CN201717586U - 输电线路杆塔接地摇表收线器 - Google Patents

输电线路杆塔接地摇表收线器 Download PDF

Info

Publication number
CN201717586U
CN201717586U CN2010202542810U CN201020254281U CN201717586U CN 201717586 U CN201717586 U CN 201717586U CN 2010202542810 U CN2010202542810 U CN 2010202542810U CN 201020254281 U CN201020254281 U CN 201020254281U CN 201717586 U CN201717586 U CN 201717586U
Authority
CN
China
Prior art keywords
box body
casing
right sides
megger
spooler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202542810U
Other languages
English (en)
Inventor
王琨
郑远锋
胡江华
司渭滨
许阳
陆震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XI'AN POWER SUPPLY BUREAU
State Grid Corp of China SGCC
Original Assignee
XI'AN POWER SUPPLY BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XI'AN POWER SUPPLY BUREAU filed Critical XI'AN POWER SUPPLY BUREAU
Priority to CN2010202542810U priority Critical patent/CN201717586U/zh
Application granted granted Critical
Publication of CN201717586U publication Critical patent/CN201717586U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型公开了一种输电线路杆塔接地摇表收线器,该收线器由箱体、摇柄、绕线卷筒组成,箱体中间设置有中隔板,中隔板将箱体分为左右两侧,箱体外左右侧分别设置有左右摇柄,箱体内部设置有左右绕线卷筒,左右绕线卷筒与左右摇柄分别相连。在箱体上方有箱体提手,箱体正面有箱门,箱门与箱体通过箱门合叶连接。箱体下方设置箱体支腿。本实用新型便于使用和携带的手动机械收放线装置,将原来每级测量时间由20分钟缩短为10分钟。接地电阻摇表连接电线受到保护,无损伤情况出现。该收线器能够实现预期功能。

Description

输电线路杆塔接地摇表收线器 
技术领域
本实用新型属于一种导线缠绕机械装置,特别涉及输电线路杆塔接地摇表收线器。 
背景技术
输电线路运行单位在对杆塔接地电阻进行测量时,使用的摇测接地装置上的导线长度较长(一般20-40米),一般采取手工收放,在收放时耗费时间和精力不易携带,同时频繁的收放、缠绕导线会对加速减少电线使用寿命,甚至在使用过程中就发生断裂,使测量接地电阻工作被迫中途停止,影响了正常工作的开展。 
发明内容
本实用新型的目的在于克服上述现有技术不足,提供一种输电线路杆塔接地摇表收线器,该收线器的研制可以快速收放电线,提高工作效率,并对电线起到保护作用,延长设备导线使用寿命。 
本实用新型的技术方案是这样实现的: 
该收线器由箱体、摇柄、绕线卷筒组成,箱体中间设置有中隔板,中隔板将箱体分为左右两侧,箱体外左右侧分别设置有左右摇柄,箱体内部设置有左右绕线卷筒,左右绕线卷筒与左右摇柄分别相连。 
在箱体上方有箱体提手,箱体正面有箱门,箱门与箱体通过箱门合叶连接。 
箱体下方设置箱体支腿。 
本实用新型便于使用和携带的手动机械收放线装置,将原来每级测量时间由20分钟缩短为10分钟。接地电阻摇表连接电线受到保护,无损伤情况出现。该收线器能够实现预期功能。 
附图说明
附图1是本实用新型的结构示意图; 
下面结合附图对本实用新型的内容作进一步详细说明。 
具体实施方式
参照附图所示,该收线器由箱体2、摇柄、绕线卷筒组成,箱体中间设置有中隔板5,中隔板5将箱体2分为左右两侧,箱体外左右侧分别设置有左右摇柄1、10,箱体内部设置有左右绕线卷筒3、6,左右绕线卷筒3、6与左右摇柄1、10分别相连。 
在箱体上方有箱体提手4,箱体正面有箱门7,箱门7与箱体2通过箱门合叶8连接。 
箱体下方设置箱体支腿9。 
通过对接地电阻摇测装置进行研究,其连接电线分为长短两根,分别为20米、40米及10米、20米两种,线径2.5mm2,故在收放器设计时应考虑两根电线的长短问题。该方式通过轴承进行收放电线,能够对长短不一的线路分别进行收放。在收放器旁侧有电线接头,可以在不拆卸电线的情况下连接仪器,避免了频繁拆收对电线的损伤。 
采用两段收线方案,将收线器用隔板分为两部分,每部分带有活动轮轴级摇柄,可分别收放长度不同的电线。该方案具有简单、方便操作等优点, 但是只完成了收线功能,比较粗糙,是收线器的雏形。减轻收线器重量的同时,保证电线不受潮、不磨损。 

Claims (3)

