CN201707219U - Detection device for temperature control water faucet - Google Patents

Detection device for temperature control water faucet Download PDF

Info

Publication number
CN201707219U
CN201707219U CN201020109895XU CN201020109895U CN201707219U CN 201707219 U CN201707219 U CN 201707219U CN 201020109895X U CN201020109895X U CN 201020109895XU CN 201020109895 U CN201020109895 U CN 201020109895U CN 201707219 U CN201707219 U CN 201707219U
Authority
CN
China
Prior art keywords
test
hot water
water tank
temperature
cold water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020109895XU
Other languages
Chinese (zh)
Inventor
谢明舜
唐敏俊
陈志强
王津军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Institute of Quality Inspection and Technical Research
Original Assignee
Shanghai Institute of Quality Inspection and Technical Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Institute of Quality Inspection and Technical Research filed Critical Shanghai Institute of Quality Inspection and Technical Research
Priority to CN201020109895XU priority Critical patent/CN201707219U/en
Application granted granted Critical
Publication of CN201707219U publication Critical patent/CN201707219U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

本实用新型公开了温控水嘴产品检测装置,包括综合测试台和寿命测试台,综合测试台上设有第一冷热水性能测试单元,扭矩测试单元和试压单元,寿命测试台上设有第二冷热水性能测试单元,上述单元还与数据处理及控制单元连接。本实用新型的综合测试台可以按照国内、外标准进行温控水嘴的强度试验、密封性试验、出水温度试验、流量试验、安全性试验、温度稳定性试验、操作扭矩试验等测试项目,寿命试验台上可以按照国内、外标准进行温控水嘴的调节机构寿命耐久试验、循环交变换水寿命耐久试验、灵敏性试验等测试项目。本实用新型的优点在于该装置使用广泛,能够适用于多种测试项目,且测试灵活方便。

Figure 201020109895

The utility model discloses a temperature-controlled faucet product detection device, which comprises a comprehensive testing platform and a life testing platform. The comprehensive testing platform is provided with a first cold and hot water performance testing unit, a torque testing unit and a pressure testing unit. There is a second cold and hot water performance testing unit, and the above-mentioned unit is also connected with the data processing and control unit. The comprehensive test bench of the utility model can carry out test items such as strength test, sealing test, water outlet temperature test, flow test, safety test, temperature stability test, operating torque test and other test items of temperature-controlled faucets according to domestic and foreign standards. On the test bench, test items such as the life durability test of the adjustment mechanism of the temperature control faucet, the life durability test of the circulating alternating water change, and the sensitivity test can be carried out in accordance with domestic and foreign standards. The utility model has the advantages that the device is widely used, can be applied to various test items, and the test is flexible and convenient.

Figure 201020109895

Description

温控水嘴产品检测装置 Temperature control faucet product testing device

技术领域technical field

本实用新型涉及温控水嘴测试领域,具体涉及温控水嘴产品检测装置。The utility model relates to the field of testing temperature-controlled faucets, in particular to a product detection device for temperature-controlled faucets.

背景技术Background technique

温控水嘴又称恒温混水龙头或恒温控制阀,是近年来由国外引进的新一代智能型终端洗浴用水设备,其产品内部具有热胀冷缩物理特性的热敏感温控制元件,在使用中可以自动恒温控制混合水的出水温度,而且在冷水失供时具有安全保护的特点。The temperature control faucet, also known as the constant temperature mixing faucet or the constant temperature control valve, is a new generation of intelligent terminal bathing water equipment introduced from abroad in recent years. The outlet temperature of the mixed water can be automatically controlled by constant temperature, and it has the feature of safety protection when the cold water is out of supply.

近年来,温控水嘴发展极为迅速,国外的产品已经进入国内市场,国内产品的生产销售已初具规模,并且有部分产品出口国外,QB2806-2006《温控水嘴》于2007年5月1日开始实施,填补了国内标准方面的空白,主要有强度试验、密封性能、流量、温度稳定性、安全性、出水温度、寿命试验、操作扭矩等指标。In recent years, temperature-controlled faucets have developed extremely rapidly. Foreign products have entered the domestic market. The production and sales of domestic products have begun to take shape, and some products are exported abroad. QB2806-2006 "Temperature-controlled faucets" was published in May 2007 It started to be implemented on the 1st, filling the gaps in domestic standards, mainly including strength test, sealing performance, flow rate, temperature stability, safety, outlet water temperature, life test, operating torque and other indicators.

据了解,目前国内外尚具有符合上述标准的综合性温控水嘴检测装置。国内温控水嘴检测设备的研发相对比较滞后,QB2806-2006《温控水嘴》于2007年5月开始实施后,设备制造商才开始温控水嘴检测装置的研发;国外检测装置也仅针对EN1111:1998、ASSE1016-2005、ASME A112.18.1-2005/CSA B125.1-05中的某个标准或标准中的部分参数而设计的,有很大的局限性。It is understood that there are comprehensive temperature-controlled nozzle detection devices that meet the above standards at home and abroad. The research and development of domestic temperature-controlled faucet detection equipment is relatively lagging behind. After the implementation of QB2806-2006 "Temperature-controlled Faucet" in May 2007, equipment manufacturers began to develop temperature-controlled faucet detection devices; foreign detection devices only Designed for a standard or some parameters in EN1111:1998, ASSE1016-2005, ASME A112.18.1-2005/CSA B125.1-05, it has great limitations.

发明内容Contents of the invention

本实用新型的目的是提供一种温控水嘴产品检测装置,这是一套能够满足国内外相关标准测试要求的温控水嘴检测的装置。The purpose of the utility model is to provide a temperature-controlled faucet product detection device, which is a set of temperature-controlled faucet detection device that can meet the test requirements of relevant domestic and foreign standards.

为了实现上述目的,本实用新型的技术方案如下:温控水嘴产品检测装置,包括综合测试台和寿命测试台,综合测试台上设有第一冷热水性能测试单元,扭矩测试单元和试压单元,寿命测试台上设有第二冷热水性能测试单元,上述单元还与数据处理及控制单元连接。In order to achieve the above object, the technical scheme of the utility model is as follows: the temperature control faucet product detection device includes a comprehensive test bench and a life test bench, and the comprehensive test bench is provided with a first cold and hot water performance test unit, a torque test unit and a test unit. pressure unit, and a second cold and hot water performance test unit is arranged on the life test bench, and the above-mentioned unit is also connected with the data processing and control unit.

