CN201694736U - Claw hook type hanger of steelmaking slag pot - Google Patents

Claw hook type hanger of steelmaking slag pot Download PDF

Info

Publication number
CN201694736U
CN201694736U CN2010202282940U CN201020228294U CN201694736U CN 201694736 U CN201694736 U CN 201694736U CN 2010202282940 U CN2010202282940 U CN 2010202282940U CN 201020228294 U CN201020228294 U CN 201020228294U CN 201694736 U CN201694736 U CN 201694736U
Authority
CN
China
Prior art keywords
hinged
lock
conical surface
upper beam
disc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202282940U
Other languages
Chinese (zh)
Inventor
刘静源
谭亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanxing Science & Technology Development Co Ltd Loudi City
Original Assignee
Sanxing Science & Technology Development Co Ltd Loudi City
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanxing Science & Technology Development Co Ltd Loudi City filed Critical Sanxing Science & Technology Development Co Ltd Loudi City
Priority to CN2010202282940U priority Critical patent/CN201694736U/en
Application granted granted Critical
Publication of CN201694736U publication Critical patent/CN201694736U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

Disclosed is a claw hook type hanger of a steelmaking slag pot. A center column is fixed at the center of a lower beam, the upper portion of the center column penetrates into a central through hole of an upper beam, a supporting frame and a supporting shaft are fixedly mounted above the upper beam, a hanging plate is sleeved on the supporting shaft, the lower portion of the center column is sleeved with a movable slide disc with upper and lower conical surfaces, a lock disc with inner and outer conical surfaces, which is located above the movable slide disc, is fixed on the center column via a pin shaft, conical degree of the upper conical surface of the movable slide disc is identical to that of the inner conical surface of the lock disc, diameters of bottom circles of the movable slide disc and the lock disc are identical, the middle of the lower side of the upper beam is hinged with two lock hooks with lower ends provided with hooks through pin shafts, a counter weight is arranged on the outer side of each lock hook, middles of four corner-shaped clamp legs are respectively hinged to two ends of each of front and rear side beams of the lower beam via pin shafts, the lower end of each clamp leg is hinged with a hook clamp plate, the lower end of a chain plate is hinged to the upper ends of the clamp legs, the upper end of the chain plate is hinged to the outer end of the lower side of the upper beam, and weight blocks are disposed on the upper portions of the clamp legs. The steelmaking slag pot can be assembled, disassembled automatically and hoisted, thereby not only increasing work efficiency and safety factors, but also reducing labor intensity of workers.

