CN201661244U - Full hydraulic pressure multi-functional well head device - Google Patents

Full hydraulic pressure multi-functional well head device Download PDF

Info

Publication number
CN201661244U
CN201661244U CN2010201603094U CN201020160309U CN201661244U CN 201661244 U CN201661244 U CN 201661244U CN 2010201603094 U CN2010201603094 U CN 2010201603094U CN 201020160309 U CN201020160309 U CN 201020160309U CN 201661244 U CN201661244 U CN 201661244U
Authority
CN
China
Prior art keywords
centering
well head
taper hole
seat
tapering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201603094U
Other languages
Chinese (zh)
Inventor
马松岭
文治国
袁刚
刘文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lianyungang Huanghai Machinery Co., Ltd.
Original Assignee
LIANYUNGANG HUANGHAI MACHINERY FACTORY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIANYUNGANG HUANGHAI MACHINERY FACTORY CO Ltd filed Critical LIANYUNGANG HUANGHAI MACHINERY FACTORY CO Ltd
Priority to CN2010201603094U priority Critical patent/CN201661244U/en
Application granted granted Critical
Publication of CN201661244U publication Critical patent/CN201661244U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a full hydraulic pressure multi-functional well head device, comprising a well head working table, sliding ways which are arranged left and right are arranged above the well head working table, left and right movable clamping bases are arranged on the sliding ways, left and right semi-circular bayonets are systematically arranged at the connecting position of the two movable clamping bases, a conical hole base is arranged in the bayonet, a conicity centering guidance base is arranged in the conical hole base, and a clamping ring component is arranged in the conicity centering guidance base; conicity centering of the guidance base and flange location are adopted, the clamping ring is centered by a conicity circle, and slides by dead weight along the clamping base flange, clamping and self-locking are automatic, the clamping ring with different specifications can be replaced rapidly and conveniently, centering is rapid, a drill stem or a sleeve pipe can be clamped safely and reliably; the disassembly is convenient and rapid when the clamping ring is replaced under the condition of reliable clamping ensured by the buffering device; multi-process drilling requirements of the full hydraulic pressure multi-functional coal bed gas drilling machine can be met, and diameter size requirements of the sleeve pipe with various specifications can be met; in addition, the function is perfect, the operation is convenient and rapid, the usage is safe and reliable and the structure is compact.

