CN201739651U - Convenient mounted fabricated pipe gallery - Google Patents

Convenient mounted fabricated pipe gallery Download PDF

Info

Publication number
CN201739651U
CN201739651U CN2010205026664U CN201020502666U CN201739651U CN 201739651 U CN201739651 U CN 201739651U CN 2010205026664 U CN2010205026664 U CN 2010205026664U CN 201020502666 U CN201020502666 U CN 201020502666U CN 201739651 U CN201739651 U CN 201739651U
Authority
CN
China
Prior art keywords
steel
pipe gallery
piping lane
concrete pipe
skeleton
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205026664U
Other languages
Chinese (zh)
Inventor
赵斌
张亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Waterline Pipeline Engineering Co Ltd
Original Assignee
Tianjin Waterline Pipeline Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Waterline Pipeline Engineering Co Ltd filed Critical Tianjin Waterline Pipeline Engineering Co Ltd
Priority to CN2010205026664U priority Critical patent/CN201739651U/en
Application granted granted Critical
Publication of CN201739651U publication Critical patent/CN201739651U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a convenient mounted fabricated pipe gallery, which comprises a socket, an interface, a concrete pipe gallery core and a steel skeleton, wherein the socket and the interface are respectively axially and fixedly mounted at two ends of the concrete pipe gallery core, the steel skeleton is axially embedded into the concrete pipe gallery core, two ends of the steel skeleton are respectively axially and fixedly mounted on the socket and the interface, a pre-embedding steel ring is fixedly mounted on the inner wall of the steel skeleton, and the inner wall of the pre-embedding steel ring is parallel to the inner wall of the concrete pipe gallery core. The utility model has simple structure, scientific and reasonable design, convenient processing and manufacturing, and reduced construction time, and is a convenient mounted fabricated pipe gallery which can effectively improve the construction efficiency.

