CN201674156U - Traction running board - Google Patents

Traction running board Download PDF

Info

Publication number
CN201674156U
CN201674156U CN2010201178210U CN201020117821U CN201674156U CN 201674156 U CN201674156 U CN 201674156U CN 2010201178210 U CN2010201178210 U CN 2010201178210U CN 201020117821 U CN201020117821 U CN 201020117821U CN 201674156 U CN201674156 U CN 201674156U
Authority
CN
China
Prior art keywords
limp
traction
pulley
running board
connecting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201178210U
Other languages
Chinese (zh)
Inventor
缪谦
温超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN2010201178210U priority Critical patent/CN201674156U/en
Application granted granted Critical
Publication of CN201674156U publication Critical patent/CN201674156U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Toys (AREA)

Abstract

The utility model relates to a traction running board, which comprises guide support beams, a guide pushing beam, a running board body, a traction rope connecting hole and a guide line connecting hole, wherein the traction rope connecting hole and the guide line connecting hole are connected on the running board, the guide support beams are placed under the running board body, and are positioned in the symmetrical position at both sides of an axle wire of the running board body, and the guide pushing beam is placed under the running board body and is positioned between the two guide support beams. Through the balance arrangement of the guide line connecting hole and the traction rope connecting hole along the traction running board, the load balance of the traction running board along the central axis when three guide lines are towed by a traction rope is ensured all the time, through the arrangement of the guide support beams and the guide pushing beam in the traction running board, the pulley moving device on a traveling trolley can be pushed when the traction running board passes through a pulley movable balanced load type line releasing traveling trolley, so the traction running board and the pulley movable balanced load type line releasing traveling trolley always maintain the load balance, phenomena of traction running board overturning and mutual winding of guide lines in construction are avoided, the in-site construction is convenient, and the construction efficiency is improved.

