CN201730333U - Point positioning joint for embedding beam penetrating pipeline - Google Patents

Point positioning joint for embedding beam penetrating pipeline Download PDF

Info

Publication number
CN201730333U
CN201730333U CN2010201971683U CN201020197168U CN201730333U CN 201730333 U CN201730333 U CN 201730333U CN 2010201971683 U CN2010201971683 U CN 2010201971683U CN 201020197168 U CN201020197168 U CN 201020197168U CN 201730333 U CN201730333 U CN 201730333U
Authority
CN
China
Prior art keywords
spool
supporter
point location
joint
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201971683U
Other languages
Chinese (zh)
Inventor
朱成三
朱杨林
朱春林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010201971683U priority Critical patent/CN201730333U/en
Application granted granted Critical
Publication of CN201730333U publication Critical patent/CN201730333U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a point positioning joint for embedding a beam penetrating pipeline, which is characterized by comprising a supporting body capable of being inserted into a pipeline hole, wherein a through hole is axially formed on the supporting body. The utility model can position a pipeline without perforating a template so as to improve work efficiency, avoid mortar leakage and improve construction quality.

Description

A kind ofly be used for the pre-buried point location joint of wearing the beam spool
Technical field
The utility model belongs to the auxilliary material of PVC spool concealed wiring, is specifically related to a kind of pre-buried point location joint of wearing the beam spool that is used for.
Background technology
At present, in the construction of PVC wire pipe hidden lying in cast-in-situ floor, wearing the beam spool must perforate on template in advance, and wood chip is handled clean, and spool is inserted in the pattern hole, carries out concrete pouring again.There is big disadvantage in this method: 1) template boring: the construction trouble, and bigger to the template destructiveness, influence the template utilization rate, easy spillage influences quality during fluid concrete.2) long at the bottom of the outer head beam of tube head, hinder bed die and remove, and tube head damages easily during form removal.3) expose tube head need do cleaning (the tube head reparation that damages during with form removal, the tube head of breaking in the beam stabs out, reaches the requirement of connecting leg, and the overlength tube head is removed) can masonry panel.
The utility model content
The purpose of this utility model is to overcome above the deficiencies in the prior art, a kind of pre-buried point location joint of wearing the beam spool that is used for is provided, utilize this point location to save the pre-buried beam spool of wearing of also can fixing a point of need on template, not holing, to expose spool construction more convenient quick, reliable than wearing beam, guarantees construction quality thereby increase work efficiency.
The technical scheme that realizes the utility model purpose is: be used for the pre-buried point location joint of wearing the beam spool, comprise that one can insert the supporter in the spool straight joint interface, be axially arranged with through hole in the supporter upper edge.
Described supporter is a cylindrical body, and described through hole is located at the bottom of cylindrical body.
Another kind of technical scheme of the present utility model is: comprise that one can insert the supporter in the spool straight joint interface, be provided with sharp shaped material and stretch out from the end in supporter.
When laying spool, be fixed on the template with screw crossing point location joint bottom through-hole, perhaps directly will follow closely on template with the point location joint of sharp shaped material, the spool that will wear beam again is enclosed within on the point location joint with straight joint, when treating to remove bed die after the beam moulding, the point location joint together extracted get final product.Because the utility model can will be worn the beam spool fast and accurately under not to the situation of template perforate and be fixed on desired area, and provide reliable spool interface, this method, improved operating efficiency, saved the loaded down with trivial details pre-buried cleaning process of conventional method, improved the utilization rate of template, the spillage phenomenon that has caused because of the template perforate when having solved fluid concrete has improved construction quality.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2, Fig. 3 are respectively the different structure schematic diagrames of utility model.
Fig. 4 is a user mode schematic diagram of the present utility model.
The specific embodiment
Embodiment 1
See Fig. 1, be used for the pre-buried point location joint of wearing the beam spool, comprise that one can insert the supporter 1 in the spool straight joint interface, supporter 1 is a cylinder, is axially arranged with the through hole 2 that is used to wear screw in supporter 1 upper edge.
Embodiment 2
See Fig. 2, described supporter 1 is a cylindrical body, and described through hole 2 is located at the bottom of cylindrical body.
Embodiment 3
See Fig. 3, another kind of technical scheme of the present utility model is: point location joint comprises that one can insert the supporter 1 in the straight joint interface, is provided with sharp shaped material screw 3 and stretches out from the end in supporter 1.
User mode of the present utility model is seen Fig. 4, and point location is saved screw 3 predetermined fixed on template 4, spool straight joint 5 is enclosed within location on the supporter 1 of point location joint again.When treating that beam moulding rear pattern plate 4 is removed, point location joint 1 is extracted, during pipe arrangement spool 6 is inserted in the interface of straight joint 5.