Description

Full-hydraulic multifunctional wellhead device
Technical field
The utility model relates to a kind of technical equipment that is used for resources explorations such as coal, coal bed gas, natural gases, puts the full-hydraulic multifunctional wellhead device of the full-hydraulic multifunctional coal bed gas rig of constructing with the coal emergency dealing especially for coal bed gas prospecting, exploitation, Device in Gas pump drainage.
Background technology
In worldwide, along with the continuous enhancing of the exhausted day by day and people's of petroleum resources environmental consciousness, the exploration and development of the clean type energy-coal bed gas and utilize one of natural energy resource that has become people's great attention.The tempting potentiality of coal bed gas are at first from its huge reserves.In the U.S., it is many that 2000m is equivalent to half of conventional gas reserves with shallow coal bed gas reserves.In China, the coal bed gas reserves occupy the third place in the world, and land 2000m is 31,000,000,000,000 m with shallow coal bed gas resource 3, so big reserves and energy resource supply more and more have the current society of crisis, and the fair exploration of coal bed gas must be very wide.
The pump drainage of gas is put before going into operation in the colliery; can be used as on the one hand clear energy sources in addition economic utilization promote the well-being of mankind; be very favourable to Safety of Coal Mine Production, protection environment, minimizing disaster and increase economic benefit on the other hand; for this reason; research and development multifunctional all-hydraulic coal bed gas rig; it is supporting to improve the cbm exploration technical equipment, optimizes the task of top priority that drilling operation technology becomes cbm exploration and extraction work.
Coal bed gas rig full-hydraulic multifunctional wellhead device is exactly to be one of supporting critical component of multifunctional all-hydraulic coal bed gas rig.
The drilling equipment that is used for the cbm exploration exploitation at present mainly is an oil-well rig, the traditional spindle-type drill in water source rig and coalfield.Practice shows, more than three types of rigs all can not be applicable to well and the job requirements of creeping into of cbm development well obviously have following problem:
1, oil-well rig is used for the cbm exploration construction, can satisfy the probing demand on the function, offshore boring island is arranged, can arrange wellhead assembly and preventer, but be that rotating disk drives because of it, no pressurization function, drilling efficiency is low, and rig and supporting cost are too expensive, and construction cost is too high, other is because of huge, the smooth well site of equipment and the cost height of repairing the roads, relocation equipment cycle are grown, difficulty is many, and migration cost is high-leveled and difficult with extensive use.
2, the water source rig is used for the cbm exploration construction, because of the relative oil-well rig of equipment manufacturing cost low, construction cost is lower, because of there not being offshore boring island, be not easy to arrange wellhead assembly and preventer, in the construction blowout and gas leakage might take place, have serious potential safety hazard, and be that rotating disk drives equally, existence can not be pressurizeed and the inefficiency problem.
3, traditional spindle-type core drill, the equipment input cost is lower, has the vertical shaft pressurization function, and drilling efficiency is slightly high, and existing problems are not have offshore boring island equally, are not easy to arrange wellhead assembly and preventer, and drill capacity is less, and it is more shallow to hole.
4, all incompatibility heavy caliber drilling wells of above all kinds equipment can not be descended magnifying diameter sleeve pipe and drilling tool.
Summary of the invention
The technical problems to be solved in the utility model is at the deficiencies in the prior art, has proposed the different drilling technologies of a kind of adaptation, can transfer the full-hydraulic multifunctional wellhead device of different size sleeve pipe.
The technical problems to be solved in the utility model is achieved through the following technical solutions; A kind of full-hydraulic multifunctional wellhead device; Comprise the well head workbench; Be characterized in: about on the well head workbench, being provided with to the slideway that arranges; At slideway movable deck is housed; About movable deck is set to two; Semicircle bayonet socket about being provided with of two movable deck joint symmetries; In bayonet socket, be provided with the taper hole seat; In the taper hole seat, be provided with tapering centering pilot seat; In tapering centering pilot seat, the snap ring assembly is housed
Described taper hole seat is provided with the centering endoporus of taper, the taper hole seat and movable deck is corresponding be set to about two,
Described tapering centering pilot seat evenly is provided with four centering teeth, and the centering tooth is provided with the conical surface that cooperates centering with the centering endoporus of above-mentioned taper hole seat, tapering centering pilot seat about the center line of two wherein relative teeth of feeling relieved is divided into two,
Described snap ring assembly is formed by four, and every outer wall all is provided with positioning boss, and positioning boss is arranged between every two the adjacent centering teeth of tapering centering pilot seat.
The technical problems to be solved in the utility model can also come further to realize by the following technical programs, be provided with spring bumper in taper hole seat bottom, spring bumper comprises position-limitting pin, spring and cushion collar, the bottom that is contained in the taper hole seat that cushion collar floats by position-limitting pin, spring housing is contained on the pin below the cushion collar, and cushion collar is provided with the boss that upwards withstands on tapering centering pilot seat bottom.
The technical problems to be solved in the utility model can also come further to realize by the following technical programs, is provided with between movable deck and the well head workbench to plug and unplug lock and tightly install.
The utility model compared with prior art on the basis of original well head workbench, has increased the well head translating device; Plugging and unplugging lock tightly installs; Tapering centering pilot seat guiding and centering device; Change various snap rings and buffering structure fast.The well head translation strengthens opening diameter, adapts to different drilling technologies, transfers the sleeve pipe of different size; The rigidity and the stable working of insert-pull pin locking having increased well head mobile device; Centering of guide holder tapering and flange location, snap ring, tightens and self-locking along guide holder flange guiding deadweight slippage automatically with the round centering of tapering, can change the snap ring of different size quickly and easily, and centering tightens drilling rod or sleeve pipe safely and reliably fast; When guaranteeing to change snap ring under the situation of reliable chucking, dismantles by buffer brisk convenience.
The present invention can satisfy multifunctional all-hydraulic coal bed gas rig multiplex (MUX) process probing requirement, transfers the diameter dimension demand of all size sleeve pipe, and perfect in shape and function, easy to operate, quick, safe and reliable, compact conformation.
Description of drawings
Fig. 1 is a structure diagram of the present utility model.
Fig. 2 for pull pin, major diameter sleeve pipe schematic diagram down after the movable deck translation.
Fig. 3 is a taper hole seat schematic diagram.
Fig. 4 is a tapering centering pilot seat schematic diagram.
Fig. 5 is the lateral view of Fig. 4.
Fig. 6 is a sleeve pipe snap ring schematic diagram.
Fig. 7 is the lateral view of Fig. 6.
Fig. 8 is a drill collar snap ring structure chart.
Fig. 9 is the lateral view of Fig. 8.
The specific embodiment
A kind of full-hydraulic multifunctional wellhead device comprises well head workbench 1, to the slideway that is provided with, movable deck 3 is housed on slideway about being provided with on well head workbench 1, is provided with between movable deck 3 and the well head workbench to plug and unplug the tight device 8 of lock.About movable deck 3 is set to two, fix with pressing plate, action by oil cylinder 2 realizes its locomotive function, be furnished with four pin-and-holes that enter for latch on it, semicircle bayonet socket about being provided with of two movable deck 3 joint symmetries is provided with taper hole seat 7 in bayonet socket, be provided with tapering centering pilot seat 6 in taper hole seat 7, in tapering centering pilot seat 6, snap ring assembly 5 is housed, in snap ring assembly 5, can also adorns drill collar snap ring 4.
Described taper hole seat 7 is provided with the centering endoporus of taper, the taper hole seat and movable deck is corresponding be set to about two,
The well head workbench is installed in the bottom of rig mast as basic part, and it is provided with rail plate, the installation pressing plate of mounting slip formula deck, and 4 insert-pull pin oil cylinders are installed in the lower end.After pulling pin, but movable deck translation, magnify in the aperture, supplies magnifying diameter sleeve pipe down, and when the deck translation was regained, pin inserted and locks for the operation of loading and unloading drill rod boring tool.
Described tapering centering pilot seat 6 evenly is provided with four centering teeth 12, and centering tooth 12 is provided with the conical surface that cooperates centering with the centering endoporus of above-mentioned taper hole seat, tapering centering pilot seat about the center line of two wherein relative teeth of feeling relieved is divided into two,
Described snap ring assembly 5 is formed by four, and every outer wall all is provided with positioning boss 13, and positioning boss 13 is arranged between every two the adjacent centering teeth of tapering centering pilot seat.
Be provided with spring bumper in taper hole seat bottom, spring bumper comprises position-limitting pin 10, spring 11 and cushion collar 9, the bottom that is contained in the taper hole seat that cushion collar 9 floats by position-limitting pin 10, spring 11 is sleeved on the pin 10 below the cushion collar, and cushion collar is provided with the boss that upwards withstands on tapering centering pilot seat bottom.
The snap ring assembly is 4 lobe formula structures, when sleeve pipe or drilling rod are put into, plays the bushing effect, moves down along the taper hole inclined-plane by deadweight and frictional force, and sleeve pipe or drill rod boring tool is stuck.By the sleeve pipe snap ring of changing different size and sleeve pipe and the drilling rod that the drilling rod snap ring reaches the clamping different size.Spring bumper, snap ring is lifting state when on the one hand guaranteeing nature, on the other hand when sleeve pipe or drilling tool is too heavy, spring gave certain recoil strength and lifts smoothly with assurance sleeve pipe snap ring when decrease speed was too fast.

