There is electric control system and the emulation training method thereof of emulation training function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102854870B (en) | Distributed control system and data report generating method | |
CN103135536B (en) | Data collection system (DCS) and information processing method of computer production simulation model | |
CN102608946A (en) | Programmable logic controller (PLC) experimental system | |
CN105549551A (en) | Interaction method of three-dimensional virtual power station and operation data | |
CN101526805A (en) | PLC analog control system and analog control method thereof | |
CN108154297A (en) | A kind of factory management system and information processing method | |
CN202196324U (en) | Intelligent area controller | |
CN201773317U (en) | Fieldbus control system used for teaching | |
CN213277033U (en) | Multiprocessor industrial Internet of things gateway for educational training | |
CN103676669A (en) | Method and system for checking motion information | |
CN203430525U (en) | Shield distribution type PLC control system based on controller | |
CN202018588U (en) | Configuration type process control test device | |
CN202230624U (en) | Computer comprehensive simulation experiment platform based on PLC | |
CN204557889U (en) | Distributed pneumatic control multi-function test stand | |
CN103095739A (en) | Cabinet server system and node communication method thereof | |
CN104978514A (en) | Cloud desktop education system | |
CN104283872A (en) | Remote controller supporting CAN controller and PLC | |
CN204331449U (en) | Based on the SCADA intelligent monitoring dispatching system of GDI | |
CN110098991B (en) | Equipment for accessing EtherCAT bus system to universal Internet of things cloud platform | |
CN202548562U (en) | PLC (Programmable Logic Controller) experiment system | |
CN204480299U (en) | A kind of imictron interconnection system and adopt the neuron chip of this system | |
Mora-Salinas et al. | Virtual labs: 5 ways to connect with Factory IO for mechatronics engineering courses | |
CN205882853U (en) | Intelligent substation telemechanical communication debugging simulation equipment | |
CN201122985Y (en) | Network type programmable controller group-control experimental device | |
CN204965074U (en) | CPU module of DDC intelligence hardware |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110323 Termination date: 20140817 |
|
EXPY | Termination of patent right or utility model |