Description

A kind of traction limp
Technical field
The utility model belongs to overhead transmission line construction under tension stringing apparatus field, is specifically related to a kind of traction limp.
Background technology
± 800kV extra-high voltage direct-current demonstration project adopts six-multiple conductor, because conductor cross-section is big, existing hauling machine traction six conductors tractive effort is not enough, and therefore most of unit in charge of construction adopts " 2 * (one leads three) " exhibition to put mode (i.e. two hauling machines carry out " leads three " synchronously open up the mode of putting).Existing " one leads three " pulley block adopts five to take turns layout (4, four guide rollers of a wire rope pulley are symmetrically arranged in the wire rope pulley both sides), only uses wherein three guide rollers 7 during unwrapping wire, 5 balanced actions of surplus next pulley.Because wire rope pulley one side is arranged two leads, opposite side is arranged a lead, so the gravity of lead will cause releasing pulley stressed unbalance; Corresponding traction limp also is that a side is arranged two leads, and opposite side is arranged a lead, is subjected to force unbalance.Therefore general " one leads three " releasing pulley and traction limp are tilted easily, are overturn in the unfolding conductor process, bring very big difficulty to construction.
As shown in Figure 1, general " one leads three " of the prior art traction limp comprises pull rope connecting hole 1, limp body 2, wire connection hole 3, counterweight 4.When the tension stringing initial condition, pull rope connects the pull rope connecting hole 1 that draws limp by the wire rope pulley of releasing pulley, and the wire connection hole 3 of traction limp connects three leads; After tension stringing began, pull rope was along the wire rope pulley traction limp of releasing pulley, and three leads of traction limp traction are opened up forward and put; Along with unfolding conductor, pull rope and traction limp are by releasing pulley, and three leads continue exhibition along three lead pulleys of releasing pulley to be put, and finishes up to unfolding conductor.
Arrange three wire connection holes 3 on the limp body 2 of general " one leads three " traction limp, two are arranged in traction limp left side, the 3rd is arranged in the right side, so traction limp left side is stressed greater than the right side in the lead distraction procedure, and the traction limp is inclination flip to the left; Equally, be used " one leads three " releasing pulley of spreading conducting wire also to be provided with three lead pulleys with the traction limp, two are arranged in the releasing pulley left side, the 3rd is arranged in the releasing pulley right side, three leads are opened up forward when putting by three lead pulleys, the coaster left side is stressed greater than the right side, and coaster will overturn to the left.Existing general " one leads three " traction limp is to realize drawing the limp stress balance by adding a counterweight 4 in the afterbody center of limp body 2, even employing balance weight structure, it is still wayward to want that the releasing pulley that makes the traction limp and be mated use remains stress balance in the spreading conducting wire process, the upset of limp and coaster can appear usually, thereby cause lead to twine, can not continue exhibition and put; In addition, owing to increased counterweight, also improved the production cost of traction limp.
The utility model content
In order to overcome the defective of prior art, the utility model provides a kind of traction limp, and pulling equipment easily overturns the problem that lead twines mutually in the prior art in order to solve.
For this reason, the utility model provides a kind of traction limp, comprise the limp body, be connected pull rope connecting hole and wire connection hole in the limp, it is characterized in that: this limp comprises that also guiding brace summer and guiding promote beam, described guiding brace summer places the following of limp body and is positioned at the symmetric position of both sides, limp body axis, and described guiding promotion beam places the following of limp body and leads between the brace summer at two.
Preferred version of the present utility model is, be connected with a pull rope connecting hole and odd number wire connection hole in the described limp, described pull rope connecting hole be connected above the limp body and be positioned on the axis of limp body, each wire connection hole all is located at the afterbody side of limp body, in the described wire connection hole one with the pull rope connecting hole is located on the same axis, remaining wire connection hole is symmetrically distributed in limp body axis both sides.
Another preferred version of the present utility model is, described limp body is provided with two guiding and promotes beams, and described guiding promotes the match easement curve that is shaped as of beam.
A preferred version more of the present utility model is that the wheel groove shape of the shape of described guiding brace summer and guide roller adapts.
The beneficial effects of the utility model are: be provided with the odd number wire connection hole by balance in this traction limp, the pull rope connecting hole is arranged on the same axis with the wire connection hole that is located at limp body center, wire connection hole, pull rope connecting hole are along traction limp body balanced arrangement, and the traction limp is all the time along the central axis stress balance when having guaranteed three leads of pull rope traction; In the unfolding conductor process, by the setting that guiding brace summer and guiding promote beam is set in this traction limp, the guide roller that makes odd number root lead arrange along the odd number symmetrical balance is opened up forward and is put, the traction limp remains stress balance, avoid traction limp upset in the construction, the phenomenon that lead twines mutually makes things convenient for site operation, improves efficiency of construction.
