CN201678479U - Coking plant waste water treatment defoaming system - Google Patents

Coking plant waste water treatment defoaming system Download PDF

Info

Publication number
CN201678479U
CN201678479U CN2010201005029U CN201020100502U CN201678479U CN 201678479 U CN201678479 U CN 201678479U CN 2010201005029 U CN2010201005029 U CN 2010201005029U CN 201020100502 U CN201020100502 U CN 201020100502U CN 201678479 U CN201678479 U CN 201678479U
Authority
CN
China
Prior art keywords
water
froth breaking
coking plant
waste water
handled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201005029U
Other languages
Chinese (zh)
Inventor
王晓龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Iron and Steel Co Ltd
Original Assignee
Chongqing Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Iron and Steel Group Co Ltd filed Critical Chongqing Iron and Steel Group Co Ltd
Priority to CN2010201005029U priority Critical patent/CN201678479U/en
Application granted granted Critical
Publication of CN201678479U publication Critical patent/CN201678479U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a coking plant waste water treatment defoaming system which comprises a defoaming water pipe and a defoaming water nozzle communicated with the defoaming water pipe; the defoaming water nozzle is a straight pipe nozzle with an upward opening, and a reflection baffle is arranged over against the straight pipe nozzle; as the straight pipe nozzle with the upward opening is adopted and the baffle is arranged on the opening, the sprayed water is dispersed to the waste water, less quantity of clean water is used to defoam the waste water; thereby, the number of nozzles in unit area is reduced due to the increased spraying area, the use and maintenance cost is saved and the energy consumption is reduced.

Description

Coking Plant Wastewater is handled the froth breaking system
Technical field
The utility model relates to a kind of supplementary unit of Coking Plant Wastewater treatment unit, and particularly a kind of Coking Plant Wastewater is handled the froth breaking system.
Background technology
The coke-oven plant is the raw material supply department of iron and steel enterprise.Coking can produce a large amount of waste water, as not handling, then can pollute environment, and process water is run off in a large number, causes the waste of production cost.
In the prior art, generally adopt biotechnology that coking chemical waste water is handled, processed waste water is discharged after reaching emission standard, avoids coking chemical waste water that environment is polluted, but the water after handling directly discharges the rising that causes the service water cost.At above technical problem, at the water outlet of processed waste water back water pump is set, water is recycled.
In process for the treatment of waste water, waste water can produce more foam in the pond, because the foamy existence can reduce the processing efficiency of waste water greatly.For solving bubble-related issues, when handling, can above the pond, spray water carry out froth breaking, so that waste water can be handled smoothly, improve the processing efficiency of waste water.In the prior art, froth breaking water directly is sprayed onto in the pond by the straight tube shower nozzle, and the sprinkling face of each shower nozzle is less, thereby needs to arrange that a large amount of shower nozzles just can reach the froth breaking purpose, wastes a large amount of water purification, increases the load of water treatment simultaneously, and power loss is also bigger; If adopt the spraying head type shower nozzle, then can increase equipment cost, simultaneously, the spraying head type shower nozzle stops up easily, not only reduces defoaming effectiveness, also increases the energy consumption of power-equipment.
Therefore, need transform, can enough less water yields reach the purpose of froth breaking, and reduce nozzle layout of sprinkler quantity, save the operation and maintenance cost of equipment, cut down the consumption of energy coke-oven plant wastewater treatment froth breaking system.
The utility model content
In view of this, the utility model provides a kind of Coking Plant Wastewater to handle the froth breaking system, can enough less water yields reach the purpose of froth breaking, and reduce nozzle layout of sprinkler quantity, saves the operation and maintenance cost of equipment, cuts down the consumption of energy.
Coking Plant Wastewater of the present utility model is handled the froth breaking system, comprise the froth breaking water pipe and with the froth breaking sprinkler head of froth breaking cross current, the straight tube shower nozzle that described froth breaking sprinkler head is a upward opening, with straight tube shower nozzle opening over against reflecting curtain is set.
Further, described reflecting curtain is horizontally disposed with;
Further, the spacing of described reflecting curtain lower surface and straight tube shower nozzle upward opening is 1-1.5cm;
Further, the water-in of described froth breaking water pipe forms froth breaking water branch road by the export pipeline that valve is communicated in the water treatment system back water pump.
The beneficial effects of the utility model: Coking Plant Wastewater of the present utility model is handled the froth breaking system, the straight tube shower nozzle that adopts opening to make progress, baffle plate is set on the opening, the water of ejection can be scattered distribute and enter waste water, the foam on more a spot of water purification elimination waste water can be used,, therefore unit surface nozzle layout of sprinkler quantity can be reduced because spray area enlarges, the operation and maintenance cost of saving equipment cuts down the consumption of energy.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further described.
Accompanying drawing is a structural representation of the present utility model.
Embodiment
Accompanying drawing is a structural representation of the present utility model, as shown in the figure: the Coking Plant Wastewater of present embodiment is handled the froth breaking system, comprise froth breaking water pipe 4 and the froth breaking sprinkler head that is communicated with froth breaking water pipe 4, the straight tube shower nozzle 2 that described froth breaking sprinkler head is a upward opening, with straight tube shower nozzle opening over against reflecting curtain 3 is set, as shown in the figure, the froth breaking system layout is in water treating pond 1 top.
In the present embodiment, described reflecting curtain 3 is horizontally disposed with; Being horizontally disposed with the water that baffle plate is beneficial to upwards ejection can shown in shower nozzle top arrow among the figure, reach the purpose of even froth breaking from evenly reflection on every side, is convenient to calculate the installation quantity and the decoration form of shower nozzle.
In the present embodiment, the spacing of described reflecting curtain 3 lower surfaces and straight tube shower nozzle 2 upward openings is 1-1.5cm; According to the general power of power water pump, and in conjunction with the best hydraulic pressure of valve control, this spacing can reach the best combination of energy consumption and froth breaking.
In the present embodiment, the water-in of described froth breaking water pipe 4 forms froth breaking water branch road by the export pipeline 6 that valve 5 is communicated in water treatment system back water pump 7; Special-purpose froth breaking water power pump be can remove, power and cost of labor saved.
Explanation is at last, above embodiment is only unrestricted in order to the explanation the technical solution of the utility model, although the utility model is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can make amendment or be equal to replacement the technical solution of the utility model, and not breaking away from the aim and the scope of technical solutions of the utility model, it all should be encompassed in the middle of the claim scope of the present utility model.