综合测试台包括第一冷热水性能测试单元,第一冷热水性能测试单元包括第一热水箱和第一冷水箱,第一热水箱和第一冷水箱均设有温度控制装置,第一热水箱通过和第一热水管路与第一热水测试口连接,第一冷水箱通过第一冷水管路与第一冷水测试口连接,第一流量测试口通过第一混合水回水管道分别与第一热水箱和第一冷水箱连接,第一流量测试口设有第一压力传感器、第一流量传感器和第一温度传感器,第一压力传感器与第一压力显示仪连接,第一流量传感器与第一流量显示仪连接,第一温度传感器与第一温度显示仪连接;第一冷水测试口设有第二温度传感器和第二压力传感器,第二压力传感器与第二压力显示仪连接,第二温度传感器与第二温度显示仪连接;第一热水测试口前端还设有第三温度传感器和第三压力传感器,第三压力传感器与第三压力显示仪连接,第三温度传感器与第三温度显示仪连接。The comprehensive test bench includes a first cold and hot water performance test unit, and the first cold and hot water performance test unit includes a first hot water tank and a first cold water tank, both of which are equipped with temperature control devices, The first hot water tank is connected to the first hot water test port through the first hot water pipeline, the first cold water tank is connected to the first cold water test port through the first cold water pipeline, and the first flow test port is passed through the first mixed water The return water pipes are respectively connected to the first hot water tank and the first cold water tank, the first flow test port is provided with a first pressure sensor, a first flow sensor and a first temperature sensor, and the first pressure sensor is connected to the first pressure display , the first flow sensor is connected to the first flow display instrument, the first temperature sensor is connected to the first temperature display instrument; the first cold water test port is provided with a second temperature sensor and a second pressure sensor, and the second pressure sensor is connected to the second pressure sensor The display is connected, the second temperature sensor is connected with the second temperature display; the front end of the first hot water test port is also provided with a third temperature sensor and a third pressure sensor, the third pressure sensor is connected with the third pressure display, and the third The temperature sensor is connected with the third temperature display instrument.

寿命测试台包括第二冷热水性能测试单元,第二冷热水性能测试单元包括第二热水箱和第二冷水箱,第二热水箱和第二冷水箱均设有温度控制装置,第二热水箱通过和第二热水管路与第二热水测试口连接,第二冷水箱通过第二冷水管路与第二冷水测试口连接,第二冷水箱还通过冷水辅助管路分别与第二热水测试口和第二冷水测试口连接,第二流量测试口通过第二混合水回水管道分别与第二热水箱和第二冷水箱连接,第二流量测试口设有第四压力传感器、第四流量传感器和第四温度传感器,第四压力传感器与第四压力显示仪连接,第四流量传感器与第四流量显示仪连接,第四温度传感器与第四温度显示仪连接;第二冷水测试口设有第五温度传感器和第五压力传感器,第五压力传感器与第五压力显示仪连接,第二温度传感器与第五温度显示仪连接;第二热水测试口前端还设有第六温度传感器和第六压力传感器,第六压力传感器与第六压力显示仪连接,第六温度传感器与第六温度显示仪连接,扭矩试验软轴与步进电机连接,步进电机和驱动装置连接。The life test bench includes a second cold and hot water performance test unit, the second cold and hot water performance test unit includes a second hot water tank and a second cold water tank, the second hot water tank and the second cold water tank are equipped with temperature control devices, The second hot water tank is connected to the second hot water test port through the second hot water pipeline, the second cold water tank is connected to the second cold water test port through the second cold water pipeline, and the second cold water tank is also connected to the cold water auxiliary pipeline They are respectively connected to the second hot water test port and the second cold water test port, and the second flow test port is respectively connected to the second hot water tank and the second cold water tank through the second mixed water return pipe, and the second flow test port is provided with The fourth pressure sensor, the fourth flow sensor and the fourth temperature sensor, the fourth pressure sensor is connected to the fourth pressure display, the fourth flow sensor is connected to the fourth flow display, and the fourth temperature sensor is connected to the fourth temperature display ; The second cold water test port is provided with a fifth temperature sensor and a fifth pressure sensor, the fifth pressure sensor is connected with the fifth pressure display instrument, and the second temperature sensor is connected with the fifth temperature display instrument; the front end of the second hot water test port is also There is a sixth temperature sensor and a sixth pressure sensor, the sixth pressure sensor is connected with the sixth pressure display, the sixth temperature sensor is connected with the sixth temperature display, the torque test flexible shaft is connected with the stepper motor, and the stepper motor and Drive connection.

本实用新型的综合测试台可以按照国内、外标准进行温控水嘴的强度试验、密封性试验、出水温度试验、流量试验、安全性试验、温度稳定性试验、操作扭矩试验等测试项目。寿命试验台上可以按照国内、外标准进行温控水嘴的调节机构寿命耐久试验、循环交变换水寿命耐久试验、灵敏性试验等测试项目。本实用新型的优点在于该装置使用广泛,能够适用于多种测试项目,且测试灵活方便。The comprehensive test bench of the utility model can carry out test items such as strength test, sealing test, water outlet temperature test, flow test, safety test, temperature stability test, operating torque test and other test items of the temperature-controlled faucet according to domestic and foreign standards. On the life test bench, according to domestic and foreign standards, the temperature control faucet adjustment mechanism life durability test, cycle alternating water change life durability test, sensitivity test and other test items can be carried out. The utility model has the advantages that the device is widely used, can be applied to various test items, and the test is flexible and convenient.