Claims (3)

1. a full-hydraulic multifunctional wellhead device comprises the well head workbench, it is characterized in that:
About on the well head workbench, being provided with to the slideway that is provided with, movable deck is housed on slideway, about movable deck is set to two, semicircle bayonet socket about being provided with of two movable deck joint symmetries, in bayonet socket, be provided with the taper hole seat, in the taper hole seat, be provided with tapering centering pilot seat, in tapering centering pilot seat, the snap ring assembly be housed
Described taper hole seat is provided with the centering endoporus of taper, the taper hole seat and movable deck is corresponding be set to about two,
Described tapering centering pilot seat evenly is provided with four centering teeth, and the centering tooth is provided with the conical surface that cooperates centering with the centering endoporus of above-mentioned taper hole seat, tapering centering pilot seat about the center line of two wherein relative teeth of feeling relieved is divided into two,
Described snap ring assembly is formed by four, and every outer wall all is provided with positioning boss, and positioning boss is arranged between every two the adjacent centering teeth of tapering centering pilot seat.
2. full-hydraulic multifunctional wellhead device according to claim 1, it is characterized in that: be provided with spring bumper in taper hole seat bottom, spring bumper comprises position-limitting pin, spring and cushion collar, the bottom that is contained in the taper hole seat that cushion collar floats by position-limitting pin, spring housing is contained on the pin below the cushion collar, and cushion collar is provided with the boss that upwards withstands on tapering centering pilot seat bottom.
3. full-hydraulic multifunctional wellhead device according to claim 1 is characterized in that: be provided with between movable deck and the well head workbench and plug and unplug lock and tightly install.
CN2010201603094U 2010-04-14 2010-04-14 Full hydraulic pressure multi-functional well head device Expired - Lifetime CN201661244U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201603094U CN201661244U (en) 2010-04-14 2010-04-14 Full hydraulic pressure multi-functional well head device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201603094U CN201661244U (en) 2010-04-14 2010-04-14 Full hydraulic pressure multi-functional well head device

