CN201721975U - Novel air cannon installment structure - Google Patents

Novel air cannon installment structure Download PDF

Info

Publication number
CN201721975U
CN201721975U CN2010202188525U CN201020218852U CN201721975U CN 201721975 U CN201721975 U CN 201721975U CN 2010202188525 U CN2010202188525 U CN 2010202188525U CN 201020218852 U CN201020218852 U CN 201020218852U CN 201721975 U CN201721975 U CN 201721975U
Authority
CN
China
Prior art keywords
pipeline
nozzle
storage tank
air
installment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202188525U
Other languages
Chinese (zh)
Inventor
贾卫中
武新宽
冯柳磊
王江伟
王自达
郭银柱
孙杰飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PUYANG YALI MACHINERY MANUFACTURE CO Ltd
Original Assignee
PUYANG YALI MACHINERY MANUFACTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PUYANG YALI MACHINERY MANUFACTURE CO Ltd filed Critical PUYANG YALI MACHINERY MANUFACTURE CO Ltd
Priority to CN2010202188525U priority Critical patent/CN201721975U/en
Application granted granted Critical
Publication of CN201721975U publication Critical patent/CN201721975U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a novel air cannon installment structure, which comprises an air storage tank and a pipeline, wherein one side of the air storage tank is provided with a pneumatic release assembly which is recessed into the air storage tank, the other side is provided with an air injection pipe, the end of the air injection pipe is obliquely downwardly provided with a nozzle, the nozzle is arranged on the outer portion of the pipeline, the pipeline is provided with an air injection port, the nozzle and the air injection port are fixedly connected, the top of the air storage tank is provided with a hanging ring, and the hanging ring and the pipeline are connected through a lifting rope. The air cannon installment novel structure has the advantages of reasonable design, simple structure and simpler and easier installment, materials in the pipeline are not easy to be blocked, and even though being blocked, the materials are easier to be dredged, thereby greatly reducing the damage degree to the walls of the pipeline, having higher practicability, and being easy to popularize and apply.

Description

Air bubble is installed new construction
Technical field
The utility model relates to a kind of air bubble, and particularly a kind of air bubble is installed new construction.
Background technology
Air bubble (another name: air flow-aid device, Arch-Breaking Device or Cleaning device for pipeline) is the isolated plant of phenomenons such as the material arch camber, the feed bin that prevent and eliminate all kinds feed bin, hopper, tube furcation place stop up, sticking wall, delay, is widely used in removing the occasion of important storing loose unpacked materials such as power station, cement mill, colliery, cement concrete processing factory.At present, the mounting structure of air bubble on pipeline exists some shortcomings or drawback, because the nozzle of air bubble penetrates pipeline pipe interior is set, pipe interior just forms bottleneck at the nozzle cross-section place, internal diameter of the pipeline diminishes, and is easy to cause certain obstruction on nozzle top, and nozzle towards duct wall often galled by material, form a leak, material is excessive to cause damage.
The utility model content
The utility model provides a kind of air bubble simple in structure, durable, not susceptible to plugging that new construction is installed in order to solve weak point of the prior art.
For solving the problems of the technologies described above, the utility model adopts following technical scheme: air bubble is installed new construction, comprise storage tank and pipeline, storage tank one side is provided with and is depressed in the pneumatic release assembly of storage tank in-to-in, opposite side is provided with gas ejector pipe, the terminal oblique nozzle that has of gas ejector pipe, and described nozzle is positioned at the pipeline outside, offer air nozzle on the pipeline, nozzle is captiveed joint with air nozzle.
Described storage tank top is provided with suspension ring, and suspension ring are connected by lifting rope with pipeline.
Adopt technique scheme, nozzle is arranged on the pipeline outside, pipe interior does not have bottleneck, and blockage alleviates greatly, even stopping up appears in pipeline in material, start electromagnetic valve, control pneumatic release assembly action, the high pressure gas in the storage tank just pass through gas ejector pipe, nozzle rapid release, the material in the gas intense impact pipeline, this has just played the block clearing mediation effect to obstruction material in the pipeline, and the degree of wear of duct wall is also greatly alleviated.The utility model is reasonable in design, simple in structure, installation is more simple and easy to do, and the material in the pipeline is difficult for stopping up, and also is easy to more dredge even stop up, and the degree of tortuosity of duct wall is alleviated greatly, and practicality is stronger, is easy to apply.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, air bubble of the present utility model is installed new construction, comprise storage tank 1 and pipeline 2, storage tank 1 one sides are provided with and are depressed in the pneumatic release assembly 3 of storage tank 1 in-to-in (be prior art, repeat no more), and opposite side is provided with gas ejector pipe 4, the gas ejector pipe 4 terminal oblique nozzles 5 that have, nozzle 5 is positioned at pipeline 2 outsides, offers air nozzle 6 on the pipeline 2, and nozzle 5 is captiveed joint (can adopt welding) with air nozzle 6.Storage tank 1 top is provided with suspension ring 7, and suspension ring 7 are connected by lifting rope 8 with pipeline 2.
When work is used, earlier pneumatic release assembly 3 is linked to each other with induction tract, because nozzle 5 is arranged on pipeline 2 outsides, pipeline 2 inside have not had the restriction of bottleneck, blockage alleviates greatly, even stopping up appears in pipeline in material, start electromagnetic valve, control pneumatic release assembly 3 actions, high pressure gas in the storage tank 1 are just by gas ejector pipe 4, nozzle 5 rapid release, material in the gas intense impact pipeline 2, this has just played the block clearing mediation effect to obstruction material in the pipeline 2, and the degree of wear of pipeline 2 inwalls is also greatly alleviated.

