CN201685094U - Megawatt-class wind generating set dome locating assembly tool - Google Patents

Megawatt-class wind generating set dome locating assembly tool Download PDF

Info

Publication number
CN201685094U
CN201685094U CN2010201703139U CN201020170313U CN201685094U CN 201685094 U CN201685094 U CN 201685094U CN 2010201703139 U CN2010201703139 U CN 2010201703139U CN 201020170313 U CN201020170313 U CN 201020170313U CN 201685094 U CN201685094 U CN 201685094U
Authority
CN
China
Prior art keywords
megawatt
class wind
generating set
wind generating
lifting disk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201703139U
Other languages
Chinese (zh)
Inventor
张雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Envision Energy Jiangsu Co Ltd
Original Assignee
YUANJIAN WIND POWER (JIANGYIN) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUANJIAN WIND POWER (JIANGYIN) CO Ltd filed Critical YUANJIAN WIND POWER (JIANGYIN) CO Ltd
Priority to CN2010201703139U priority Critical patent/CN201685094U/en
Application granted granted Critical
Publication of CN201685094U publication Critical patent/CN201685094U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model relates to a megawatt-class wind generating set dome locating assembly tool, which is used for concentrically assembling a megawatt-class wind generating set dome and a hub. The tool comprises a limit mandrel assembly (1) and a height adjusting bracket (2), wherein the limit mandrel assembly (1) comprises a locating rod (101), a locating sleeve (102) and a nut (103); the height adjusting bracket (2) comprises a base (201) and a lifting disk (202); the locating sleeve (102) is sleeved at one end of the locating rod (101); the nut (103) is sleeved at the other end of the locating rod (101); the base (201) is provided with a boss (204); the center of the boss (204) is provided with a screw hole; the bottom of the lifting disk (202) is provided with a threaded rod (205); the threaded rod (205) is screwed in the screw hole; and the outer side surface of the circumference of the lifting disk (202) is provided with a plurality of handles (203). The megawatt-class wind generating set dome locating assembly tool can be conveniently used for concentrically assembling the megawatt-class wind generating set dome and the hub.

Description

The location assembly tooling of MW class wind turbine group kuppe
(1) technical field
The utility model relates to a kind of kuppe location assembly tooling, is used for the concentric fits of MW class wind turbine group kuppe and wheel hub.
(2) background technology
The blower fan kuppe of MW class wind turbine group is contained in the wheel hub outer rim, and three blade peritremes of kuppe must be in concentric position with three bearing surfaces of wheel hub.Yet in assembling process, because kuppe adopts fiberglass to make, and volume is bigger, thereby rigidity is very poor, has brought no small trouble for assembling adjustment.
(3) summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, provides a kind of and can easily the MW class wind turbine group kuppe of MW class wind turbine group kuppe and wheel hub realization concentric fits be located assembly tooling.
The purpose of this utility model is achieved in that a kind of MW class wind turbine group kuppe location assembly tooling, described frock includes spacing arbor assembly and height regulating frame, described spacing arbor assembly includes backstay, positioning sleeve and nut, described height regulating frame includes base and lifting disk, described location condom is as for backstay one end, and described nut sleeve is as for the backstay other end; Described base is provided with a boss, and described boss center has a screw, and described lifting disk bottom is provided with a screw rod, and described screw rod is threaded in above-mentioned screw, and described lifting disk periphery face is provided with some handles.
Operation principle of the present utility model is:
During use, at first utilize three height regulating frames to hold kuppe, the earlier preliminary height regulating frame of adjusting makes three vane hole edges of kuppe and three blade bearing installed surfaces of wheel hub outer rim essentially concentric, insert 4 spacing arbor assemblies subsequently in the bolt hole on three blade bearing installed surfaces of wheel hub, as shown in Figure 3, regulate the positioning sleeve of spacing arbor assembly and the gap between the kuppe edge then, positioning sleeve until 4 spacing arbor assemblies all closely contacts with the kuppe edge, kuppe has promptly been realized concentric completely with wheel hub, the securing member of fastening all assemblings this moment can guarantee to have realized assembling under kuppe and the concentric situation of wheel hub.
The beneficial effects of the utility model are:
Utilize height regulating frame and spacing arbor assembly that kuppe is positioned assembling, time saving and energy saving, can regulate kuppe easily and make it concentric with wheel hub, guaranteed the quality of product.
(4) description of drawings
Fig. 1 is the spacing arbor assembly structural representation of the utility model.
Fig. 2 is the utility model height regulating frame structural representation.
Fig. 3 uses schematic diagram for the utility model.
Among the figure:
Spacing arbor assembly 1, backstay 101, positioning sleeve 102, nut 103, packing ring 104;
Height regulating frame 2, base 201, lifting disk 202, handle 203, boss 204, screw rod 205;
Wheel hub 3;
Kuppe 4.
(5) specific embodiment
Referring to Fig. 1 and Fig. 2, the utility model relates to a kind of MW class wind turbine group kuppe location assembly tooling, include spacing arbor assembly 1 and height regulating frame 2, described spacing arbor assembly 1 includes backstay 101, positioning sleeve 102 and nut 103, described height regulating frame 2 includes base 201 and lifting disk 202, described positioning sleeve 102 covers are as for backstay 101 1 ends, described nut 103 covers are as for backstay 101 other ends, described nut 103 is provided with a packing ring 104 near backstay 101 1 ends, and described packing ring 104 covers are as on the backstay 101; Described base 201 is provided with a boss 204, and described boss 204 centers have a screw, and described lifting disk 202 bottoms are provided with a screw rod 205, and described screw rod 205 is threaded in above-mentioned screw, and described lifting disk 202 periphery faces are provided with some handles 203.