Publications (1)

Publication Number Publication Date
CN201661244U true CN201661244U (en) 2010-12-01

Family

ID=43231659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201603094U Expired - Lifetime CN201661244U (en) 2010-04-14 2010-04-14 Full hydraulic pressure multi-functional well head device

Country Status (1)

Country Link
CN (1) CN201661244U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858202A (en) * 2010-04-14 2010-10-13 连云港黄海机械厂有限公司 Full-hydraulic multifunctional wellhead device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858202A (en) * 2010-04-14 2010-10-13 连云港黄海机械厂有限公司 Full-hydraulic multifunctional wellhead device
CN101858202B (en) * 2010-04-14 2012-11-21 连云港黄海机械股份有限公司 Full-hydraulic multifunctional wellhead device

Similar Documents

Publication Publication Date Title
CN201650256U (en) Ball seat type cracking slide sleeve
CN113550716B (en) Guide post suitable for underwater equipment installation
CN201991465U (en) Multifunctional well drilling pipe column air operated slip
CN104314486A (en) Hydraulic power slip of removable oil string
CN201794546U (en) Hydraulic connecting device for underwater production tree and wellhead
CN103821467B (en) A kind of automatic drilling machine hydraulic power chuck
CN103174388A (en) Nose end hydraulic control clamping device of full-hydraulic drilling machine
CN101858202B (en) Full-hydraulic multifunctional wellhead device
CN204386512U (en) A kind of producing well disc type air operated slips
CN102287149B (en) Hydraulic power slip of drill rod
CN201661244U (en) Full hydraulic pressure multi-functional well head device
CN204225800U (en) A kind of hydraulic power slip of dismantled and assembled petroleum pipe column
CN202266201U (en) Sleeve floating coupler
CN204386523U (en) A kind of rock-core borer integral type clamping, unloading boring rod set
CN202249834U (en) Hydraulic power slip for drill pipe
CN104314485B (en) A kind of producing well disc type air operated slips
CN203321372U (en) Hydraulic chuck of hydraulic drilling machine
CN202706966U (en) Novel sleeve pipe pre-stress ground anchor
CN206016739U (en) Drilling tool is reclaimed in a kind of deep water well head system cutting
CN214944120U (en) Hydraulic control type drill rod dynamic anchor
CN102913197B (en) A kind of underwater base plate guide pile connector
CN203891800U (en) Normally-closed hydraulic chuck with quick-change slip
CN107386997B (en) A kind of bit change more changing device
CN201943623U (en) Oil pipe hydraulic jacking struck releasing device for ocean oil gas producing platform well repairing
CN103775017B (en) Device is dragged in a kind of Refloatation method and side used of disconnected bar

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: LIANYUNGANG HUANGHAI MACHINERY CO., LTD.

Free format text: FORMER NAME: LIANYUNGANG HUANGHAI MACHINERY FACTORY CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 222000, No. 1, Xinjian East Road, Haizhou Development Zone, Jiangsu, Lianyungang

Patentee after: Lianyungang Huanghai Machinery Co., Ltd.

Address before: 222000, No. 1, Xinjian East Road, Haizhou Development Zone, Jiangsu, Lianyungang

Patentee before: Lianyungang Huanghai Machinery Factory Co., Ltd.

AV01 Patent right actively abandoned

Granted publication date: 20101201

Effective date of abandoning: 20130227

RGAV Abandon patent right to avoid regrant