Description of drawings
Fig. 1 is the structural representation of general " one leads three " traction limp in the prior art, wherein, and 1-pull rope connecting hole, 2-limp body, 3-wire connection hole, 4-counterweight;
Fig. 2 is the front view of traction limp described in the utility model;
Fig. 3 is the end view of traction limp described in the utility model;
Fig. 4 is the arrangement relation figure that traction limp described in the utility model and releasing pulley are used;
Fig. 5 is the pulley spindle nested structure schematic diagram of releasing pulley, and the left side is the front view of pulley axle sleeve among the figure, and the right side is the end view of pulley axle sleeve among the figure;
Fig. 6 is the pulley axle structural representation of releasing pulley, and the left side is the front view of pulley axle among the figure, and the right side is the end view of pulley axle among the figure;
Wherein, the 28-brace summer that leads, the 29-guiding promotes beam, 30-limp body, 31-pull rope connecting hole, 32-wire connection hole;
The 21-suspension linkage member, the 22-link plate, the 23-support, the movable wire rope pulley of 24-, the movable guide roller of 25-, the 26-pulley axle, the fixed guide roller of 27-, the 41-gathering sill, the 42-positioning convex point, the 51-guide beam, 52-locatees concave point.
Embodiment
Traction limp with " one leads three " form is that example is done further detailed description to tow out plate structure of the present utility model below.
As Fig. 2, shown in Figure 3, this routine described traction limp mainly comprises two guiding brace summers 28, two guiding promote beam 29, a limp body 30, a pull rope connecting hole 31 and three wire connection holes 32, one of them wire connection hole 32 is located at the afterbody center of limp body 30, two other wire connection hole 32 symmetries are located at the two sides of tail of limp body 30, pull rope connecting hole 31 be located at the supercentral wire connection hole 32 of limp body afterbody and be arranged on the same axis, because three wire connection hole 32 balanced arrangement, so the traction limp need not to be provided with counterweight.
Two guiding brace summers 28 are positioned at the following of limp body 30 and are positioned at the symmetric position of both sides, limp body axis, the shape of guiding brace summer 28 matches with the flute profile of the fixed guide roller 27 of releasing pulley, its height is advisable with contacting of pulley limp body 30 is supported break away from, the setting of guiding brace summer 28 is for when drawing limp through releasing pulley, supports the pressure of traction limp and lead.
Two guiding promote that beam places the following of limp body 30 and between two guiding brace summers 28, the corresponding respectively movable wire rope pulley 24 that will promote of the front end original position of two guiding promotion beams 29 and the marginal position of movable guide roller 25, when the traction limp begins to promote movable wire rope pulley 24 and the movable guide roller 25 pulley width S distance that moves right during by releasing pulley, movable wire rope pulley 24 after the corresponding respectively mobile pulley width S distance of the rear end final position of two guiding promotion beams 29, movable guide roller 25 marginal position, guiding promotes the match easement curve that is shaped as of beam 29.
" one leads three " lead symmetric arrangement force balance type traction limp, three wire connection hole 32 balanced arrangement are in traction limp afterbody, and pull rope connecting hole 31 is arranged on the same axis with the wire connection hole 32 of center.Wire connection hole 32, pull rope connecting hole 31 are along traction limp body 30 balanced arrangement, and the traction limp is along the central axis stress balance when guaranteeing three leads of pull rope traction.
As Fig. 4-shown in Figure 6, this routine described releasing pulley mainly comprises suspension linkage member 21, link plate 22, support 23, pulley axle 26, a movable wire rope pulley 24, a movable guide roller 25 and two fixed guide rollers 27, pulley axle 26 is fixed on the middle part of support 23, on support, be positioned at described movable wire rope pulley 24, the top of movable guide roller 25 and fixed guide roller 27 is connected with link plate 22, link plate 22 is provided with suspension linkage member 21, described movable wire rope pulley 24, movable guide roller 25 and fixed guide roller 27 can freely rotate around pulley axle 26, and movable wire rope pulley 24 and movable guide roller 25 also can slide along pulley axle.
This releasing pulley is provided with five pulley position, one of them pulley position is vacant, other four pulley position are respectively equipped with the movable wire rope pulley of of being socketed on the pulley axle 26 24, movable guide roller 25 and two fixed guide rollers 27, movable wire rope pulley 24 is positioned at the centre position (being the centre position of releasing pulley) of pulley axle, movable guide roller 25 is positioned at the left side of movable wire rope pulley 24, the right side symmetrical with it is provided with a pulley room, and this room can hold a movable wire rope pulley 24.Movable wire rope pulley 24 can move to the room along pulley axle 26, movable guide roller 25 can move to the centre position (being the centre position of releasing pulley) of pulley axle along pulley axle 26, two fixed guide rollers 27 are symmetrically arranged in the outermost of pulley position, and these two fixed guide roller positions on pulley axle 26 can not be moved.