附图说明Description of drawings

图1为本实用新型的系统框图Fig. 1 is a system block diagram of the utility model

图2为第一冷热水性能测试单元的系统流程图Fig. 2 is the system flowchart of the first cold and hot water performance testing unit

图3为扭矩测试单元的结构示意图Figure 3 is a schematic diagram of the structure of the torque test unit

图4为试压单元的结构示意图Figure 4 is a schematic diagram of the structure of the pressure test unit

图5为第二冷热水性能测试单元的系统流程图Fig. 5 is the system flowchart of the second cold and hot water performance testing unit

具体实施方式Detailed ways

下面结合附图和实施例对本实用新型作详细说明。Below in conjunction with accompanying drawing and embodiment the utility model is described in detail.

温控水嘴产品检测装置,包括综合测试台1和寿命测试台2,综合测试台1上设有第一冷热水性能测试单元3,扭矩测试单元4和试压单元5,寿命测试台2上设有第二冷热水性能测试单元6,上述单元还与数据处理及控制单元7连接。The temperature-controlled faucet product testing device includes a comprehensive test bench 1 and a life test bench 2. The comprehensive test bench 1 is equipped with a first cold and hot water performance test unit 3, a torque test unit 4 and a pressure test unit 5, and a life test bench 2. A second cold and hot water performance testing unit 6 is arranged on the top, and the above-mentioned unit is also connected with a data processing and control unit 7 .

综合测试台包括第一冷热水性能测试单元3,第一冷热水性能测试单元3包括第一热水箱101和第一冷水箱102,第一热水箱101和第一冷水箱102均设有温度控制装置,第一热水箱101通过和第一热水管路与第一热水测试口105连接,第一冷水箱102通过第一冷水管路与第一冷水测试口104连接,第一流量测试口106通过第一混合水回水管道分别与第一热水箱101和第一冷水箱102连接,第一流量测试口106设有第一压力传感器111、第一流量传感器108和第一温度传感器109,第一压力传感器111与第一压力显示仪112连接,第一流量传感器108与第一流量显示仪107连接,第一温度传感器109与第一温度显示仪110连接;第一冷水测试口104设有第二温度传感器113和第二压力传感器114,第二压力传感器114与第二压力显示仪115连接,第二温度传感器113与第二温度显示仪116连接;第一热水测试口105前端还设有第三温度传感器117和第三压力传感器118,第三压力传感器118与第三压力显示仪119连接,第三温度传感器117与第三温度显示仪120连接,用于测试出水温度试验和温度稳定性等试验。The comprehensive test bench includes a first cold and hot water performance test unit 3, and the first cold and hot water performance test unit 3 includes a first hot water tank 101 and a first cold water tank 102, and both the first hot water tank 101 and the first cold water tank 102 are A temperature control device is provided, the first hot water tank 101 is connected to the first hot water test port 105 through the first hot water pipeline, the first cold water tank 102 is connected to the first cold water test port 104 through the first cold water pipeline, The first flow test port 106 is respectively connected with the first hot water tank 101 and the first cold water tank 102 through the first mixed water return pipe, and the first flow test port 106 is provided with a first pressure sensor 111, a first flow sensor 108 and The first temperature sensor 109, the first pressure sensor 111 is connected with the first pressure display instrument 112, the first flow sensor 108 is connected with the first flow display instrument 107, and the first temperature sensor 109 is connected with the first temperature display instrument 110; The cold water test port 104 is provided with a second temperature sensor 113 and a second pressure sensor 114, the second pressure sensor 114 is connected with the second pressure display instrument 115, and the second temperature sensor 113 is connected with the second temperature display instrument 116; the first hot water The front end of the test port 105 is also provided with a third temperature sensor 117 and a third pressure sensor 118, the third pressure sensor 118 is connected with the third pressure display instrument 119, and the third temperature sensor 117 is connected with the third temperature display instrument 120 for testing Outlet water temperature test and temperature stability test.

被测水嘴121如图所示安装,其热水进水口与第一热水测试口105连接,冷水进水口与第一冷水测试口104连接,出口与第一流量测试口106连接。The tested faucet 121 is installed as shown in the figure, its hot water inlet is connected with the first hot water test port 105 , its cold water inlet is connected with the first cold water test port 104 , and its outlet is connected with the first flow test port 106 .

第一混合水回流管道通过一个常开电磁阀HS和一个常闭采集电磁阀CJ与计量出口连接,计量出口下方设有量杯122,量杯122放置在电子天平123上,电子天平带有计算机通讯接口RS485,可将测试数据传送至计算机。在测试时,系统在停止冷水供应的同时,关闭常开电磁阀HS并打开常闭采集电磁阀CJ,系统测量并记录此时的出水量。The first mixed water return pipeline is connected to the metering outlet through a normally open solenoid valve HS and a normally closed collection solenoid valve CJ, a measuring cup 122 is arranged below the metering outlet, and the measuring cup 122 is placed on an electronic balance 123, which has a computer communication interface RS485, the test data can be sent to the computer. During the test, when the system stops the cold water supply, it closes the normally open solenoid valve HS and opens the normally closed collection solenoid valve CJ, and the system measures and records the water output at this time.

第一混合水回流管道还通过第二流量传感器124与流量测试混合水出口126连接,第二流量传感器124与第二流量显示仪125连接,用于流量试验。The first mixed water return pipeline is also connected to the flow test mixed water outlet 126 through the second flow sensor 124, and the second flow sensor 124 is connected to the second flow indicator 125 for flow test.

试验冷水温度控制装置主要由PID智能温度控制仪103、温度传感器127、电动比例调节阀128、循环冷却泵129、换水泵130、热交换器131、冷水机组132等组成。工作时由PID智能温度控制仪根据实测温度和设定温度的温差转换成模拟信号自动控制电动调节阀的开度,试验冷水以合适的比例进入热交换器与冷水机组提供的低温水进行热量交换,实现试验冷水的恒温控制。The test cold water temperature control device is mainly composed of PID intelligent temperature controller 103, temperature sensor 127, electric proportional control valve 128, circulating cooling pump 129, water exchange pump 130, heat exchanger 131, chiller 132 and so on. When working, the PID intelligent temperature controller converts the temperature difference between the measured temperature and the set temperature into an analog signal to automatically control the opening of the electric control valve, and the test cold water enters the heat exchanger at a suitable ratio to exchange heat with the low-temperature water provided by the chiller. , Realize the constant temperature control of the test cold water.