Description

The prefabricated piping lane of civilian dress type
Technical field
The utility model belongs to the piping lane field, especially the prefabricated piping lane of civilian dress type.
Background technique
Prefabricated piping lane now progressively substitutes the cast-in-place concrete piping lane because it has advantages such as the site operation amount is few, the construction period is short, engineering cost is low, more and more is applied in the engineering.No matter prefabricated piping lane is to be used for electric power, professional piping lane such as communication, or municipal pipe gallery, its inside all needs to arrange pipeline, general orderly being placed on the pipeline support of these pipelines, and passive pipeline support need be fixed on the prefabricated piping lane inwall, present passive pipeline support all is to finish fixing by the embedded iron on the prefabricated piping lane inwall, these embedded irons will be in the cast of prefabricated piping lane inwall predetermined fixed in prefabricated piping lane inwall, and this embedded iron becomes dotted straight lines to be distributed in the prefabricated piping lane inwall, so just make prefabricated piping lane need to adjust the mounting point when mounted, so that embedded iron meets the requirement of pipeline support mounting point, when adjusting the embedded iron position, increased the construction and installation time of prefabricated piping lane, reduced the efficiency of construction of prefabricated piping lane, and the embedded iron that distributes for dotted straight lines, its fixed position and flatness are difficult to guarantee, increased the production time of prefabricated piping lane in working process, reduced the manufacturing efficiency of prefabricated piping lane, and in today of rapid economic development, pipeline increase in the prefabricated piping lane trend that also is inevitable, this embedded iron setting for prefabricated piping lane inwall is had higher requirement.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, provide a kind of simple in structure, design science rationally, make things convenient for processing and fabricating, shortened the engineering time, can effectively improve the prefabricated piping lane of civilian dress type of efficiency of construction.
The utility model solves its technical problem and is achieved through the following technical solutions:
The prefabricated piping lane of a kind of civilian dress type, comprise bellmouth, socket, concrete pipe gallery core and steel skeleton, the coaxial respectively two ends that are packed in the concrete pipe gallery core of bellmouth and socket, the coaxial concrete pipe gallery in-core that is inlaid in of steel skeleton, the two ends of steel skeleton are coaxial respectively to be packed on bellmouth and the socket, it installs pre-buried steel loop on the steel inboard wall of skeleton, the inwall of this pre-buried steel loop flushes with concrete pipe gallery in-core wall.
And described steel skeleton is cylindrical steel cylinder.
And described steel skeleton is made of circumferential reinforcement and longitudinal steel bar.
And described pre-buried steel loop is packed on the steel inboard wall of skeleton by the uniform connecting tendon that installs of its outer wall.
And the quantity of described pre-buried steel loop is N, and on the uniform inwall that is packed in the steel skeleton, 1≤N≤50.
And described concrete pipe gallery outer core twines reinforcement wire, the coaxial cement mortar protective course that installs on the outer wall of reinforcement wire and concrete pipe gallery.
Advantage of the present utility model and beneficial effect are:
1, the prefabricated piping lane of this civilian dress type installs pre-buried steel loop at the steel inboard wall of skeleton, the inwall of this pre-buried steel loop flushes with concrete pipe gallery in-core wall, the quantity of pre-buried steel loop is N, and on the uniform inwall that is packed in the steel skeleton, 1≤N≤50, install various pipeline supports in the convenient prefabricated piping lane, and in prefabricated piping lane installation process, saved the time of adjusting the embedded part position, shortened the engineering time of prefabricated piping lane, improved the efficiency of construction of prefabricated piping lane, and this structure has also satisfied the demand that in the future increases various pipeline supports.
2, this steel skeleton is cylindrical steel cylinder or is made of circumferential reinforcement and longitudinal steel bar; the concrete pipe gallery outer core twines reinforcement wire; the coaxial cement mortar protective course that installs on the outer wall of reinforcement wire and concrete pipe gallery; this structure effectively improves whole prefabricated piping lane structural strength; after pre-buried steel loop is installed, more increased the ability of prefabricated piping lane opposing external pressure load.
3, the utility model is simple in structure, design science is reasonable, make things convenient for processing and fabricating, shortened the engineering time, is a kind of prefabricated piping lane of civilian dress type that can effectively improve efficiency of construction.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is that the A-A of Fig. 1 is to cutaway view Amplified image;
Fig. 3 is that the B-B of Fig. 1 is to cutaway view Amplified image.
Embodiment
The utility model is described in further detail below by specific embodiment, and following examples are descriptive, is not determinate, can not limit protection domain of the present utility model with this.
The prefabricated piping lane of a kind of civilian dress type; comprise bellmouth 9; socket 1; concrete pipe gallery core 4 and steel skeleton 3; bellmouth and socket are steel loop; the radially coaxial groove 2 that is shaped on of socket outer wall; when constructing at the scene; O-ring seal is installed in the groove; be used for two sealings between the prefabricated steel pipe; the steel skeleton can be the cylindrical steel tube; also can constitute by circumferential reinforcement and longitudinal steel bar; present embodiment steel skeleton shown in the drawings is cylindrical steel cylinder; the coaxial respectively two ends that are packed in the concrete pipe gallery core of bellmouth and socket; the coaxial concrete pipe gallery in-core that is inlaid in of steel skeleton; the two ends of steel skeleton are coaxial respectively to be packed on bellmouth and the socket; the concrete pipe gallery outer core twines reinforcement wire 5; the coaxial cement mortar protective course 8 that installs on the outer wall of reinforcement wire and concrete pipe gallery; it installs pre-buried steel loop 7 on the steel inboard wall of skeleton; the quantity of pre-buried steel loop is N; and on the uniform inwall that is packed in the steel skeleton; 1≤N≤50; present embodiment pre-buried steel number of rings shown in the drawings amount is 6; the inwall of this pre-buried steel loop flushes with concrete pipe gallery in-core wall; this pre-buried steel loop also can be packed on the steel inboard wall of skeleton by the uniform connecting tendon that installs 6 of its outer wall; present embodiment each pre-buried steel loop shown in the drawings all is packed on the steel inboard wall of skeleton by uniform 8 connecting tendons that install of outer wall separately; connecting tendon can be moment reinforcement, is U type moment reinforcement as present embodiment connecting tendon shown in the drawings.
The utility model need not to adjust the direction of pre-buried steel loop in installation process, save general prefabricated piping lane and adjusted the time of embedded iron position, improved the engineering time of prefabricated piping lane, and in the future as needing to increase pipeline, the utility model also can satisfy the construction requirement of the various pipeline supports of welding.

Claims (6)

1. prefabricated piping lane of civilian dress type, comprise bellmouth, socket, concrete pipe gallery core and steel skeleton, the coaxial respectively two ends that are packed in the concrete pipe gallery core of bellmouth and socket, the coaxial concrete pipe gallery in-core that is inlaid in of steel skeleton, the two ends of steel skeleton are coaxial respectively to be packed on bellmouth and the socket, it is characterized in that: install pre-buried steel loop on the steel inboard wall of skeleton, the inwall of this pre-buried steel loop flushes with concrete pipe gallery in-core wall.
2. the prefabricated piping lane of civilian dress type according to claim 1 is characterized in that: described steel skeleton is cylindrical steel cylinder.
3. the prefabricated piping lane of civilian dress type according to claim 1 is characterized in that: described steel skeleton is made of circumferential reinforcement and longitudinal steel bar.
4. the prefabricated piping lane of civilian dress type according to claim 1 is characterized in that: described pre-buried steel loop is packed on the steel inboard wall of skeleton by the uniform connecting tendon that installs of its outer wall.
5. according to claim 1 or the prefabricated piping lane of 2 or 3 or 4 described civilian dress types, it is characterized in that: the quantity of described pre-buried steel loop is N, and on the uniform inwall that is packed in the steel skeleton, 1≤N≤50.
6. the prefabricated piping lane of civilian dress type according to claim 1 is characterized in that: described concrete pipe gallery outer core twines reinforcement wire, the coaxial cement mortar protective course that installs on the outer wall of reinforcement wire and concrete pipe gallery.
CN2010205026664U 2010-08-24 2010-08-24 Convenient mounted fabricated pipe gallery Expired - Fee Related CN201739651U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205026664U CN201739651U (en) 2010-08-24 2010-08-24 Convenient mounted fabricated pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205026664U CN201739651U (en) 2010-08-24 2010-08-24 Convenient mounted fabricated pipe gallery

