CN201763033U - Three-tube communication tower - Google Patents

Three-tube communication tower Download PDF

Info

Publication number
CN201763033U
CN201763033U CN2010202946142U CN201020294614U CN201763033U CN 201763033 U CN201763033 U CN 201763033U CN 2010202946142 U CN2010202946142 U CN 2010202946142U CN 201020294614 U CN201020294614 U CN 201020294614U CN 201763033 U CN201763033 U CN 201763033U
Authority
CN
China
Prior art keywords
main material
flange
tower
communication towers
regular triangular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202946142U
Other languages
Chinese (zh)
Inventor
张宏冉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG JUYE TENGDA ELECTROCHEMISTRY EQUIPMENT CO Ltd
Original Assignee
SHANDONG JUYE TENGDA ELECTROCHEMISTRY EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG JUYE TENGDA ELECTROCHEMISTRY EQUIPMENT CO Ltd filed Critical SHANDONG JUYE TENGDA ELECTROCHEMISTRY EQUIPMENT CO Ltd
Priority to CN2010202946142U priority Critical patent/CN201763033U/en
Application granted granted Critical
Publication of CN201763033U publication Critical patent/CN201763033U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a three-tube communications tower which comprises a lightning rod, ribbed slabs, an antenna bracket, a platform, preliminary shaft material, connecting bolts, flanges, main material, connecting plates, diagonal material and a ground bolt. The three-tube communications tower is characterized in that the integral three-tube communications tower is formed by a plurality of tower sections which are connected from the upper part to the lower part; the cross section of the tower section is in a regular triangle; the main material is arranged at the vertex of the regular triangle; the main material adopts constant diameter steel tubes; the flanges are arranged at two ends of the main material; the connecting plates are arranged in the middle of the main material; the connecting bolts are arranged between an upper section of the main material and a lower section of the main material; the ribbed slabs are arranged between the main material and each flange; the profile of the integral three-tube communications tower is in a regular triangular prism; the lightning rod is arranged at the vertex of the regular triangular; and the ground bolt is arranged on the flange at the lower end of the main material at the bottom end of the regular triangular.

Description

Three pipe communication towers
Technical field
The utility model belongs to the communication apparatus technical field, is used for the open-air three pipe communication towers that support signal receiving/transmission device in a kind of domain of communication equipment of more specifically saying so.
Background technology
At present, general what adopt is single-pipe tower, four jiaos of angle steel towers and multiple-tube column to the communications tower of prior art.The single-pipe tower rolled steel dosage is big, the waste steel, and complex manufacturing technology, the cost of manufacture height, and need professional hanging device to install, the construction and installation difficulty is big; Four jiaos of angle steel towers and multiple-tube column floor space are big, the technology part is many, processed complex, and general iron clad or the flange of adopting connects complex structure, long construction period between the tower section of four jiaos of angle steel towers, multiple-tube column.That the patent No. is that 200620102069.6 utility model patent has been announced is a kind of " communication with three pipe towers ", and this patent master material directly adopts isometrical pipe box to connect in succession, and without the flange connection, the junction is stressed unreasonable; The patent No. is that 200720030587.6 utility model patent has been announced a kind of " three pipe communications tower ", the integral basis tower forms positive three terrace with edges of equilateral isosceles, though satisfy the requirement of tower body stress condition, processing and fabricating and construction and installation complexity, integrated cost is still higher.
Summary of the invention
In order to address the above problem, it is a kind of simple in structure that the utility model provides, stressed reasonable, three pipe communication towers of processing and fabricating and construction install convenience, the technical solution of the utility model is: described three pipe communication towers are by lightning rod, gusset, antenna holder, platform, the fore shaft material, connecting bolt, flange, main material, connecting plate, oblique material, stone bolt is formed, it is characterized in that integral basis three pipe communication towers are formed by connecting by several tower sections from bottom to top, the cross section of tower section is equilateral triangle, main material is set on the summit of equilateral triangle, main material adopts isometrical steel pipe, the two ends of main material are provided with flange, the centre of main material is provided with connecting plate, between the flange of the main material of two tower sections connecting bolt is set up and down, between main material and the flange gusset is set, in shape, integral basis three pipe communication towers are regular triangular prism shaped, the top of regular triangular prism is provided with lightning rod, on the following end flanges of bottom master's material of regular triangular prism stone bolt is set.
Platform described in the utility model is characterized in that platform is arranged on the top of integral basis three pipe communication towers, is provided with antenna holder around the platform.
Fore shaft material described in the utility model is characterized in that the fore shaft material is arranged on three vertical planes of three pipe communication towers, is provided with together to going up every 3 meters down.
Oblique material described in the utility model is characterized in that on the vertical plane of three pipe communication towers a pair of oblique material arranged in a crossed manner between every adjacent twice fore shaft material.
The beneficial effects of the utility model are that three pipe communication towers are simple in structure, stressed rationally, processing and fabricating and construction install convenience.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the A-A directional profile schematic diagram of Fig. 1;
Fig. 3 is a flange arrangement schematic diagram described in the utility model.In the accompanying drawing:
1. lightning rod, 2. gusset, 3. antenna holder, 4. platform, 5. fore shaft material, 6. connecting bolt, 7. flange, 8. main material, 9. connecting plate, 10. oblique material, 11. stone bolt.
The specific embodiment
In conjunction with the accompanying drawings the utility model is described in further detail, so that the public grasps implementation method of the present utility model better, the utility model specific embodiment is: described three pipe communication towers are by lightning rod 1, gusset 2, antenna holder 3, platform 4, fore shaft material 5, connecting bolt 6, flange 7, main material 8, connecting plate 9, oblique material 10, stone bolt 11 is formed, it is characterized in that integral basis three pipe communication towers are formed by connecting by several tower sections from bottom to top, the cross section of tower section is equilateral triangle, main material 8 is set on the summit of equilateral triangle, main material 8 adopts isometrical steel pipe, the two ends of main material 8 are provided with flange 7, the centre of main material 8 is provided with connecting plate 9, between the flange 7 of the main material 8 of two tower sections connecting bolt 6 is set up and down, between main material 8 and the flange 7 gusset 2 is set, in shape, integral basis three pipe communication towers are regular triangular prism shaped, the top of regular triangular prism is provided with lightning rod 1, on the following end flanges 7 of bottom master's material 8 of regular triangular prism stone bolt 11 is set.
Platform 4 described in the utility model is characterized in that platform 4 is arranged on the top of integral basis three pipe communication towers, is provided with antenna holder 3 around the platform 4.
Fore shaft material 5 described in the utility model is characterized in that fore shaft material 5 is arranged on three vertical planes of three pipe communication towers, is provided with together to going up every 3 meters down.
Oblique material 10 described in the utility model is characterized in that on the vertical plane of three pipe communication towers a pair of oblique material 10 arranged in a crossed manner between every adjacent twice fore shaft material 5.
The beneficial effects of the utility model are simple in structure, the reasonable stress of three pipe communication towers, processing and fabricating and construction install convenience.

