CN201739762U CN2010205078283U CN201020507828U CN201739762U CN 201739762 U CN201739762 U CN 201739762U CN 2010205078283 U CN2010205078283 U CN 2010205078283U CN 201020507828 U CN201020507828 U CN 201020507828U CN 201739762 U CN201739762 U CN 201739762U
Authority
CN
China
Prior art keywords
gas
gas filling
tube
electric power
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205078283U
Other languages
Chinese (zh)
Inventor
王建
刘鹏杰
任红光
杨新宇
牛帅奇
王伟
魏伟伟
胡晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GONGYI CITY POWER SUPPLY CO Ltd
Original Assignee
GONGYI CITY POWER SUPPLY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GONGYI CITY POWER SUPPLY CO Ltd filed Critical GONGYI CITY POWER SUPPLY CO Ltd
Priority to CN2010205078283U priority Critical patent/CN201739762U/en
Application granted granted Critical
Publication of CN201739762U publication Critical patent/CN201739762U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a gas filling device for electric power sulfur hexafluoride equipment, which comprises an SF6 filling cylinder, a gas cylinder pressure gauge, an output pressure gauge, an output valve, a gas filling tube communicated with the SF6 filling cylinder and a one-way gas nozzle positioned at the tail end of the gas filling tube. The gas filling tube is provided with a three-way tube. A breeches pipe of the three-way tube is provided with a control valve. The tail end of the breeches pipe of the three-way tube is communicated with an SF6 temporary storage cylinder. In the utility model, the gas filling tube is additionally provided with the three-way tube and the breeches pipe of the three-way tube is provided with the control valve, air in the gas filling tube is controlled to be firstly filled into the temporary storage cylinder so as to effectively avoid adding the air in the gas filling tube into the electric power SF6 equipment. The gas filling device for the electric power sulfur hexafluoride equipment can avoid SF6 being discharged into the atmosphere to pollute the environment, is favorable for recycling the SF6, has the advantages of small volume, low cost, simple, convenient and easy operation, convenient use and good effect and is very favorable for popularization and implementation.