Publications (1)

Publication Number Publication Date
CN201739651U true CN201739651U (en) 2011-02-09

Family

ID=43554926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205026664U Expired - Fee Related CN201739651U (en) 2010-08-24 2010-08-24 Convenient mounted fabricated pipe gallery

Country Status (1)

Country Link
CN (1) CN201739651U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104197118A (en) * 2014-08-21 2014-12-10 山东球墨铸铁管有限公司 Nodular cast iron top tube
CN106848982A (en) * 2017-03-31 2017-06-13 中冶南方城市建设工程技术有限公司 Rack arrangement method when pipe gallery electric power cabin line linear lays straight line arranged in parallel
CN109487813A (en) * 2018-09-12 2019-03-19 中建三局集团有限公司 A kind of integrated prefabricated tube coupling and its construction method of pipe gallery street crossing push pipe
CN113969592A (en) * 2021-12-06 2022-01-25 重庆钢结构产业有限公司 Underground comprehensive pipe gallery connecting structure and underground comprehensive pipe gallery

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104197118A (en) * 2014-08-21 2014-12-10 山东球墨铸铁管有限公司 Nodular cast iron top tube
CN106848982A (en) * 2017-03-31 2017-06-13 中冶南方城市建设工程技术有限公司 Rack arrangement method when pipe gallery electric power cabin line linear lays straight line arranged in parallel
CN109487813A (en) * 2018-09-12 2019-03-19 中建三局集团有限公司 A kind of integrated prefabricated tube coupling and its construction method of pipe gallery street crossing push pipe
CN113969592A (en) * 2021-12-06 2022-01-25 重庆钢结构产业有限公司 Underground comprehensive pipe gallery connecting structure and underground comprehensive pipe gallery

Similar Documents

Publication Publication Date Title
CN201739651U (en) Convenient mounted fabricated pipe gallery
CN105019573A (en) Prefabricated external wall template structure system with heat insulation function, and construction method thereof
CN105369984A (en) Compound concrete-filled steel tubular member with stainless steel outer lining and making method thereof
CN204151819U (en) The concavo-convex connector of the multiplex foundation for tower crane of insert combined type
CN102561694B (en) Construction method for support mould with large-curvature spherical concrete structure
CN202467224U (en) Crotch type steel component installing anchor ear
CN201187638Y (en) Steel faucet prestress steel cylinder concrete pipe
CN201526741U (en) Prestressed steel cylinder pipe with inner and outer double protecting layers
CN202580338U (en) Prestressed concrete cylinder pipe for jacking construction method
CN103866865B (en) The pre-buried fixing means of a diameter of 48mm foundation bolt
CN205230603U (en) Lantern ring support
CN201074708Y (en) Glass fiber reinforced plastics outer canopy guard pipe
CN205244648U (en) Novel prestressing force steel cylinder concrete jack pipe
CN207761176U (en) A kind of grout sleeve component making PC components
CN101418883A (en) Concrete ceiling coil for steel ring with insertion opening
CN201187639Y (en) Steel faucet prestress steel cylinder reinforced concrete pipe
CN201351505Y (en) Anchor rod with centering rings
CN201133515Y (en) Branch pipe pre-pressure mounting device
CN201970393U (en) Forming die for drain pipe at rigid joint rabbet
CN201875296U (en) Prestressed reinforced concrete pipe with spigots with water blocking rings
CN201560487U (en) PVC liner of anti-corrosion steel bar concrete water discharging pipe
CN201180868Y (en) Plastic inner lining extruding type socket steel loop concrete push pipe
CN201093129Y (en) Projection type jack steel loop concrete top pipe
CN205371854U (en) Novel reinforced concrete pipeline under pressure
CN201028150Y (en) Steel faucet steel wire net slice steel cylinder longitudinal rib prestressed concrete pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110209

Termination date: 20160824