Claims (4)

1. a Coking Plant Wastewater is handled the froth breaking system, comprise the froth breaking water pipe and with the froth breaking sprinkler head of froth breaking cross current, it is characterized in that: the straight tube shower nozzle that described froth breaking sprinkler head is a upward opening, with straight tube shower nozzle opening over against reflecting curtain is set.
2. Coking Plant Wastewater according to claim 1 is handled the froth breaking system, and it is characterized in that: described reflecting curtain is horizontally disposed with.
3. Coking Plant Wastewater according to claim 2 is handled the froth breaking system, and it is characterized in that: the spacing of described reflecting curtain lower surface and straight tube shower nozzle upward opening is 1-1.5cm.
4. Coking Plant Wastewater according to claim 3 is handled the froth breaking system, it is characterized in that: the water-in of described froth breaking water pipe forms froth breaking water branch road by the export pipeline that valve is communicated in the water treatment system back water pump.
CN2010201005029U 2010-01-22 2010-01-22 Coking plant waste water treatment defoaming system Expired - Fee Related CN201678479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201005029U CN201678479U (en) 2010-01-22 2010-01-22 Coking plant waste water treatment defoaming system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201005029U CN201678479U (en) 2010-01-22 2010-01-22 Coking plant waste water treatment defoaming system

Publications (1)

Publication Number Publication Date
CN201678479U true CN201678479U (en) 2010-12-22

Family

ID=43343532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201005029U Expired - Fee Related CN201678479U (en) 2010-01-22 2010-01-22 Coking plant waste water treatment defoaming system

Country Status (1)