试验热水的温度控制装置由PID智能温度控制仪103、温度传感器127、加热器133、可控硅触发模块134、加热功率调节装置136,换水泵130等组成。工作时PID智能温度控制仪根据实测温度和设定温度的温差自动控制可控硅触发模块的导通和断开,控制加热器的工作,实现试验热水的恒温控制。液位开关135用于控制热水箱的液位。The temperature control device of the test hot water is composed of a PID intelligent temperature controller 103, a temperature sensor 127, a heater 133, a thyristor trigger module 134, a heating power adjustment device 136, and a water exchange pump 130. When working, the PID intelligent temperature controller automatically controls the conduction and disconnection of the thyristor trigger module according to the temperature difference between the measured temperature and the set temperature, controls the work of the heater, and realizes the constant temperature control of the test hot water. The liquid level switch 135 is used to control the liquid level of the hot water tank.

对于试验中要求快速加热的工况,将温度设定后系统会自动接通快速加热器对水箱的热水进行加热,如果加热的速度不能达到要求,可以调整快速加热功率调节装置,使其满足升温时间的要求。For the working conditions that require fast heating in the test, after setting the temperature, the system will automatically turn on the fast heater to heat the hot water in the water tank. If the heating speed cannot meet the requirements, you can adjust the fast heating power adjustment device to meet the requirements. heating time requirements.

考虑到试验项目有热水降温要求及冬季原始冷水温度偏低,系统配置了一台换水泵,可以实现热水降温及冬季冷水升温。Considering that the test project requires hot water cooling and the original cold water temperature is low in winter, the system is equipped with a water exchange pump, which can realize hot water cooling and cold water heating in winter.

其中第一热水箱101和第一冷水箱102之间连接有平衡管137,第一混合水回水管道通过平衡管与第一热水箱及第一冷水箱连接。第一冷水管路(第一热水管路)设有冷水泵141(热水泵140)及三路旁通调节装置,在该实施例中采用电磁阀138和电动调节阀139串联连接,通过调节电动调节阀的开度,使回路的压力达到试验要求。这样可以根据试验要求预调冷、热水回路中的高、中、低三种压力工况,控制电磁阀的开启和闭合,满足相关试验要求。混合水回水管道内设有电动调节阀,通过调节电动调节阀的开度来控制出水流量。A balance pipe 137 is connected between the first hot water tank 101 and the first cold water tank 102, and the first mixed water return pipe is connected to the first hot water tank and the first cold water tank through the balance pipe. The first cold water pipeline (the first hot water pipeline) is provided with a cold water pump 141 (hot water pump 140) and a three-way bypass regulating device. In this embodiment, a solenoid valve 138 and an electric regulating valve 139 are connected in series. The opening of the electric regulating valve makes the pressure of the circuit meet the test requirements. In this way, the three pressure conditions of high, medium and low in the cold and hot water circuits can be pre-adjusted according to the test requirements, and the opening and closing of the solenoid valve can be controlled to meet the relevant test requirements. An electric regulating valve is provided in the mixed water return pipe, and the outlet water flow is controlled by adjusting the opening of the electric regulating valve.

综合测试台还包括扭矩测试单元4,该扭矩测试单元4包括夹持套142,夹持套142通过柔性连接轴143与扭矩输出轴144连接,扭矩输出轴144通过扭矩传感器145与蜗轮连接轴146连接,扭矩传感器146与扭矩显示仪147连接,蜗轮连接轴146与蜗轮148连接,蜗轮148与蜗杆149啮合连接,蜗杆149与手轮150连接。扭矩加载装置采用蜗轮蜗杆机构,转动蜗杆驱动蜗轮加载扭矩,加载至规定扭矩后可以保持自锁,扭矩传感器支持正反旋转,量程±10N.M。夹持套通过柔性传动轴与扭矩输出轴连接,可以方便的进行测试。温控水嘴的控制把手与夹持套142连接,即可利用该扭矩测试单元进行测试。151为带座轴承,152为轴承。The comprehensive test bench also includes a torque test unit 4, which includes a clamping sleeve 142, the clamping sleeve 142 is connected to the torque output shaft 144 through a flexible connecting shaft 143, and the torque output shaft 144 is connected to the worm gear connecting shaft 146 through a torque sensor 145 Connection, the torque sensor 146 is connected with the torque display 147, the worm gear connecting shaft 146 is connected with the worm gear 148, the worm gear 148 is engaged with the worm screw 149, and the worm screw 149 is connected with the hand wheel 150. The torque loading device adopts a worm gear mechanism, and the rotating worm drives the worm gear to load torque. After loading to the specified torque, it can maintain self-locking. The torque sensor supports forward and reverse rotation, and the range is ±10N.M. The clamping sleeve is connected with the torque output shaft through a flexible transmission shaft, which can be conveniently tested. The control handle of the temperature-controlled faucet is connected with the clamping sleeve 142, and the torque test unit can be used for testing. 151 is a bearing with seat, and 152 is a bearing.

综合测试台1还包括试压单元5,该试压单元5包括水箱153,水箱153与电动试压泵154的输入端连接,电动试压泵154的输出端与试压接口155连接,试压接口155设有压力传感器156,压力传感器156与压力显示仪157连接,电动试压泵154的输出端还通过电动调节阀158与水箱连接,回水接口160与水箱153连接。被测水嘴如图所示连接,试验时调节电动调节阀158的开度来控制系统的压力进行测试。图中159为出水堵头,161为被测水嘴,162为限压阀,163为浮球开关,164为补水阀。The comprehensive test bench 1 also includes a pressure test unit 5, the pressure test unit 5 includes a water tank 153, the water tank 153 is connected to the input end of the electric pressure test pump 154, the output end of the electric pressure test pump 154 is connected to the pressure test interface 155, and the pressure test The interface 155 is provided with a pressure sensor 156, the pressure sensor 156 is connected to the pressure indicator 157, the output end of the electric pressure test pump 154 is also connected to the water tank through the electric regulating valve 158, and the water return interface 160 is connected to the water tank 153. The faucet to be tested is connected as shown in the figure, and the opening of the electric regulating valve 158 is adjusted to control the pressure of the system during the test for testing. Among the figure, 159 is a water outlet plug, 161 is a tested faucet, 162 is a pressure limiting valve, 163 is a float switch, and 164 is a water filling valve.