Description

Electric power sulphur hexafluoride filling apparatus device of air
Technical field
The utility model relates to a kind of sulphur hexafluoride filling apparatus device of air, particularly relates to a kind of electric power sulphur hexafluoride filling apparatus device of air.
Background technique
SF 6Gas successfully is applied to high-voltage switch gear and equipment thereof as the insulation and the arc-extinguishing medium of excellence.Today, high pressure, ultrahigh pressure and extra-high voltage field, SF 6Gas almost becomes unique insulation and the arc-extinguishing medium of circuit breaker and GIS.At middle pressure field, SF 6Gas has become the two big pillars of running neck and neck with vacuum switch.SF 6Gas also constantly enlarges in the use in power transmission and transformation field, has obtained and use widely.
Pure new SF 6Gas is colourless, tasteless, odorless, do not fire, and stable chemical performance belongs to inert gas at normal temperatures.But in electric power system, because SF 6Gas mainly serves as insulation and arc-extinguishing medium, in circuit breaker or GIS breaking operation process, puts a little and under the factor affecting such as partial discharge, high temperature SF at scratch start effect, corona, spark 6Gas can decompose, and its analyte runs into programming corrosivity electrolyte, especially some high toxicity analyte behind the water, as SF 4, S 2F 2, S 2F 10, SOF 2, HF and SO 2, their Diazolidinyl Ureas, eyes, mucous membrane if intake is big, also can cause dizziness and pulmonary edema, even the causing death.
SF 6Gas still is one of six big greenhouse gases, electric power SF 6Equipment is when inflation, in order to discharge the air in the gas ducting, unavoidably with SF 6Gaseous emission in air, befouling environment.Referring to Fig. 1, because charging air inlet is a check valve, so when inflation, valve connects the switch inflation inlet, endotracheal air can not arranged, and can pour SF to air 6In the equipment air chamber.While electric power SF 6Equipment, when inflation, stuff discharge in the gas ducting and row are unclean, in the tonifying Qi process, exist air row unclean, can cause air to pour SF 6In the Switch main body, SF 6The degree of purity deficiency, arc quenching effect reduces, SF 6Little water exceeds standard, and will corrode the contact of switch, increases the D.C. resistance of switch, causes great influence for the normal operation of equipment.
Summary of the invention
The purpose of this utility model is to overcome deficiency and the defective that prior art exists, and provides a kind of air that prevents to add electric power SF 6The electric power sulphur hexafluoride filling apparatus device of air of equipment.
The technical solution of the utility model is a kind of electric power sulphur hexafluoride filling apparatus device of air, comprises SF 6The inflation gas cylinder, cylinder pressure gauge, delivery gauge and delivery valve, gas tube that is communicated with gas cylinder and the unidirectional valve that is positioned at the gas tube end are equipped with three-way pipe on gas tube, on the three-way pipe breeches pipe control valve is installed, the end of this three-way pipe breeches pipe and SF 6Temporary gas cylinder is communicated with.
Described three-way pipe is positioned at the gas tube end.
The utlity model has following beneficial effect, increasing three-way pipe on the gas tube and on the threeway breeches pipe, control valve is being installed, the inflation inner air tube is at first fed in the temporary gas cylinder, can effectively avoid the inflation inner air tube is added electric power SF by control 6In the equipment.Can avoid SF 6Gas enters the pollution of atmosphere environment.Help SF 6The recycling of gas.It is little to the utlity model has volume, and cost is low, easy to operation, and effective advantage easy to use is beneficial to promotion and implementation very much.
Description of drawings
Figure l is existing sulphur hexafluoride filling apparatus device of air structural representation;
Fig. 2 is the utility model sulphur hexafluoride filling apparatus device of air structural representation.
Embodiment
Embodiment one: referring to Fig. 2, and a kind of electric power sulphur hexafluoride filling apparatus device of air, SF 6Be separately installed with cylinder pressure gauge 4 on the inflation gas cylinder 1, delivery gauge 5 and delivery valve (be prior art, do not draw), label 3 is the gas cylinder charging air inlet.SF 6 Inflation gas cylinder 1 one sides are communicated with gas tube 2, and the end of this gas tube 2 is equipped with unidirectional valve 3.Simultaneously, on gas tube 2, be provided with breeches pipe or three-way pipe is installed, control valve 8 is installed, the end of this three-way pipe breeches pipe 7 and SF on the three-way pipe breeches pipe 7 near unidirectional valve position 6Temporary gas cylinder (not shown) is communicated with.
Above-mentioned unidirectional valve 3 and SF 6The switch inflation inlet of equipment cooperates, and opens delivery valve (or output gas meter valve), SF 6Gas enters gas tube through gas meter, and because of charging air inlet is a check valve, during control valve 8, the inflation inner air tube only enters sky SF on opening breeches pipe 6The gas cylinder harvesting, closed control valve 8 then, open SF 6Valve on the equipment is to SF 6Equipment is inflated, and has so just prevented that malaria from entering SF 6Equipment air chamber and SF 6Gas enters the pollution of air-air.The air and the SF of harvesting 6Mixed gas can be by SF 6Gas generation producer reclaims, and re-uses after treatment.

Claims (2)

1. an electric power sulphur hexafluoride filling apparatus device of air comprises SF 6The inflation gas cylinder, cylinder pressure gauge, delivery gauge and delivery valve, gas tube that is communicated with gas cylinder and the unidirectional valve that is positioned at the gas tube end, it is characterized in that: three-way pipe is installed on gas tube, on the three-way pipe breeches pipe control valve is installed, the end of this three-way pipe breeches pipe and SF 6Temporary gas cylinder is communicated with.
2. electric power sulphur hexafluoride filling apparatus device of air according to claim 1, it is characterized in that: described three-way pipe is positioned at the gas tube end.
CN2010205078283U 2010-08-28 2010-08-28 Gas filling device for electric power sulfur hexafluoride equipment Expired - Fee Related CN201739762U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205078283U CN201739762U (en) 2010-08-28 2010-08-28 Gas filling device for electric power sulfur hexafluoride equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205078283U CN201739762U (en) 2010-08-28 2010-08-28 Gas filling device for electric power sulfur hexafluoride equipment