In order to make movable wire rope pulley 24 and movable guide roller 25 along pulley axle 26 flexible movement and reduce frictional force between movable wire rope pulley 24 and movable guide roller 25 and the pulley axle, a pulley axle sleeve is as shown in Figure 5 respectively installed at the endoporus place that is preferably in movable wire rope pulley 24 and movable guide roller 25, the interior hole shape of the shape of this pulley axle sleeve and movable wire rope pulley 24 and movable guide roller 25 adapts, this pulley spindle cover is provided with square gathering sill 41, and the sidewall center of gathering sill 41 is provided with a location salient point 42.
As shown in Figure 6, pulley axle 26 is provided with square guide beam 51, this guide beam is located at the pulley axle centre position, its length is the summation of three pulley position, be evenly equipped with three location concave points 52 on the sidewall of guide beam 51, the position of each location concave point is corresponding with the positioning convex point 42 that pulley spindle puts respectively.
Adopt matched in clearance between described pulley axle sleeve and the pulley axle 26, movable wire rope pulley 24 and movable guide roller 25 cooperate guiding to move by the gathering sill 41 of pulley axle sleeve with the guide beam 51 of pulley axle 26, movable wire rope pulley 24 and movable guide roller 25 cooperate the location by the positioning convex point 42 of pulley axle sleeve with the location concave point 52 of pulley axle.
As shown in Figure 4, during unfolding conductor was specifically implemented, pull rope passed through from the movable wire rope pulley 24 of releasing pulley during initial condition, and pull rope connects the traction limp, and three leads of traction limp connection are opened up forward and put.This moment, movable wire rope pulley 24 passed through the positioning convex point 42 of pulley axle sleeve, was positioned location concave point 52 places in pulley axle centre position; Movable guide roller 25 is positioned at concave point 52 places, movable wire rope pulley 24 leftward position location.Movable wire rope pulley 24 is in the centre position (being the centre position of releasing pulley) of pulley axle this moment, so pull rope is positioned at the releasing pulley centre position, the releasing pulley stress balance to the active force of coaster.And three lead wiring holes of traction limp adopt the balance setting, the lead that therefrom passes through also since with make traction limp stress balance all the time cooperating of releasing pulley.
Draw the process of limp: when coaster is gone in the traction limp by releasing pulley, guiding brace summer 28 in the limp contacts with the fixing cord at releasing pulley two ends wheel 27, support the pressure of traction limp and lead, the movable wire rope pulley 24 of releasing pulley and movable lead pulley 25 are in Light Condition at this moment, along with the traction limp continues to walk forward along fixed guide roller 27, two movable pulleys are pulled guiding in the limp and promote beam 29 and release and move to the right from the concave point 52 of location, when releasing pulley is passed by in the traction limp, two movable pulleys are moved right one takes turns wide S distance, places the location concave point 52 of relevant position.At this moment movable guide roller 25 is positioned at the releasing pulley centre position, and movable wire rope pulley 24 is positioned at the position on movable guide roller 25 right sides, and movable guide roller 25 leftward position are vacant.
This moment, three guide roller positions were symmetrically arranged in releasing pulley, and along with continuing traction, three leads are opened up forward along the guide roller of three symmetrical balances layouts and put, and traction limp and releasing pulley be stress balance still.
This routine specific implementation process shows, the traction limp of " one leads three " form is in the overall process that exhibition is put, comprise that pull rope passes through releasing pulley, lead is by each operating mode of coaster, traction limp and the equal stress balance of releasing pulley can not produce the situation that traction limp or releasing pulley tilt, overturn.Traction limp described in the utility model is not restricted to one and leads three forms, in addition also can adopt one to lead and lead seven various ways such as (promptly comprising a pull rope connecting hole 31 and seven wire connection holes 32) five (promptly comprising a pull rope connecting hole 31 and five wire connection holes 32), one.
Should be noted that at last: above embodiment only is not intended to limit in order to the explanation the technical solution of the utility model, although the utility model is had been described in detail with reference to the foregoing description, those of ordinary skill in the field are to be understood that: still can make amendment or be equal to replacement embodiment of the present utility model, and do not break away from any modification of the utility model spirit and scope or be equal to replacement, it all should be encompassed in the middle of the claim scope of the present utility model.