该温控水嘴综合性能测试的装置还包括寿命测试台2,寿命测试台2包括第二冷热水性能测试单元6,第二冷热水性能测试单元6包括第二热水箱201和第二冷水箱202,第二热水箱201和第二冷水箱202均设有温度控制装置,第二热水箱201通过和第二热水管路205与第二热水测试口203连接,第二冷水箱202通过第二冷水管路206与第二冷水测试口204连接,第二冷水箱201还通过冷水辅助管路207分别与第二热水测试口203和第二冷水测试口204连接,第二流量测试口208通过第二混合水回水管道209分别与第二热水箱201和第二冷水箱202连接,第二流量测试口208设有第四压力传感器210、第四流量传感器211和第四温度传感器212,第四压力传感器210与第四压力显示仪213连接,第四流量传感器211与第四流量显示仪214连接,第四温度传感器212与第四温度显示仪215连接;第二冷水测试口204设有第五温度传感器216和第五压力传感器217,第五压力传感器217与第五压力显示仪218连接,第二温度传感器216与第五温度显示仪219连接;第二热水测试口203前端还设有第六温度传感器220和第六压力传感器221,第六压力传感器221与第六压力显示仪222连接,第六温度传感器220与第六温度显示仪223连接,扭矩试验软轴224与步进电机225连接,步进电机225和驱动装置226连接。The device for comprehensive performance testing of temperature-controlled faucets also includes a life test bench 2, and the life test bench 2 includes a second cold and hot water performance test unit 6, and the second cold and hot water performance test unit 6 includes a second hot water tank 201 and a second hot water tank 201. The second cold water tank 202, the second hot water tank 201 and the second cold water tank 202 are all provided with a temperature control device, the second hot water tank 201 is connected with the second hot water test port 203 through the second hot water pipeline 205, and The second cold water tank 202 is connected to the second cold water test port 204 through the second cold water pipeline 206, and the second cold water tank 201 is also connected to the second hot water test port 203 and the second cold water test port 204 respectively through the cold water auxiliary pipeline 207, The second flow test port 208 is respectively connected to the second hot water tank 201 and the second cold water tank 202 through the second mixed water return pipe 209, and the second flow test port 208 is provided with a fourth pressure sensor 210 and a fourth flow sensor 211 And the fourth temperature sensor 212, the fourth pressure sensor 210 is connected with the fourth pressure display instrument 213, the fourth flow sensor 211 is connected with the fourth flow display instrument 214, and the fourth temperature sensor 212 is connected with the fourth temperature display instrument 215; The second cold water test port 204 is provided with the fifth temperature sensor 216 and the fifth pressure sensor 217, the fifth pressure sensor 217 is connected with the fifth pressure display instrument 218, and the second temperature sensor 216 is connected with the fifth temperature display instrument 219; The front end of the water test port 203 is also provided with a sixth temperature sensor 220 and a sixth pressure sensor 221, the sixth pressure sensor 221 is connected to the sixth pressure display instrument 222, the sixth temperature sensor 220 is connected to the sixth temperature display instrument 223, and the torque test The flexible shaft 224 is connected with a stepping motor 225 , and the stepping motor 225 is connected with a driving device 226 .

其中第二热水箱201和第二冷水箱202之间连接有平衡管227,第二混合水回水管道209通过平衡管227与第二热水箱201及第二冷水箱202连接。第二热水箱和第二冷水箱的温度控制装置和第一热水箱及第一冷水箱类似,在此不再赘述。A balance pipe 227 is connected between the second hot water tank 201 and the second cold water tank 202 , and the second mixed water return pipe 209 is connected to the second hot water tank 201 and the second cold water tank 202 through the balance pipe 227 . The temperature control devices of the second hot water tank and the second cold water tank are similar to those of the first hot water tank and the first cold water tank, and will not be repeated here.

第二冷水管路设有冷水泵228,冷水泵228和第二冷水测试口204之间设有第一电磁阀231和第一单向阀232,第二热水管路设有热水泵229,热水泵229和第二热水测试口203之间设有第四电磁阀233和第四单向阀234,冷水辅助管路设有冷水辅助泵230,冷水辅助泵230与第二冷水测试口204之间设有第二电磁阀235和第二单向阀236,冷水辅助管路230与第二热水测试口203之间设有第三电磁阀237和第三单向阀238,调节冷水管路和热水管路中电动调节阀243的开度,使冷水管路和热水管路的压力达到试验要求。调节冷水辅助管路中电动调节阀241的开度,调节冷水辅助管路的压力达到试验要求。这样可以根据交替换水的寿命试验要求预调两种工况的冷、热水端的进口压力,试验时控制电磁阀的开启和闭合,满足相关试验要求。图中242为冷水辅助管路中的电磁阀。The second cold water pipeline is provided with a cold water pump 228, a first electromagnetic valve 231 and a first check valve 232 are provided between the cold water pump 228 and the second cold water test port 204, and a hot water pump 229 is provided in the second hot water pipeline. A fourth electromagnetic valve 233 and a fourth one-way valve 234 are arranged between the hot water pump 229 and the second hot water test port 203, and the cold water auxiliary pipeline is provided with a cold water auxiliary pump 230, and the cold water auxiliary pump 230 is connected to the second cold water test port 204. A second solenoid valve 235 and a second one-way valve 236 are provided between them, and a third solenoid valve 237 and a third one-way valve 238 are provided between the cold water auxiliary pipeline 230 and the second hot water test port 203 to adjust the cold water pipe The opening degree of the electric regulating valve 243 in the cold water pipeline and the hot water pipeline makes the pressure of the cold water pipeline and the hot water pipeline meet the test requirements. Adjust the opening of the electric regulating valve 241 in the auxiliary cold water pipeline, and adjust the pressure of the auxiliary cold water pipeline to meet the test requirements. In this way, the inlet pressure of the cold and hot water ends of the two working conditions can be pre-adjusted according to the requirements of the life test of alternating water replacement, and the opening and closing of the solenoid valve can be controlled during the test to meet the relevant test requirements. 242 among the figure is the solenoid valve in the cold water auxiliary pipeline.