Claims (3)

1. one kind is used for the pre-buried point location joint of wearing the beam spool, it is characterized in that comprising that one can insert the supporter in the spool straight joint interface, is axially arranged with through hole in the supporter upper edge.
2. according to claim 1ly be used for the pre-buried point location joint of wearing the beam spool, it is characterized in that described supporter is a cylindrical body, described through hole is located at the bottom of cylindrical body.
3. one kind is used for the pre-buried point location joint of wearing the beam spool, it is characterized in that comprising that one can insert the supporter in the spool straight joint interface, is provided with sharp shaped material and stretches out from the end in supporter.
CN2010201971683U 2010-05-20 2010-05-20 Point positioning joint for embedding beam penetrating pipeline Expired - Fee Related CN201730333U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201971683U CN201730333U (en) 2010-05-20 2010-05-20 Point positioning joint for embedding beam penetrating pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201971683U CN201730333U (en) 2010-05-20 2010-05-20 Point positioning joint for embedding beam penetrating pipeline

Publications (1)

Publication Number Publication Date
CN201730333U true CN201730333U (en) 2011-02-02

Family

ID=43521490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201971683U Expired - Fee Related CN201730333U (en) 2010-05-20 2010-05-20 Point positioning joint for embedding beam penetrating pipeline

Country Status (1)

Country Link
CN (1) CN201730333U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401182A (en) * 2016-09-20 2017-02-15 中建八局第四建设有限公司 Construction method during beam penetrating of spool
CN106437182A (en) * 2016-10-18 2017-02-22 中国建筑局(集团)有限公司 Fixing assembly for PVC (polyvinyl chloride) line pipe beam-free bottom die and construction method of fixing assembly
CN113123619A (en) * 2021-03-24 2021-07-16 中建科技(济南)有限公司 Aluminum alloy template convenient for positioning and installing wire pipe and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401182A (en) * 2016-09-20 2017-02-15 中建八局第四建设有限公司 Construction method during beam penetrating of spool
CN106437182A (en) * 2016-10-18 2017-02-22 中国建筑局(集团)有限公司 Fixing assembly for PVC (polyvinyl chloride) line pipe beam-free bottom die and construction method of fixing assembly
CN113123619A (en) * 2021-03-24 2021-07-16 中建科技(济南)有限公司 Aluminum alloy template convenient for positioning and installing wire pipe and construction method thereof

Similar Documents

Publication Publication Date Title
CN201730333U (en) Point positioning joint for embedding beam penetrating pipeline
CN204171150U (en) A kind of chain and chain-plate punch mechanism with automatic aligning
CN201679234U (en) Construction formwork counter pull bolt end plug
CN105104214A (en) Trapezoid manure leaking floor and manufacturing mold assembly thereof
CN202416869U (en) Novel building engineering basement exterior wall split bolt
CN201660898U (en) Pitching pile locating tool
CN203559586U (en) PVC (Polyvinyl chloride) electric wire pipe embedded direct connector for concrete
CN208099028U (en) A kind of steel pipe cutting mold
CN202248862U (en) Pipe holder for plugging gap
CN203403679U (en) Internal fixed joint of embedded spool beam-free bottom template
CN102756446A (en) Deflashing device
CN204126579U (en) A kind of core drill for boring core machine
CN202781469U (en) Supporting plate washing device for degumming machine
CN205408479U (en) A ditching device for planting chinese yam
CN205395223U (en) Large -scale double open type punching machine suitable for buoy plant use
CN204640464U (en) The automatic collecting device of a kind of plasterboard lath
CN204715752U (en) Side form block
CN201997702U (en) Drossing gourd ladle
CN205063329U (en) Leak protection device of fountain concrete placement mould
CN103081763B (en) Machine for inserting plastic film perpendicularly
CN204282385U (en) A kind of overlap joint position, curtain hole installation aiding device
CN203992595U (en) Tower machine pipe intersecting lines hydraulic cutter
CN202430623U (en) Simple road hardening template fixing device
CN202137834U (en) Forming mould for cement precast slab
CN216642675U (en) Accurate positioning and shaping die for pre-buried multi-casing pipes of pipe well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110202

Termination date: 20140520