Claims (1)

1. MW class wind turbine group kuppe location assembly tooling, it is characterized in that: described frock includes spacing arbor assembly (1) and height regulating frame (2), described spacing arbor assembly (1) includes backstay (101), positioning sleeve (102) and nut (103), described height regulating frame (2) includes base (201) and lifting disk (202), described positioning sleeve (102) cover is as for backstay (101) one ends, and described nut (103) overlaps as for backstay (101) other end; Described base (201) is provided with a boss (204), described boss (204) center has a screw, described lifting disk (202) bottom is provided with a screw rod (205), and described screw rod (205) is threaded in above-mentioned screw, and described lifting disk (202) periphery face is provided with some handles (203).
CN2010201703139U 2010-04-19 2010-04-19 Megawatt-class wind generating set dome locating assembly tool Expired - Lifetime CN201685094U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201703139U CN201685094U (en) 2010-04-19 2010-04-19 Megawatt-class wind generating set dome locating assembly tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201703139U CN201685094U (en) 2010-04-19 2010-04-19 Megawatt-class wind generating set dome locating assembly tool

Publications (1)

Publication Number Publication Date
CN201685094U true CN201685094U (en) 2010-12-29

Family

ID=43373383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201703139U Expired - Lifetime CN201685094U (en) 2010-04-19 2010-04-19 Megawatt-class wind generating set dome locating assembly tool

Country Status (1)

Country Link
CN (1) CN201685094U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103212983A (en) * 2013-05-08 2013-07-24 南车戚墅堰机车有限公司 Preassembling method of diesel generating set of internal combustion locomotive and preassembling positioning device used by same
CN104972300A (en) * 2015-06-29 2015-10-14 来安县新元机电设备设计有限公司 Generator shaft multi-accessory integrated assembling device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103212983A (en) * 2013-05-08 2013-07-24 南车戚墅堰机车有限公司 Preassembling method of diesel generating set of internal combustion locomotive and preassembling positioning device used by same
CN103212983B (en) * 2013-05-08 2015-07-15 南车戚墅堰机车有限公司 Preassembling method of diesel generating set of internal combustion locomotive and preassembling positioning device used by same
CN104972300A (en) * 2015-06-29 2015-10-14 来安县新元机电设备设计有限公司 Generator shaft multi-accessory integrated assembling device

Similar Documents

Publication Publication Date Title
CN203926126U (en) Nuclear power fan impeller
CN201685094U (en) Megawatt-class wind generating set dome locating assembly tool
CN203831148U (en) Adjustable and efficient tool flange for machining pump cover of IS pump
CN202045503U (en) Adjusting and supporting mechanism for foot margins of lathe
CN202270827U (en) Quick change structure device of rotor groove-shaped concave die in progressive die
CN102146881B (en) Intelligent flexible pitch-changing device for wind power generator
CN204403094U (en) A kind of novel pressing-riveting bolt assembly
CN201264232Y (en) Tool for dismounting blower fan impeller shaft
CN203526898U (en) Bearing installer of idler wheel
CN205614309U (en) Actuating arm bearing installation dismounting device
CN102689208A (en) Floatation supporting device
CN203461114U (en) Propeller and motor installation structure of agricultural four-shaft aircraft
CN202867505U (en) Quick nut
CN201991710U (en) Fixing device for central shaft of casing of electric generator and fan blade connecting rod
CN202403674U (en) Laser adjusting module
CN202922272U (en) Tool of large-scale wind power bearing quenching clamp side hole
CN204725421U (en) A kind of axle box moves back and unloads frock
CN203984317U (en) A kind of angle of solar cell panel adjustable support
CN203248401U (en) Wind wheel
CN203906175U (en) Moped generator fan blade
CN203266758U (en) Adjustable cutting machine
CN201988721U (en) Disc spring type adjustable flat constant force support
CN215170562U (en) Wind power bearing disassembling device
CN204277872U (en) A kind of adjustable type that rotates suspends assembling device
CN202607315U (en) Floating support device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ENVISION ENERGY (JIANGSU) CO., LTD.

Free format text: FORMER NAME: YUANJIAN WIND ENERGY (JIANGYIN) CO., LTD.

CP03 Change of name, title or address

Address after: 214443 Jiangsu province Jiangyin Shengang Street Shen Zhuang Road No. 3

Patentee after: Envision Energy (Jiangsu) Co., Ltd.

Address before: 214433 room C601, No. 159 middle Chengjiang Road, Jiangyin, Jiangsu

Patentee before: Yuanjian Wind Power (Jiangyin) Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20101229