Description

Steel-making slag basin grapple formula suspender
Technical field
The crane accessory device that handling steel-making slag basin is used in a kind of steel industry.
Background technology
Steel industry often needs handling steel-making slag basin in smelting.The lifting to steel-making slag basin at present is still manual mode of operation, and promptly the operative employee is at first hooked the hook on four iron chains respectively four hanging holes on the steel-making slag basin, carries out handling with sling iron chains and steel-making slag basin of crane then.After handling puts in place, will link up with in steel-making slag basin hanging hole with manual method again and take off.This mode requires workman's close contact steel-making slag basin, and the workman is operated in temperature height, the dusty harsh environment, adds that labour intensity is big, and safety factor is low, threatens seriously that the workman's is healthy.There is the low defective of efficiency in addition.
Summary of the invention
The purpose of this utility model provides a kind of steel-making slag basin grapple formula suspender, accomplishes that folder hangs steel-making slag basin automatically, improves work efficiency, alleviates labor strength, improves working conditions.
Technical scheme is to be double-tee underbeam central authorities to be fixed with center mast, and center mast top is set in the upper beam center through hole, and the top of putting the beams in place is fixed with two bearing supports, between two bearing support tops bolster is housed, and the boatswain chair with lifting hole(eyelet) is enclosed within on the bolster; The center mast bottom is with up and down, and shape all is the movable sliding plate of the conical surface, the inside and outside shape that is positioned at movable sliding plate top all is that the lock collar of the conical surface is fixed on the center mast with bearing pin, the tapering of the conical surface and lock collar inner conical surface is identical and end circular diameter is the same on the movable sliding plate, middle side part is hinged with the latch hook of two lower end buckles under putting the beams in place by lock shaft, there is gravity block in the latch hook outside, four turning clevis midlegs respectively with bearing pin be hinged on underbeam before, on the back side bar two ends, the lower end of each leg lock is hinged with the hook clamping plate, the Chain plate lower end is hinged on the leg lock upper end, the Chain plate upper end is hinged on place, upper beam downside outer end, and the weightening finish stone roller is arranged at leg lock top.
Principle of work and using method are as follows: grasp steel-making slag basin if desired, hoist lifting hook at first descends the underbeam of general who has surrendered's suspender to be placed on the steel-making slag basin; Continue then to descend, because the action of gravity of suspender top self gravitation and gravity block, weight steelyard weight, latch hook is moved down into and slides to its conical surface down on the movable sliding plate behind the conical surface again, and four leg lock are opened, and is in and treats clamp position.Sling when crane and to put the beams in place when moving up, latch hook moves up thereupon.Latch hook elder generation drive activity sliding plate moves up along center mast, and is when movable sliding plate moves to and contacts with lock collar, no longer mobile.This moment, latch hook continued to move up along the conical surface under the movable sliding plate.Since on the movable sliding plate conical surface fit fully with the lock collar inner conical surface and outside dimensions the same, so latch hook will slip away the activity sliding plate and on move on on the lock collar male cone (strobilus masculinus), movable sliding plate then is slipped to the center mast bottom automatically and locates.At this moment crane continue to sling put the beams in place and latch hook along moving on the center mast, drive four leg lock toward intrinsic deflection by four Chain plates, four hook clamping plate then clamp and hook makes steel the slag basin, the slag basin of will making steel is sling.
When crane was walked steel-making slag basin stowed location, hoist lifting hook descended steel-making slag basin is fallen on the stowed location; When suspension hook continues to descend, because the action of gravity of suspender top self gravitation and gravity block, weight steelyard weight, upper beam moves down, and the latch hook of upper beam downside moves down between lock collar and the movable sliding plate along center mast, this moment, four leg lock were opened to extrinsic deflection, and four hook clamping plate unclamp from steel-making slag basin.If at this moment crane is sling to put the beams in place and moved up, latch hook will hook the lower end of lock collar so, make four leg lock keep open configuration and along with moving on the suspension hook, thereby make whole suspender leave steel-making slag basin, finish and unload the basin action.
Compared with the prior art, characteristics of the present utility model are automatic loading and unloading and handling steel-making slag basins, can operation under the big environment of high temperature, dust, both increased work efficiency and safety factor, and alleviate labor strength again, ensure that conscientiously the workman's is healthy.
Description of drawings
Fig. 1 is a steel-making slag basin grapple formula suspender master TV structure scheme drawing, and 10 are the steel-making slag pan among the figure.
Fig. 2 is a steel-making slag basin grapple formula suspender left side TV structure scheme drawing.
The specific embodiment
As shown in the figure, be double-tee underbeam 3 central authorities and be fixed with center mast 9, center mast 9 tops are set in 5 center through hole of putting the beams in place, and 5 tops of putting the beams in place are fixed with two bearing supports 51, between two bearing support 51 tops bolster 52 is housed, the boatswain chair 54 with lifting hole(eyelet) 53 is enclosed within on the bolster 52; Center mast 9 bottoms are with up and down, and shape all is the movable sliding plate 8 of the conical surface, the inside and outside shape that is positioned at movable sliding plate 8 tops all is that the lock collar 7 usefulness bearing pins of the conical surface are fixed on the center mast 9, the tapering of the conical surface and lock collar 7 inner conical surfaces is identical and end circular diameter is the same on the movable sliding plate 8, the 5 times middle side parts of putting the beams in place are hinged with the latch hook of two lower end buckles by bearing pin, there is gravity block in the pin hook outside, the middle part of four turning clevis pin 2 respectively with bearing pin be hinged on underbeam 3 before, on the back side bar two ends, the lower end of each leg lock is hinged with hook clamping plate 1, Chain plate 4 lower ends are hinged on leg lock 2 upper ends, Chain plate 4 upper ends are hinged on the place, 5 downside outer ends of putting the beams in place, and weightening finish stone roller 21 is arranged at leg lock 2 tops.