Claims (2)

1. air bubble is installed new construction, comprise storage tank and pipeline, storage tank one side is provided with and is depressed in the pneumatic release assembly of storage tank in-to-in, opposite side is provided with gas ejector pipe, the terminal oblique nozzle that has of gas ejector pipe, it is characterized in that: described nozzle is positioned at the pipeline outside, offers air nozzle on the pipeline, and nozzle is captiveed joint with air nozzle.
2. air bubble according to claim 1 is installed new construction, and it is characterized in that: described storage tank top is provided with suspension ring, and suspension ring are connected by lifting rope with pipeline.
CN2010202188525U 2010-06-08 2010-06-08 Novel air cannon installment structure Expired - Fee Related CN201721975U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202188525U CN201721975U (en) 2010-06-08 2010-06-08 Novel air cannon installment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202188525U CN201721975U (en) 2010-06-08 2010-06-08 Novel air cannon installment structure

Publications (1)

Publication Number Publication Date
CN201721975U true CN201721975U (en) 2011-01-26

Family

ID=43490282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202188525U Expired - Fee Related CN201721975U (en) 2010-06-08 2010-06-08 Novel air cannon installment structure

Country Status (1)

Country Link
CN (1) CN201721975U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104384148A (en) * 2014-11-20 2015-03-04 中冶焦耐工程技术有限公司 Coal-fired sleeve shaft kiln injection unblocking system
CN107499745A (en) * 2017-08-14 2017-12-22 淮北矿业股份有限公司 The measure hopper of stagnant coal inside a kind of processing
CN111622779A (en) * 2020-05-15 2020-09-04 中国矿业大学 Pulse type pressure compensation long-distance concrete conveying device and using method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104384148A (en) * 2014-11-20 2015-03-04 中冶焦耐工程技术有限公司 Coal-fired sleeve shaft kiln injection unblocking system
CN104384148B (en) * 2014-11-20 2016-09-07 中冶焦耐工程技术有限公司 Coal-fired BASK winding-up blockage removal system
CN107499745A (en) * 2017-08-14 2017-12-22 淮北矿业股份有限公司 The measure hopper of stagnant coal inside a kind of processing
CN111622779A (en) * 2020-05-15 2020-09-04 中国矿业大学 Pulse type pressure compensation long-distance concrete conveying device and using method

Similar Documents

Publication Publication Date Title
CN201568076U (en) Drilling hole sealing device in highly gassy mine
CN201721975U (en) Novel air cannon installment structure
CN201808842U (en) Coal bucket coal injection device
CN204057246U (en) Solve the top-guiding type storehouse pump of discharging pipe plug phenomenon
CN2926144Y (en) Pipe in pipe
CN202912388U (en) Rapid delivery device of powder materials
CN204490021U (en) A kind of device preventing metallurgical fine coal delivery duct from blocking
CN201459155U (en) Device for reclaiming coal dust of blast furnace
CN204627665U (en) Mining import air pump anti-clogging high strength tap
CN204199310U (en) Gas slurry guiding device
CN203939067U (en) Dry dock silt displacement device
CN203316111U (en) Anti-blocking reaction kettle
CN204943044U (en) A kind of device removed for gas pipe line impurity
CN202001778U (en) Slag discharging device for coal pillar pipeline
CN206203468U (en) A kind of blow tank conveying system anti-block apparatus
CN204080984U (en) A kind of water-pipe blockage dredger
CN201721841U (en) Novel underground air cannon block clearing system installation structure
CN205065750U (en) A soot blower for coal fired power plant circular flue
CN204453828U (en) The adjustable fluidization transmitter of pneumatic material conveying system
CN204767984U (en) A low pressure pulse discharge apparatus for dust collecting equipment
CN204074646U (en) Air bubble under barotropic state
CN203624576U (en) Leftover material conveying device in footwear industry
CN103157631A (en) Device for lowering blowing noise of steel tube dust blowing and sucking device
CN102974582B (en) Pulsed nozzle for cleaning high temperature coke oven raw gas pipeline
CN203317234U (en) Sand storage device of mobile sandblasting derusting machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110126

Termination date: 20120608