Publications (1)

Publication Number Publication Date
CN201739762U true CN201739762U (en) 2011-02-09

Family

ID=43555037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205078283U Expired - Fee Related CN201739762U (en) 2010-08-28 2010-08-28 Gas filling device for electric power sulfur hexafluoride equipment

Country Status (1)

Country Link
CN (1) CN201739762U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104009404A (en) * 2014-05-30 2014-08-27 国家电网公司 Rapid air charging device for SF6 device
CN104214884A (en) * 2014-09-26 2014-12-17 国网河南省电力公司南阳供电公司 Sulfur hexafluoride waste gas exhausting and collecting system for transformer substation
CN104565810A (en) * 2015-01-30 2015-04-29 国网宁夏电力公司中卫供电公司 General type SF6-gas filling device
CN111344920A (en) * 2017-11-17 2020-06-26 西门子股份公司 Method for filling containers and service device for carrying out the method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104009404A (en) * 2014-05-30 2014-08-27 国家电网公司 Rapid air charging device for SF6 device
CN104214884A (en) * 2014-09-26 2014-12-17 国网河南省电力公司南阳供电公司 Sulfur hexafluoride waste gas exhausting and collecting system for transformer substation
CN104214884B (en) * 2014-09-26 2017-02-15 国网河南省电力公司南阳供电公司 Sulfur hexafluoride waste gas exhausting and collecting system for transformer substation
CN104565810A (en) * 2015-01-30 2015-04-29 国网宁夏电力公司中卫供电公司 General type SF6-gas filling device
CN111344920A (en) * 2017-11-17 2020-06-26 西门子股份公司 Method for filling containers and service device for carrying out the method
CN111344920B (en) * 2017-11-17 2022-02-25 西门子能源全球有限公司 Method for filling containers and service device for carrying out the method

Similar Documents

Publication Publication Date Title
CN201739762U (en) Gas filling device for electric power sulfur hexafluoride equipment
CN101877287A (en) Site-measurement tail gas recovering device of sulfur hexafluoride equipment
CN108273366A (en) Sulfur hexafluoride degradation treatment device based on dielectric barrier discharge and processing method
CN106287229B (en) A kind of insulative gas mix body inflation system and inflation method
CN103495443A (en) Centralized control recycling device and method for waste gas in laboratory
CN2911941Y (en) SF6 gas reclaiming apparatus for GIS combined electrical appliances
CN102520121B (en) Environment-friendly type real-time detection apparatus for analysis of components in sulfur hexafluoride gas and method used therein
CN211328847U (en) Sulfur hexafluoride detector tail gas processing apparatus
CN204302440U (en) Can to multiple stage SF 6insulation of electrical installation state and moisture carry out the device of on-line monitoring
CN204758353U (en) Portable gas sampling device
CN203707003U (en) Gas supplementing device used in operation process of gas insulated switchgear (GIS)
CN102495175A (en) Zero discharge device and working method for detecting sulfur hexafluoride gas
CN209291962U (en) A kind of recycling of sulfur hexafluoride and low temperature fluid injection bulking system
CN204752206U (en) Gaseous online purifier of electric power SF6 circuit breaker SF6
CN207012771U (en) Sulfur hexafluoride and nitrogen mixed gas recovery separating-purifying device
CN201107223Y (en) SF6 gas sampler
CN203273118U (en) Multi-purpose connector of sulfur hexafluoride gas recovery device
CN203297933U (en) On-line automatic sulfur hexafluoride inflation device
CN208943805U (en) Sulfur hexafluoride degradation treatment device based on dielectric barrier discharge
CN203556382U (en) Centralized control recovery device for waste gas of laboratory
CN204424388U (en) Apparatus for baking before a kind of lithium ion battery liquid injection
CN202502092U (en) Testing device for detecting corrosive sulfur in transformer oil
CN206639653U (en) A kind of changeable type composite suspension type insulators arc-blowing device
CN216062636U (en) Zero release, prevent deformation, quick looped netowrk cabinet arc extinguishing gas recovery unit
CN107289323B (en) The operating method of simple portable sulfur hexafluoride gas recyclable device and the device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110209