Claims (1)

1. steel-making slag basin grapple formula suspender, it is characterized in that being double-tee underbeam (3) central authorities and be fixed with center mast (9), center mast (9) top is set in upper beam (5) center through hole, upper beam (5) top is fixed with two bearing supports (51), two bearing supports (51) are equipped with bolster (52) between the top, and the boatswain chair (54) with lifting hole(eyelet) (53) is enclosed within on the bolster (52); Center mast (9) bottom is with up and down, and shape all is the movable sliding plate (8) of the conical surface, the inside and outside shape that is positioned at movable sliding plate (8) top all is that the lock collar (7) of the conical surface is fixed on the center mast (9) with bearing pin, it is identical and end circular diameter is the same that movable sliding plate (8) is gone up the tapering of the conical surface and lock collar (7) inner conical surface, middle side part is hinged with the latch hook (6) of two lower end buckles under the upper beam (5) by bearing pin, there is gravity block (61) in latch hook (6) outside, the middle part of four turning clevis legs (2) respectively with bearing pin be hinged on underbeam (3) before, on the back side bar two ends, the lower end of each leg lock (2) is hinged with hook clamping plate (1), Chain plate (4) lower end is hinged on leg lock (2) upper end, Chain plate (4) upper end is hinged on place, upper beam (5) downside outer end, and weightening finish stone roller (21) is arranged at leg lock (2) top.
CN2010202282940U 2010-06-12 2010-06-12 Claw hook type hanger of steelmaking slag pot Expired - Fee Related CN201694736U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202282940U CN201694736U (en) 2010-06-12 2010-06-12 Claw hook type hanger of steelmaking slag pot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202282940U CN201694736U (en) 2010-06-12 2010-06-12 Claw hook type hanger of steelmaking slag pot

Publications (1)

Publication Number Publication Date
CN201694736U true CN201694736U (en) 2011-01-05

Family

ID=43395978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202282940U Expired - Fee Related CN201694736U (en) 2010-06-12 2010-06-12 Claw hook type hanger of steelmaking slag pot

Country Status (1)

Country Link
CN (1) CN201694736U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106477450A (en) * 2015-08-26 2017-03-08 有研半导体材料有限公司 A kind of for hanging the device taking major diameter single crystal silicon rod
CN112061970A (en) * 2020-09-07 2020-12-11 中国航发北京航空材料研究院 Special lifting appliance for vertically centering and lifting cylindrical materials in deep-hole crucible

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106477450A (en) * 2015-08-26 2017-03-08 有研半导体材料有限公司 A kind of for hanging the device taking major diameter single crystal silicon rod
CN106477450B (en) * 2015-08-26 2018-11-30 有研半导体材料有限公司 A kind of device for hanged major diameter single crystal silicon rod
CN112061970A (en) * 2020-09-07 2020-12-11 中国航发北京航空材料研究院 Special lifting appliance for vertically centering and lifting cylindrical materials in deep-hole crucible
CN112061970B (en) * 2020-09-07 2022-08-09 中国航发北京航空材料研究院 Special lifting appliance for vertically centering and lifting cylindrical materials in deep-hole crucible

Similar Documents

Publication Publication Date Title
CN101020558A (en) Wheel excircle sling and its hoisting method
CN205419526U (en) Anchor clamps that lift by crane, overturn of slewing bearing annular work piece
CN103569872B (en) Stone material dimension board row panel assembly
CN202465022U (en) Hoisting tool
CN201694736U (en) Claw hook type hanger of steelmaking slag pot
CN202988558U (en) Multi-purpose furnace burden plate hanger device
CN202156871U (en) Lifting appliance capable of unhooking automatically
CN202481894U (en) Hoisting tool for large-scale rings
CN2799494Y (en) Slings for freezing loads
CN216072681U (en) Hoisting device of mechanical equipment
CN216512439U (en) A lifting device for special glass annealing operation
CN110642143A (en) Gravity type self-discharging lifting hook and use method thereof
CN2597442Y (en) Automatic sling for slag pot
CN201010426Y (en) Special suspending device for T-type platform suspending construction
CN203345919U (en) Lifting tool for lifting multiple ring pieces
CN103350948A (en) Lifting appliance for lifting plurality of ring pieces
CN101455224B (en) Yak hoisting automatic orbiting device
CN210558848U (en) Automatic unhooking device for hanging basket
CN205616437U (en) Device of a hoist and mount graphite heat preservation section of thick bamboo
CN204958167U (en) Mantle lifting device
CN209721353U (en) A kind of annealing material frame transfer suspender of safe and convenient
CN109775578A (en) A kind of gravity mechanical arm
CN219567298U (en) Automatic hooking and unhooking device for sucker traveling crane
CN201010423Y (en) Suspending device of belt straight arm type excavator
CN215558673U (en) Mechanism is placed to lifting rope utensil that building engineering used

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110105

Termination date: 20120612