Claims (4)

1. traction limp, this traction limp comprises limp body (30), be connected pull rope connecting hole (31) and wire connection hole (32) on the limp body, it is characterized in that: this limp comprises that also guiding brace summer (28) and guiding promote beam (29), described guiding brace summer (28) places the following of limp body (30) and is positioned at the symmetric position of both sides, limp body axis, and described guiding promotion beam (29) places the following of limp body (30) and is positioned between two guiding brace summers (28).
2. traction limp according to claim 1, it is characterized in that: be connected with a pull rope connecting hole (31) and odd number wire connection hole (32) on the described limp body, described pull rope connecting hole (31) be connected above the limp body (30) and be positioned on the axis of limp body, each wire connection hole (32) all is located at the afterbody side of limp body, in the described wire connection hole one with pull rope connecting hole (31) is located on the same axis, remaining wire connection hole is symmetrically distributed in limp body axis both sides.
3. traction limp according to claim 1 and 2 is characterized in that: described limp body (30) is provided with two guiding and promotes beam (29), and described guiding promotes the match easement curve that is shaped as of beam (29).
4. traction limp according to claim 1 and 2 is characterized in that: the shape of described guiding brace summer (28) and the wheel groove shape of guide roller adapt.
CN2010201178210U 2010-02-23 2010-02-23 Traction running board Expired - Fee Related CN201674156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201178210U CN201674156U (en) 2010-02-23 2010-02-23 Traction running board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201178210U CN201674156U (en) 2010-02-23 2010-02-23 Traction running board

Publications (1)

Publication Number Publication Date
CN201674156U true CN201674156U (en) 2010-12-15

Family

ID=43331564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201178210U Expired - Fee Related CN201674156U (en) 2010-02-23 2010-02-23 Traction running board

Country Status (1)

Country Link
CN (1) CN201674156U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106505474A (en) * 2016-12-29 2017-03-15 国网浙江余姚市供电公司 A kind of guiding device
CN112234502A (en) * 2020-09-29 2021-01-15 国网北京市电力公司 Walk board and walk board connected system easily through unwrapping wire coaster

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106505474A (en) * 2016-12-29 2017-03-15 国网浙江余姚市供电公司 A kind of guiding device
CN112234502A (en) * 2020-09-29 2021-01-15 国网北京市电力公司 Walk board and walk board connected system easily through unwrapping wire coaster

Similar Documents

Publication Publication Date Title
CN101510677B (en) Method and system for unfolding conductor
CN101789568B (en) Symmetrical arrangement force balance type tackle for paying-off with a pull walking board and three wires, and pull walking board
CN105576552A (en) Tension stringing self-balancing wire paying-out tackle and towing plate
CN106099758A (en) System is built in the bypass of a kind of agriculture distribution line
CN201674156U (en) Traction running board
CN102074910A (en) General combined type stringing pulley
CN101651306B (en) Asymmetric traction plate and matching stringing pulley for one-pull-three tension stringing
CN204205420U (en) Tension stringing self-balancing releasing pulley and towing plate
CN101582571A (en) Multi-supporting point self balancing paying-off tackle
CN201490620U (en) Balanced dual-traction type running board
CN202864746U (en) Telescopic boom crane
CN208932693U (en) A kind of twisted and released of the cable line integrated device
CN206956561U (en) A kind of truss combined deck unit erection gantry walking mechanism
CN201260047Y (en) Asymmetric line discharging tackle
CN204185775U (en) A kind of two-wire reciprocal gantry type systemic circulation trailer system
CN203428776U (en) Lifting tool and hoisting equipment using same
CN201674155U (en) Balanced stress paying-off tackle with movable pulleys
CN103496630B (en) A kind of suspender and use the weight-lifting equipment of this suspender
CN211975048U (en) Main driving system for power catwalk and power catwalk
CN208934493U (en) A kind of traction-type can unbalance loading car cage
CN203139606U (en) Electric bungee jumping bed
CN203246988U (en) Lift car traction system provided with two car roof rope return wheels
CN114314157A (en) Cable unwrapping wire tractive device
CN202260245U (en) Self-balancing towing walking plate
CN102815629B (en) Telescopic arm crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20140321

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: CHINA ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20140321

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100192 HAIDIAN, BEIJING TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20140321

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: China Electric Power Research Institute

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Patentee before: China Electric Power Research Institute

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101215

Termination date: 20170223