1.输电线路杆塔接地摇表收线器,其特征在于,该收线器由箱体(2)、摇柄、绕线卷筒组成,箱体中间设置有中隔板(5),中隔板(5)将箱体(2)分为左右两侧,箱体外左右侧分别设置有左右摇柄(1、10),箱体内部设置有左右绕线卷筒(3、6),左右绕线卷筒(3、6)与左右摇柄(1、10)分别相连。
2.根据权利要求1所述的输电线路杆塔接地摇表收线器,其特征在于,在箱体上方有箱体提手(4),箱体正面有箱门(7),箱门(7)与箱体(2)通过箱门合叶(8)连接。
3.根据权利要求1所述的输电线路杆塔接地摇表收线器,其特征在于,箱体下方设置箱体支腿(9)。 
CN2010202542810U 2010-07-09 2010-07-09 输电线路杆塔接地摇表收线器 Expired - Lifetime CN201717586U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202542810U CN201717586U (zh) 2010-07-09 2010-07-09 输电线路杆塔接地摇表收线器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202542810U CN201717586U (zh) 2010-07-09 2010-07-09 输电线路杆塔接地摇表收线器

Publications (1)

Publication Number Publication Date
CN201717586U true CN201717586U (zh) 2011-01-19

Family

ID=43463592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202542810U Expired - Lifetime CN201717586U (zh) 2010-07-09 2010-07-09 输电线路杆塔接地摇表收线器

Country Status (1)

Country Link
CN (1) CN201717586U (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102866302A (zh) * 2012-10-17 2013-01-09 宁夏电力公司石嘴山供电局 便携式仪表箱
CN104261210A (zh) * 2014-10-29 2015-01-07 国家电网公司 输电线路杆塔接地电阻测量放线专用工具
CN104444619A (zh) * 2014-10-29 2015-03-25 国家电网公司 输电线路杆塔接地电阻测量放线专用装置
CN107986099A (zh) * 2017-10-17 2018-05-04 安徽电信器材贸易工业有限责任公司 一种储线装置
CN110824255A (zh) * 2019-11-12 2020-02-21 长春工程学院 输电线路杆塔接地电阻测量装置

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102866302A (zh) * 2012-10-17 2013-01-09 宁夏电力公司石嘴山供电局 便携式仪表箱
CN104261210A (zh) * 2014-10-29 2015-01-07 国家电网公司 输电线路杆塔接地电阻测量放线专用工具
CN104444619A (zh) * 2014-10-29 2015-03-25 国家电网公司 输电线路杆塔接地电阻测量放线专用装置
CN104444619B (zh) * 2014-10-29 2016-06-01 国家电网公司 输电线路杆塔接地电阻测量放线专用装置
CN107986099A (zh) * 2017-10-17 2018-05-04 安徽电信器材贸易工业有限责任公司 一种储线装置
CN110824255A (zh) * 2019-11-12 2020-02-21 长春工程学院 输电线路杆塔接地电阻测量装置

Similar Documents

Publication Publication Date Title
CN201717586U (zh) 输电线路杆塔接地摇表收线器
CN204144727U (zh) 一种便携式移动检修电源箱
CN202383165U (zh) 一体化接地摇表收纳装置
CN203079030U (zh) 接地电阻测试仪专用仪表箱
CN202495580U (zh) 携带绕线盘短路接地线
CN201541103U (zh) 全效型风动驱鸟器
CN205319563U (zh) 一种便携式检修电源箱
CN201903591U (zh) 一种输电线路接地电阻摇表箱
CN203232102U (zh) 便携式接地电阻测试收放线器
CN202362387U (zh) 防雷抗干扰接地电阻测量系统
CN204216555U (zh) 一种现场试验电缆支架
CN204905469U (zh) 一种配电线路检修保护接地装置
CN205210130U (zh) 接地摇表配套收放线装置
CN202797759U (zh) 变电站掏鸟巢用网兜
CN204400356U (zh) 一种杆塔接地电阻测试线收放装置
CN204922818U (zh) 一种设有摄像头的环保路灯
CN102837996A (zh) 一种送电线路接地电阻测量摇表的引线盘
CN202676807U (zh) 接地电阻测量装置
CN207098080U (zh) 吸收式防雷接地体
CN204886250U (zh) 一种可移动供电装置
CN205157715U (zh) 一种套管表面泄漏电流屏蔽工具
CN202930885U (zh) 一种农网接地线路
CN204834912U (zh) 电缆接线防护盒
CN205122242U (zh) 充电桩用弹簧电缆
CN201229840Y (zh) 一种适用于测量接地电流的大型变压器接地引线

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: XI'AN POWER SUPPLY BUREAU

Effective date: 20140326

Owner name: XI'AN POWER SUPPLY BUREAU

Effective date: 20140326

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 710032 XI'AN, SHAANXI PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20140326

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Xi'an Power Supply Bureau

Address before: 710032 No. 159 East Ring Road, Shaanxi, Xi'an

Patentee before: Xi'an Power Supply Bureau

CX01 Expiry of patent term

Granted publication date: 20110119

CX01 Expiry of patent term