Claims (2)

1. three manage communication towers, by lightning rod (1), gusset (2), antenna holder (3), platform (4), fore shaft material (5), connecting bolt (6), flange (7), main material (8), connecting plate (9), oblique material (10), stone bolt (11) is formed, it is characterized in that integral basis three pipe communication towers are formed by connecting by several tower sections from bottom to top, the cross section of tower section is equilateral triangle, main material (8) is set on the summit of equilateral triangle, main material (8) adopts isometrical steel pipe, the two ends of main material (8) are provided with flange (7), the centre of main material (8) is provided with connecting plate (9), between the flange (7) of the main materials of two tower sections (8) connecting bolt (6) is set up and down, between main material (8) and the flange (7) gusset (2) is set, integral basis three pipe communication towers are regular triangular prism shaped in shape, the top of regular triangular prism is provided with lightning rod (1), on the following end flanges (7) of bottom master's material (8) of regular triangular prism stone bolt (11) is set.
2. three pipe communication towers according to claim 1 is characterized in that described fore shaft material (5) is arranged on three vertical planes of three pipe communication towers, are provided with together to going up every 3 meters down.
CN2010202946142U 2010-08-16 2010-08-16 Three-tube communication tower Expired - Fee Related CN201763033U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202946142U CN201763033U (en) 2010-08-16 2010-08-16 Three-tube communication tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202946142U CN201763033U (en) 2010-08-16 2010-08-16 Three-tube communication tower

Publications (1)

Publication Number Publication Date
CN201763033U true CN201763033U (en) 2011-03-16

Family

ID=43715642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202946142U Expired - Fee Related CN201763033U (en) 2010-08-16 2010-08-16 Three-tube communication tower

Country Status (1)

Country Link
CN (1) CN201763033U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114757B (en) * 2013-03-14 2015-08-19 安徽省城建设计研究院 A kind of three pipe communication towers
CN105201263A (en) * 2015-08-18 2015-12-30 华信咨询设计研究院有限公司 Flange transfer communication tower
CN114482676A (en) * 2022-01-26 2022-05-13 浙江八方电信有限公司 Communication tower with wind driven generator

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114757B (en) * 2013-03-14 2015-08-19 安徽省城建设计研究院 A kind of three pipe communication towers
CN105201263A (en) * 2015-08-18 2015-12-30 华信咨询设计研究院有限公司 Flange transfer communication tower
CN105201263B (en) * 2015-08-18 2017-05-10 华信咨询设计研究院有限公司 Flange transfer communication tower
CN114482676A (en) * 2022-01-26 2022-05-13 浙江八方电信有限公司 Communication tower with wind driven generator

Similar Documents

Publication Publication Date Title
CN201763033U (en) Three-tube communication tower
CN205242885U (en) Lightweight concrete prefabricated staircase connection structure
CN215107376U (en) Inclined wall formwork support system
CN201605868U (en) Communication tower
CN202451040U (en) Perpendicular high-altitude crawling ladder
CN201649770U (en) Triangle-tube communication tower
CN207063479U (en) A kind of suspension scaffold cable-stayed system
CN201763032U (en) Six-tube communication tower
CN202416854U (en) Table form concrete formwork device
CN202767391U (en) Rain water pipe fixing piece
CN201738569U (en) Placing die for coal tower hopper wall
CN204418201U (en) Base station modularization prefabricated foundation
CN205242891U (en) Prefabricated hollow staircase
CN203213560U (en) Scaffold with disc fastener jacking component
CN201865229U (en) Suspended ceiling reverse support
CN205811032U (en) A kind of roofing miniaturization ready-package communication antenna support bar
CN203795859U (en) Large formwork supporting structure for bare concrete shear wall
CN103485524A (en) Bracket type overhanging scaffold and construction method thereof at erection time
CN113062348A (en) Concrete foundation structure of tower crane
CN208347421U (en) A kind of installing type communication tower
CN208310404U (en) Modular suspension moso bamboo ecology enclosure wall
CN202000726U (en) Novel heightening frame
CN111335357A (en) Pipe gallery formwork supporting system and construction method thereof
CN202644845U (en) Open-web steel column of single-storey industrial building
CN201165766Y (en) Three pipes communication tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110316

Termination date: 20110816