被测水嘴244如图所示安装,其热水进水口与热水测试口203连接,冷水进水口与冷水测试口204连接,出口与流量测试口208连接,水嘴控制把手与软轴连224接,采用软轴联接方式,安装使用方便。The tested faucet 244 is installed as shown in the figure, its hot water inlet is connected with the hot water test port 203, the cold water inlet is connected with the cold water test port 204, the outlet is connected with the flow test port 208, and the faucet control handle is connected with the flexible shaft. 224 connection, using flexible shaft connection, easy to install and use.

数据处理及控制单元7包括可编程控制器PLC和计算机,用于测量数据采集处理及电磁阀,电动调节阀等的控制。上述综合测试台和寿命测试台上每个传感器(流量、压力、温度、扭矩等)的测量信号均通过各个显示仪(流量显示仪、压力显示仪、温度显示仪、扭矩显示仪等)显示,这些测量信号送入数据处理及控制单元,经过仪表变送或通过PLC采集模块输入计算机,计算机将相关的测量数据进行记录、储存及打印输出。The data processing and control unit 7 includes a programmable controller PLC and a computer, which are used for acquisition and processing of measurement data and control of solenoid valves and electric regulating valves. The measurement signal of each sensor (flow rate, pressure, temperature, torque, etc.) These measurement signals are sent to the data processing and control unit, transmitted by the instrument or input into the computer through the PLC acquisition module, and the computer records, stores and prints out the relevant measurement data.

Claims (10)

