CN201751431U - Monitoring system of aluminium electrolysis cell crust breaker - Google Patents

Monitoring system of aluminium electrolysis cell crust breaker Download PDF

Info

Publication number
CN201751431U
CN201751431U CN2010202113410U CN201020211341U CN201751431U CN 201751431 U CN201751431 U CN 201751431U CN 2010202113410 U CN2010202113410 U CN 2010202113410U CN 201020211341 U CN201020211341 U CN 201020211341U CN 201751431 U CN201751431 U CN 201751431U
Authority
CN
China
Prior art keywords
unit
signal
supervisory system
crust breaker
monitoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202113410U
Other languages
Chinese (zh)
Inventor
宋乃春
罗锐
刘炎森
李章存
杨攀锋
漆志军
李大苟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN DENGFENG ALUMINUM INDUSTRY Co Ltd
Original Assignee
HENAN DENGFENG ALUMINUM INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN DENGFENG ALUMINUM INDUSTRY Co Ltd filed Critical HENAN DENGFENG ALUMINUM INDUSTRY Co Ltd
Priority to CN2010202113410U priority Critical patent/CN201751431U/en
Application granted granted Critical
Publication of CN201751431U publication Critical patent/CN201751431U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

The utility model discloses a monitoring system of an aluminium electrolysis cell crust breaker. The monitoring system is characterized by comprising a signal acquisition unit installed on a crust breaking cylinder, and a signal analysis unit and an alarming unit connected through leads, wherein the signal analysis unit receives the signals transmitted by the signal acquisition unit for analytical judgment and then transmits the signals to the alarming unit arranged in the monitoring occasion. The monitoring system can monitor the working condition of the electrolytic electrolysis cell crust breaking cylinder in time, when a hammer is clamped, or the threaded connection part of the hammer and the cylinder is loosened or falls off, or the hammer is adhered with too much electrolyte, the signals are transmitted to the signal analysis instrument through the signal acquisition device, then the signal analysis instrument make a judgment on the signals, and then an indicator light on site is used for alarming so as to inform the operating personnel of making corresponding treatment. For the monitoring system, not only can the emergent effects caused by hammer clamping be avoided in time and the power consumption is reduced, but also can the crust breaking cylinder is better protected, the using period of the hammer is prolonged and the virgin aluminum quality is ensured.