Country Link
CN (1) CN201678479U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102252966A (en) * 2011-04-21 2011-11-23 江苏奥迪康医学科技有限公司 Bubble eliminating structure for photometer of glycosylated hemoglobin analyzer
CN102774919A (en) * 2012-08-13 2012-11-14 江苏三环实业股份有限公司 Defoaming device for discharged-water spraying
CN104628070A (en) * 2015-02-09 2015-05-20 中蓝连海设计研究院 Defoaming system and method for coking wastewater treatment
CN111517401A (en) * 2020-05-14 2020-08-11 深圳市翰唐环保科技有限公司 Waste water treatment defoaming device and method
CN114763274A (en) * 2021-01-14 2022-07-19 中国石油化工股份有限公司 Defoaming device and defoaming method for biological fluidized bed reactor

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102252966A (en) * 2011-04-21 2011-11-23 江苏奥迪康医学科技有限公司 Bubble eliminating structure for photometer of glycosylated hemoglobin analyzer
CN102774919A (en) * 2012-08-13 2012-11-14 江苏三环实业股份有限公司 Defoaming device for discharged-water spraying
CN104628070A (en) * 2015-02-09 2015-05-20 中蓝连海设计研究院 Defoaming system and method for coking wastewater treatment
CN111517401A (en) * 2020-05-14 2020-08-11 深圳市翰唐环保科技有限公司 Waste water treatment defoaming device and method
CN114763274A (en) * 2021-01-14 2022-07-19 中国石油化工股份有限公司 Defoaming device and defoaming method for biological fluidized bed reactor

Similar Documents

Publication Publication Date Title
CN201678479U (en) Coking plant waste water treatment defoaming system
CN202061835U (en) Coating-pretreatment spraying equipment
CN204540272U (en) A kind of sheepfold with automatic flushing device
CN203140205U (en) Vertical mill grinding aid spraying device
CN207767492U (en) A kind of Novel fruit air bubble washer pond
CN203936491U (en) A kind of cooling water circulating device
CN203840889U (en) Three-dimensional vegetable aeroponic cultivation device
CN203944277U (en) Industrial organic exhaust gas integrated wastewater treatment plant
CN210559949U (en) Fixed water distribution system of biological filter
CN205323441U (en) A dust processing system for handling benzoylurea insecticides product
CN115385412A (en) Waste water evaporation system and method utilizing flue gas waste heat
CN205146511U (en) Spraying system with external filter
CN202232889U (en) Hot pepper cleaner
CN204824313U (en) Defoaming device is sprayed in biochemical pond of good oxygen
CN202229623U (en) Industrial waste gas afterheat utilization device
CN201825774U (en) Automatic defoaming device for sewage treatment biochemistry pool
CN202135548U (en) Water-saving sprinkling irrigation vehicle
CN201189504Y (en) Lacquer treatment system for lacquer spraying chamber
CN204973593U (en) Scrubbing tower with keep off and flow wall
CN104628070A (en) Defoaming system and method for coking wastewater treatment
CN220149362U (en) Improved foam reducing device for phenol-cyanogen wastewater aeration tank
CN218424439U (en) Strong brine recycling system
CN220597177U (en) High-efficiency ozone adding system for high-water-depth pre-ozone contact tank
CN203842446U (en) Harmless treatment device for industrial smoke pipe
CN203355519U (en) Flowing-water dust removing device for dust-free paint locker

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHONGQING IRON AND STEEL CO., LTD.

Free format text: FORMER OWNER: CHONGQING IRON + STEEL (GROUP) CO., LTD.

Effective date: 20120618

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 400080 DADUKOU, CHONGQING TO: 401258 CHANGSHOU, CHONGQING

TR01 Transfer of patent right

Effective date of registration: 20120618

Address after: No. 401258 Chongqing City Economic and Technological Development Zone, Changshou District Road

Patentee after: Chongqing Iron and Steel Co., Ltd.

Address before: Three village 400080 Dadukou District of Chongqing Dayan No. 1

Patentee before: Chongqing Iron & Steel (Group) Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101222

Termination date: 20140122