1.温控水嘴产品检测装置,包括综合测试台和寿命测试台,其特征在于综合测试台上设有第一冷热水性能测试单元,扭矩测试单元和试压单元,寿命测试台上设有第二冷热水性能测试单元,上述单元还与数据处理及控制单元连接。1. Temperature-controlled faucet product testing device, including a comprehensive test bench and a life test bench, which is characterized in that the first cold and hot water performance test unit, torque test unit and pressure test unit are installed on the comprehensive test bench, and the life test bench is equipped with There is a second cold and hot water performance testing unit, and the above-mentioned unit is also connected with the data processing and control unit. 2.如权利要求1所述的温控水嘴产品检测装置,其特征在于综合测试台包括第一冷热水性能测试单元,第一冷热水性能测试单元包括第一热水箱和第一冷水箱,第一热水箱和第一冷水箱均设有温度控制装置,第一热水箱通过和第一热水管路与第一热水测试口连接,第一冷水箱通过第一冷水管路与第一冷水测试口连接,第一流量测试口通过第一混合水回水管道分别与第一热水箱和第一冷水箱连接,第一流量测试口设有第一压力传感器、第一流量传感器和第一温度传感器,第一压力传感器与第一压力显示仪连接,第一流量传感器与第一流量显示仪连接,第一温度传感器与第一温度显示仪连接;第一冷水测试口设有第二温度传感器和第二压力传感器,第二压力传感器与第二压力显示仪连接,第二温度传感器与第二温度显示仪连接;第一热水测试口前端还设有第三温度传感器和第三压力传感器,第三压力传感器与第三压力显示仪连接,第三温度传感器与第三温度显示仪连接。2. The temperature control faucet product testing device according to claim 1, characterized in that the comprehensive test bench includes a first cold and hot water performance test unit, and the first cold and hot water performance test unit includes a first hot water tank and a first The cold water tank, the first hot water tank and the first cold water tank are all equipped with temperature control devices, the first hot water tank is connected to the first hot water test port through the first hot water pipeline, and the first cold water tank is passed through the first cold water The pipeline is connected to the first cold water test port, and the first flow test port is respectively connected to the first hot water tank and the first cold water tank through the first mixed water return pipe. The first flow test port is provided with a first pressure sensor, a second A flow sensor and a first temperature sensor, the first pressure sensor is connected to the first pressure display, the first flow sensor is connected to the first flow display, the first temperature sensor is connected to the first temperature display; the first cold water test port A second temperature sensor and a second pressure sensor are provided, the second pressure sensor is connected to the second pressure display, and the second temperature sensor is connected to the second temperature display; the front end of the first hot water test port is also provided with a third temperature sensor And the third pressure sensor, the third pressure sensor is connected with the third pressure display instrument, and the third temperature sensor is connected with the third temperature display instrument. 3.如权利要求2所述的温控水嘴产品检测装置,其特征在于第一热水箱和第一冷水箱之间连接有平衡管,第一混合水回水管道通过平衡管与第一热水箱及第一冷水箱连接。 3. The temperature control faucet product detection device according to claim 2, characterized in that a balance pipe is connected between the first hot water tank and the first cold water tank, and the first mixed water return pipe passes through the balance pipe and the first The hot water tank and the first cold water tank are connected. the 4.如权利要求3所述的温控水嘴产品检测装置,其特征在于第一混合水回流管道还通过第二流量传感器与流量测试混合水出口连接,第二流量传感器与第二流量显示仪连接。4. The temperature control faucet product detection device as claimed in claim 3, characterized in that the first mixed water return pipeline is also connected to the flow test mixed water outlet through the second flow sensor, and the second flow sensor is connected to the second flow indicator connect. 5.如权利要求3所述的温控水嘴产品检测装置,其特征在于第一混合水回流管道通过一个常开电磁阀和一个常闭采集电磁阀与计量出口连接,计量出口下方设有量杯,量杯放置在电子天平上。5. The temperature control faucet product detection device as claimed in claim 3, characterized in that the first mixed water return pipe is connected to the metering outlet through a normally open solenoid valve and a normally closed collection solenoid valve, and a measuring cup is arranged below the metering outlet , the measuring cup is placed on the electronic balance. 6.如权利要求2所述的温控水嘴产品检测装置,其特征在于扭矩测试单元包括夹持套,夹持套通过柔性连接轴与扭矩输出轴连接,扭矩输出轴通过扭矩传感器与蜗轮连接轴连接,扭矩传感器与扭矩显示仪连接,蜗轮连接轴与蜗轮连接,蜗轮与蜗杆啮合连接,蜗杆与手轮连接。6. The temperature control faucet product testing device according to claim 2, characterized in that the torque testing unit includes a clamping sleeve, the clamping sleeve is connected to the torque output shaft through a flexible connection shaft, and the torque output shaft is connected to the worm gear through a torque sensor The shaft is connected, the torque sensor is connected with the torque display, the worm gear is connected, the shaft is connected with the worm gear, the worm gear is meshed with the worm, and the worm is connected with the hand wheel. 7.如权利要求1所述的温控水嘴产品检测装置,其特征在于试压单元包括水箱,水箱与电动试压泵的输入端连接,电动试压泵的输出端与试压接口连接,试压接口设有压力传感器,压力传感器与压力显示仪连接,电动试压泵的输出端还通过电动调节阀与水箱连接,回水接口与水箱连接。7. The temperature-controlled faucet product detection device according to claim 1, wherein the pressure test unit includes a water tank, the water tank is connected to the input end of the electric pressure test pump, and the output end of the electric pressure test pump is connected to the pressure test interface, The pressure test interface is provided with a pressure sensor, the pressure sensor is connected to the pressure display, the output end of the electric pressure test pump is also connected to the water tank through the electric regulating valve, and the return water interface is connected to the water tank. 8.如权利要求1所述的温控水嘴产品检测装置,其特征在于寿命测试台包括第二冷热水性能测试单元,第二冷热水性能测试单元包括第二热水箱和第二冷水箱,第二热水箱和第二冷水箱均设有温度控制装置,第二热水箱通过和第二热水管路与第二热水测试口连接,第二冷水箱通过第二冷水管路与第二冷水测试口连接,第二冷水箱还通过冷水辅助管路分别与第二热水测试口和第二冷水测试口连接,第二流量测试口通过第二混合水回水管道分别与第二热水箱和第二冷水箱连接,第二流量测试口设有第四压力传感器、第四流量传感器和第四温度传感器,第四压力传感器与第四压力显示仪连 接,第四流量传感器与第四流量显示仪连接,第四温度传感器与第四温度显示仪连接;第二冷水测试口设有第五温度传感器和第五压力传感器,第五压力传感器与第五压力显示仪连接,第二温度传感器与第五温度显示仪连接;第二热水测试口前端还设有第六温度传感器和第六压力传感器,第六压力传感器与第六压力显示仪连接,第六温度传感器与第六温度显示仪连接,扭矩试验软轴与步进电机连接,步进电机和驱动装置连接。8. The temperature control faucet product testing device as claimed in claim 1, characterized in that the life test bench includes a second cold and hot water performance testing unit, and the second cold and hot water performance testing unit includes a second hot water tank and a second The cold water tank, the second hot water tank and the second cold water tank are all equipped with temperature control devices, the second hot water tank is connected to the second hot water test port through the second hot water pipeline, and the second cold water tank is passed through the second cold water The pipeline is connected to the second cold water test port, and the second cold water tank is also connected to the second hot water test port and the second cold water test port respectively through the cold water auxiliary pipeline, and the second flow test port is respectively connected to the second mixed water return pipe. It is connected with the second hot water tank and the second cold water tank, the second flow test port is provided with a fourth pressure sensor, a fourth flow sensor and a fourth temperature sensor, the fourth pressure sensor is connected with the fourth pressure display, and the fourth The flow sensor is connected to the fourth flow indicator, the fourth temperature sensor is connected to the fourth temperature indicator; the second cold water test port is provided with a fifth temperature sensor and a fifth pressure sensor, and the fifth pressure sensor is connected to the fifth pressure indicator , the second temperature sensor is connected with the fifth temperature display instrument; the front end of the second hot water test port is also provided with a sixth temperature sensor and a sixth pressure sensor, the sixth pressure sensor is connected with the sixth pressure display instrument, and the sixth temperature sensor is connected with the sixth pressure display instrument. The sixth temperature indicator is connected, the torque test flexible shaft is connected with the stepper motor, and the stepper motor is connected with the driving device. 9.如权利要求8所述的温控水嘴产品检测装置,其特征在于其中第二热水箱和第二冷水箱之间连接有平衡管,第二混合水回水管道通过平衡管与第二热水箱及第二冷水箱连接。9. The temperature control faucet product detection device as claimed in claim 8, characterized in that a balance pipe is connected between the second hot water tank and the second cold water tank, and the second mixed water return pipe passes through the balance pipe and the first The second hot water tank and the second cold water tank are connected. 10.如权利要求8所述的温控水嘴产品检测装置,其特征在于第二冷水管路设有冷水泵,冷水泵和第二冷水测试口之间设有第一电动调节阀和第一单向阀,第二热水管路设有热水泵,热水泵和第二热水测试口之间设有第四电动调节阀和第四单向阀,冷水辅助管路设有冷水辅助泵,冷水辅助泵与第二冷水测试口之间设有第二电动调节阀和第二单向阀,冷水辅助管路与第二热水测试口之间设有第三电动调节阀和第三单向阀。 10. The temperature-controlled faucet product testing device according to claim 8, characterized in that the second cold water pipeline is provided with a cold water pump, and a first electric regulating valve and a first electric regulating valve are arranged between the cold water pump and the second cold water test port. One-way valve, the second hot water pipeline is equipped with a hot water pump, the fourth electric regulating valve and the fourth one-way valve are installed between the hot water pump and the second hot water test port, the cold water auxiliary pipeline is equipped with a cold water auxiliary pump, A second electric regulating valve and a second one-way valve are set between the cold water auxiliary pump and the second cold water test port, and a third electric regulating valve and a third one-way valve are set between the cold water auxiliary pipeline and the second hot water test port valve. the
CN201020109895XU 2010-02-08 2010-02-08 Detection device for temperature control water faucet Expired - Fee Related CN201707219U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020109895XU CN201707219U (en) 2010-02-08 2010-02-08 Detection device for temperature control water faucet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020109895XU CN201707219U (en) 2010-02-08 2010-02-08 Detection device for temperature control water faucet