Description

Aluminium cell crust breaker supervisory system
Technical field
The utility model belongs to the Aluminium Electrolysis field, relates to a kind of novel aluminum cell crust breaker supervisory system specifically.
Background technology
Along with the development of China's electrolysis of aluminum industry, the various controls of electrolyzer are more and more become more meticulous, level of automation is also more and more higher.Multiple spot crust breaking blanking in the middle of the modernization large scale electrolytic cell generally adopts, the crust-breaking chips life cycle is short, changes the frequency height; Cause the burst effect of electrolyzer simultaneously easily because of the folder tup, cause power consumption to increase; Because tup and cylinder generally all adopt and are threaded, after using some cycles, can occur becoming flexible or coming off, if will certainly cause tup to be melted in the electrolyzer, cause the primary aluminum downgrade in case come off; Tup in use often contacts with ionogen, will certainly be stained with some ionogen on tup, if ionogen is too much sticking, can cause the cylinder operation load excessive, also enters into the inner difficulty that increases of electrolyzer to blanking simultaneously.So the crust breaker to electrolyzer is monitored in real time, prolong the work-ing life of crust breaking cylinder, prolong the replacement cycle of tup, reduce the generation of burst effect, improve the primary aluminum quality, it is necessary seeking a kind of not only simple but also economic supervisory system.
Summary of the invention
The problem that the utility model exists at above-mentioned existing large pre-baked cell crust breaker just; and a kind of science that provides, reasonable, energy-conservation, efficient, simple to operate, few, the safe and reliable monitoring device-a kind of novel aluminum cell crust breaker supervisory system of investment; this supervisory system can not only avoid in time because folder tup and the burst effect that causes; reduce power consumption; simultaneously can also the better protection crust breaking cylinder; prolong the life cycle of tup, guarantee the primary aluminum quality.
The purpose of this utility model is achieved through the following technical solutions: crust breaker supervisory system of the present utility model comprises the signal gathering unit that is installed on the crust breaking cylinder, by signal analysis unit and alarm unit that lead connects, and the signal that signal analysis unit transmits by the received signal collecting unit carries out sending alarm unit to after the analysis and judgement.
In the utility model, described signal gathering unit is the travel switch that is arranged on cylinder bottom, and travel switch is installed in cylinder bottom by retaining plate, and carries out spacing monitoring by the travel switch postive stop baffle.
Described signal analysis unit is a timing relay, and timing relay comprises timing relay normally opened contact SJ1 and timing relay coil SJ2.
Described alarm unit is pilot lamp or combined aural and visual alarm, and this pilot lamp or combined aural and visual alarm can be installed in the electrolyzer top, also can be installed in the slot control machine top.
Principle of work of the present utility model is: by install crust breaking system signal gathering device additional on electrolyzer, monitor the working condition of electrolyzer crust breaking cylinder in time, when folder tup or tup appears and become flexible the cylinder threaded connection place, when coming off, or when the sticking ionogen of tup is too much, by signal pickup assembly signal is sent on the signal analysis instrument, the signal analysis instrument is made judgement to signal, report to the police by the pilot lamp at scene again, notify the operating personnel to handle accordingly.
Advantage of the present utility model is:
1. when folder tup or tup occurring and become flexible the cylinder threaded connection place, when coming off, or glue ionogen when too much at tup, can in time report to the police, obtain respective handling;
2, time of fire alarming can suitably be regulated according to practical situation;
3, prolong the work-ing life of crust breaking cylinder;
4, prolong the replacement cycle of tup;
5, reduce the generation of burst effect;
6, improve the primary aluminum quality;
7, investment is little, easy to maintenance, simple to operate, safe and reliable.
Description of drawings
Fig. 1 is a functional block diagram of the present utility model.
Fig. 2 is a circuit connection diagram of the present utility model.
Among Fig. 2: I, II, III, IV are XLM-19 type travel switch, are installed in four crust breaking cylinder places of electrolyzer respectively, and SJ1 is the timing relay normally opened contact, and SJ2 is the timing relay coil, and ZA is a pilot lamp
Fig. 3 is the scheme of installation of travel switch in the utility model.
Among Fig. 3: 1 is the crust breaking cylinder piston rod, and 2 is crust breaking cylinder bottom bolt, and 3 is the travel switch mounting plate, and 4 is travel switch, and 5 is the travel switch postive stop baffle, and 6 is the threaded connection place, and 7 is the crust breaking hammer stem, and 8 is cylinder.
Embodiment
The utility model is described further below in conjunction with accompanying drawing and work on the spot:
As Figure 1-3: installing signal pickup assembly at four crust breaking cylinder 8 places of electrolyzer is stroke switch 4, be wired on the signal analysis device of slot control machine below, the output line road is connected on the alarm lamp ZA, pilot lamp ZA can be installed in the electrolyzer top, also can be installed in the slot control machine top, the observed position of handled easily personnel gets final product, the power supply that this covering device adopts is 220V/380V, general setting signal analysis and judgement opening time is 30s, and complete assembly comprises: signal gathering unit, signal analysis unit and alarm unit.After the crust breaker supervisory system installed, the logical power supply of going up can be realized electrolyzer crust breaker real time and on line monitoring.Travel switch 4 is installed in cylinder bottom by retaining plate 3, and carries out spacing monitoring by travel switch postive stop baffle 5.Travel switch 4 close along with crust breaking hammer stem 7 action downwards and, the timing relay energising, when surpassing setting-up time, hammer stem is not also got back to the position, time relay time-delay is closed and is moved, pilot lamp ZA reports to the police.