Publications (1)

Publication Number Publication Date
CN201707219U true CN201707219U (en) 2011-01-12

Family

ID=43444380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020109895XU Expired - Fee Related CN201707219U (en) 2010-02-08 2010-02-08 Detection device for temperature control water faucet

Country Status (1)

Country Link
CN (1) CN201707219U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104198178A (en) * 2014-09-18 2014-12-10 上海建科检验有限公司 Water nozzle sensitivity test device
CN104198177A (en) * 2014-09-18 2014-12-10 上海建科检验有限公司 Test system for multiple performances of water nozzle
CN106872110A (en) * 2017-03-30 2017-06-20 浙江安胜科技股份有限公司 A kind of U-shaped wire loop protects circulating automatic survey water dispenser
CN107702858A (en) * 2017-11-21 2018-02-16 鹤山市金汇五金卫浴实业有限公司 A kind of leak-checking apparatus
CN109060327A (en) * 2018-07-27 2018-12-21 珠海市盛西源机电设备有限公司 Hot and cold water alternately testing machine
CN109596271A (en) * 2019-01-17 2019-04-09 上海出入境检验检疫局工业品与原材料检测技术中心 A kind of system for the close test of packing container constant temperature liquid
CN113063583A (en) * 2021-05-13 2021-07-02 南京市产品质量监督检验院 Intelligent automatic water changing equipment for detecting water nozzle metal pollutant precipitation project
CN113776809A (en) * 2021-10-09 2021-12-10 中国标准化研究院 A method and system for measuring the flow uniformity of a faucet
CN114719431A (en) * 2022-03-09 2022-07-08 中国国检测试控股集团陕西有限公司 Constant-speed heating device and heating method
CN115248115A (en) * 2021-04-28 2022-10-28 芜湖美的厨卫电器制造有限公司 Thermostatic valve detection device, thermostatic valve detection method and readable storage medium

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104198178A (en) * 2014-09-18 2014-12-10 上海建科检验有限公司 Water nozzle sensitivity test device
CN104198177A (en) * 2014-09-18 2014-12-10 上海建科检验有限公司 Test system for multiple performances of water nozzle
CN106872110A (en) * 2017-03-30 2017-06-20 浙江安胜科技股份有限公司 A kind of U-shaped wire loop protects circulating automatic survey water dispenser
CN106872110B (en) * 2017-03-30 2023-03-21 浙江安胜科技股份有限公司 Automatic water machine of surveying of U molded lines environmental protection circulation
CN107702858A (en) * 2017-11-21 2018-02-16 鹤山市金汇五金卫浴实业有限公司 A kind of leak-checking apparatus
CN109060327A (en) * 2018-07-27 2018-12-21 珠海市盛西源机电设备有限公司 Hot and cold water alternately testing machine
CN109596271A (en) * 2019-01-17 2019-04-09 上海出入境检验检疫局工业品与原材料检测技术中心 A kind of system for the close test of packing container constant temperature liquid
CN109596271B (en) * 2019-01-17 2023-12-22 上海海关工业品与原材料检测技术中心 System for be used for packaging container constant temperature liquid-tight test
CN115248115A (en) * 2021-04-28 2022-10-28 芜湖美的厨卫电器制造有限公司 Thermostatic valve detection device, thermostatic valve detection method and readable storage medium
CN115248115B (en) * 2021-04-28 2025-08-08 芜湖美的厨卫电器制造有限公司 Detection device for thermostatic valve, detection method for thermostatic valve and readable storage medium
CN113063583A (en) * 2021-05-13 2021-07-02 南京市产品质量监督检验院 Intelligent automatic water changing equipment for detecting water nozzle metal pollutant precipitation project
CN113776809A (en) * 2021-10-09 2021-12-10 中国标准化研究院 A method and system for measuring the flow uniformity of a faucet
CN114719431A (en) * 2022-03-09 2022-07-08 中国国检测试控股集团陕西有限公司 Constant-speed heating device and heating method
CN114719431B (en) * 2022-03-09 2023-08-18 中国国检测试控股集团陕西有限公司 Uniform temperature rise heating method

Similar Documents

Publication Publication Date Title
CN201707219U (en) Detection device for temperature control water faucet
CN112377487A (en) Hydraulic comprehensive test platform
CN102562563B (en) A hydraulic system of an energy-saving stepless pressure-regulating high-pressure pump performance test bench
CN101587027A (en) System for testing heat-transfer performance of gas-water-oil heat interchanger
CN108776025B (en) Thermal management system test platform of electric drive system
RU182400U1 (en) TEST STAND
CN104481971B (en) Torque-type hydraulic pump and hydraulic motor power recovery test platform
CN201732299U (en) Automatic flow control device
CN103631287B (en) A kind of lubricating oil external circuiting temperature control equipment for wheel box
CN116335929A (en) A performance test system for an internal combustion engine gearbox oil pump
CN201731993U (en) Hydraulic control system for performance test of CVT valve body
CN208734420U (en) Coolant temperature control system for engine decomposition friction work test
CN106053071A (en) Aeroengine high-speed bearing high and low-temperature lubrication test apparatus and control method
CN106092589B (en) A kind of engine cold-start load testing machine and method
CN103775436B (en) The parallel hydraulic pump of modular and the energy-conservation reliability test of hydraulic motor multimachine
CN207894593U (en) A kind of multi-way valve pressure-resistant test system
CN102878704A (en) Detection and control system of solar collector
CN205843960U (en) A kind of aero-engine high-speed bearing high/low temperature lubrication test device
CN203413834U (en) Constant temperature circulating water supply system with cold and hot water impulse test function
CN207816871U (en) Ground geo-thermal response test instrument
CN204043940U (en) A kind of radiator cold thermal cycling test system
CN206410857U (en) Hot and cold water circulation testing machine
CN101832880A (en) Locating device in constant temperature water mixing valve testing machine
CN104454119A (en) Constant-temperature control device for engine cooling liquid and control method of constant-temperature control device
CN204478551U (en) Solar water heating system multifunctional test device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110112

Termination date: 20150208

EXPY Termination of patent right or utility model