Claims (7)

1. aluminium cell crust breaker supervisory system, it is characterized in that: it comprises the signal gathering unit that is installed on the crust breaking cylinder, by signal analysis unit and alarm unit that lead connects, and the signal that signal analysis unit transmits by the received signal collecting unit carries out sending alarm unit to after the analysis and judgement.
2. aluminium cell crust breaker supervisory system according to claim 1 is characterized in that: signal gathering unit is for being arranged on the travel switch (4) bottom the cylinder (8).
3. aluminium cell crust breaker supervisory system according to claim 1 is characterized in that: signal analysis unit is a timing relay.
4. aluminium cell crust breaker supervisory system according to claim 1 is characterized in that: alarm unit is pilot lamp or combined aural and visual alarm.
5. aluminium cell crust breaker supervisory system according to claim 2 is characterized in that: travel switch (4) is installed in cylinder bottom by retaining plate (4), and carries out spacing monitoring by travel switch postive stop baffle (5).
6. aluminium cell crust breaker supervisory system according to claim 3 is characterized in that: timing relay comprises timing relay normally opened contact SJ1 and timing relay coil SJ2.
7. aluminium cell crust breaker supervisory system according to claim 4 is characterized in that: pilot lamp or combined aural and visual alarm are installed in the electrolyzer top, perhaps are installed in the slot control machine top.
CN2010202113410U 2010-06-02 2010-06-02 Monitoring system of aluminium electrolysis cell crust breaker Expired - Fee Related CN201751431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202113410U CN201751431U (en) 2010-06-02 2010-06-02 Monitoring system of aluminium electrolysis cell crust breaker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202113410U CN201751431U (en) 2010-06-02 2010-06-02 Monitoring system of aluminium electrolysis cell crust breaker

Publications (1)

Publication Number Publication Date
CN201751431U true CN201751431U (en) 2011-02-23

Family

ID=43601837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202113410U Expired - Fee Related CN201751431U (en) 2010-06-02 2010-06-02 Monitoring system of aluminium electrolysis cell crust breaker

Country Status (1)

Country Link
CN (1) CN201751431U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104178779A (en) * 2014-08-22 2014-12-03 中南大学 Method and system for diagnosing working state of aluminum cell unloader
CN104264188A (en) * 2014-09-25 2015-01-07 中国铝业股份有限公司 Control type intelligent crust breaking system and control type intelligent crust breaking method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104178779A (en) * 2014-08-22 2014-12-03 中南大学 Method and system for diagnosing working state of aluminum cell unloader
CN104178779B (en) * 2014-08-22 2016-09-07 中南大学 The diagnostic method of a kind of aluminum cell supplying device duty and system
CN104264188A (en) * 2014-09-25 2015-01-07 中国铝业股份有限公司 Control type intelligent crust breaking system and control type intelligent crust breaking method

Similar Documents

Publication Publication Date Title
CN202492591U (en) Control system for intelligent crust breaking of aluminum cell
CN201638376U (en) Energy consumption monitoring system based on Internet of things
CN102541019B (en) Automatic drainage device and control method thereof
CN102592878A (en) Intelligent device and method for monitoring switch-on spring performance of vacuum circuit breaker
CN102409362B (en) Aluminium cell is through-flow body do not have a power failure welding control system
CN206684949U (en) The traffic lights that a kind of running status independently additionally monitors
CN201751431U (en) Monitoring system of aluminium electrolysis cell crust breaker
CN201716398U (en) On-line monitoring device of vacuum circuit breaker
CN202898565U (en) Intelligent control device of aluminum cell pneumatic system
CN103272794A (en) Traffic signal lamp intelligent washing device and washing methods thereof
CN1995465B (en) Prebaked aluminum electrolytic tank crust breaking cylinder
CN201993374U (en) Intelligent on-line speed monitoring device for vacuum circuit breaker
CN201522959U (en) Intelligent high pressure vacuum circuit breaker
CN104597852A (en) Wireless automatic water supply system
CN216774834U (en) Automatic on-line monitoring device for recognizing switch state
CN201503463U (en) Centralized-type fault alarm unit of LED signal controller
CN205855870U (en) A kind of tower crane sensor safe operating monitoring system
CN201512589U (en) Large-scale electrolytic cell shell breaking monitoring device
CN112769143B (en) Intelligent safety management and control method based on ubiquitous power distribution Internet of things
CN209652449U (en) A kind of aluminium cell intelligence crust breaking auxiliary system
CN207828426U (en) Intelligent crust breaking system
CN212128319U (en) Intelligent crust breaking control system applied to aluminum electrolysis production process
CN204570059U (en) A kind of electrolyzer energy saving pneumatic system control device
CN201716577U (en) Cable tunnel integrated control system
CN205249562U (en) Take change over switch's urban illumination intelligent control host computer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110223

Termination date: 20110602