CN201654222U - Detection setting device on electric energy meter production line - Google Patents

Detection setting device on electric energy meter production line Download PDF

Info

Publication number
CN201654222U
CN201654222U CN2010201528888U CN201020152888U CN201654222U CN 201654222 U CN201654222 U CN 201654222U CN 2010201528888 U CN2010201528888 U CN 2010201528888U CN 201020152888 U CN201020152888 U CN 201020152888U CN 201654222 U CN201654222 U CN 201654222U
Authority
CN
China
Prior art keywords
energy meter
module
electric energy
pipeline
pallet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201528888U
Other languages
Chinese (zh)
Inventor
罗冬生
郑坚江
李维晴
周明洁
陈平
傅寅杰
贾涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Sanxing Electric Co Ltd
Original Assignee
Ningbo Sanxing Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Sanxing Electric Co Ltd filed Critical Ningbo Sanxing Electric Co Ltd
Priority to CN2010201528888U priority Critical patent/CN201654222U/en
Application granted granted Critical
Publication of CN201654222U publication Critical patent/CN201654222U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Wire Processing (AREA)

Abstract

The utility model discloses a detection setting device on an electric energy meter production line, which has high automation level, high working efficiency and high reliability and comprises an upper meter module (1), an electric energy meter error debugging module (2), an electric energy meter countering aging and parameter setting module (3), an electric energy meter error reinspecting and parameter inspecting module (4) and a lower meter module (5); a transmission line is arranged between the adjacent modules and between the upper meter module (1) and the lower meter module (5), and each module is internally provided with at least one transmission line which is connected with the transmission line positioned between the modules; each transmission line is provided with a tray as well as a position sensor and a limiting unit; the transmission lines arranged in the modules are all provided with automatic crimping units, and the upper meter module (1) and the lower meter module (5) are also internally provided with scanning units; and motor control modules, the position sensors, the limiting units, the scanning units, the automatic crimping units of the transmission lines are all connected with a central control unit of the electric energy meter production line.

Description

Detection setting device on the electrical energy meter production line
Technical field
The utility model relates to the electric energy meter production technical field, specifically is the detection setting device on a kind of electrical energy meter production line.
Background technology
Detection setting up procedure on the present electrical energy meter production line comprises in regular turn has good luck electric energy meter error debugging, the setting of electric energy meter parameter, electric energy meter aging (having good luck is accuracy by the formal testing electric energy meter of simulated field, whether meets the error criterion that measures industry to judge electric energy meter; The aging pressure burn-in test that is meant by the form of electric energy meter reinforcement electric weight being come it is carried out), electric energy meter error reinspection and parametric test, following table (are loaded onto the upper casing of electric energy meter, to the electric energy meter parameter setting of dispatching from the factory, then electric energy meter is pulled down from instrument simultaneously).
In order to realize above-mentioned production run, the detection setting device on the present electrical energy meter production line substantially by the error debugger, have good luck that the aging parameter of holding concurrently is provided with platform, error reviews and parameter is provided with platform, the Default Value platform constitutes, and on every kind of platform meter connecting shelf is installed all.Every kind of platform is responsible for a production stage, because need manually connect table, and electric energy meter is hauled by the frock car in the circulation of each interstation, an electric energy meter with a model is an example, at first the workman is installed in this piece electric energy meter on the error debugger after scanning the bar code of electric energy meter, start the error debugger then, the error debugger is operated electric energy meter mounted thereto, when operation is finished, pull down this piece electric energy meter by the workman again, the electric energy meter of pulling down is placed on the frock car, haul by the workman and to haul the aging parameter of holding concurrently of having good luck platform is set, after the arrival, the workman is installed in electric energy meter the aging parameter of holding concurrently of having good luck again and is provided with on the platform, be that error is reviewed and parameter is provided with platform with that, the Default Value platform, every electric energy meter so repeats, in the process on demand the bar code to electric energy meter carry out sweep record, so the detection setting device automaticity on the present electrical energy meter production line is low, production efficiency is low, need a large amount of artificial, because the existence of artificial subjective factor, the reliability of whole process of production is also lower.
The utility model content
The technical problems to be solved in the utility model is, the detection setting device on the high electrical energy meter production line of a kind of automaticity height, high efficiency, reliability is provided.
The technical solution of the utility model is, detection setting device on the utility model electrical energy meter production line, it comprises has good luck table module, electric energy meter error debugging module, electric energy meter the aging parameter of holding concurrently is provided with module, electric energy meter error reviews and parametric test module, following table module; Between adjacent block and go up the table module and the following table intermodule is equipped with pipeline, include at least one pipeline in each module, this pipeline is connected with the adjacent with it pipeline that is positioned at intermodule; Described pipeline is provided with the pallet of carrying electric energy meter, also is provided with the position transducer and the position-limiting unit that are used to limit tray position on the described pipeline; Be equipped with the automatic crimping unit that can be connected on the pipeline in the above-mentioned module with the electrical energy meter electricity on the pallet, automatically the crimping unit is positioned at the pallet top, also be provided with scanning element in last table module and the following table module, scanning element also is positioned at the top of pallet, and scanning element is in the front of automatic crimping unit; The motor control module of described pipeline, position transducer, position-limiting unit, scanning element, the crimping unit all is electrically connected with central control unit on the electrical energy meter production line automatically.
After adopting said structure, the utility model compared with prior art, have the following advantages: because it is planned to the table module with original each production stage, the electric energy meter error debugging module, the electric energy meter aging parameter of holding concurrently of having good luck is provided with module, electric energy meter error is reviewed and the parametric test module, these five functional modules of following table module, and between adjacent block and go up the table module and the following table intermodule is equipped with pipeline, also be equipped with at least one pipeline in each module, this pipeline is connected with the adjacent with it pipeline that is positioned at intermodule, like this, above-mentioned pipeline connects into a complete ring, realized circulation, so the circulation of electric energy meter between each production stage is to finish by pipeline, replaced the frock car haul of original manual type;
Again because described pipeline is provided with the pallet of carrying electric energy meter, be used to limit the sensor and the position-limiting unit of tray position, (this automatic crimping unit is positioned at the mobile pallet top to be used for the automatic crimping unit that is electrically connected with electric energy meter on the pallet, and be distributed among the above-mentioned 5 modules) and (this scan module also is positioned at mobile pallet top to be used for scanning the scanning element of pallet and ammeter bar code, but do not existing together with automatic crimping unit), motor control module on the described pipeline, position transducer, position-limiting unit, scanning element, automatically the crimping unit all is electrically connected with central control unit on the electrical energy meter production line, so as long as electric energy meter is installed on the pallet, pass through pipeline, position transducer, position-limiting unit, scanning element, automatically cooperatively interacting of crimping unit just can be realized original multiple function.
Transfer example with a pallet at the pipeline upper reaches, after being installed in electric energy meter on the pallet, the position-limiting unit at this place will unclamp, pallet can be fed forward under the drive of pipeline, the signal of exporting according to position transducer, central control unit can be known the particular location of this pallet after receiving signal, according to last table module, the electric energy meter error debugging module, the electric energy meter aging parameter of holding concurrently of having good luck is provided with module, electric energy meter error is reviewed and the parametric test module, the order of following table module, at first pallet can arrive under the scanning element of table module, when pallet arrives the following time of scanning element of going up the table module, central control unit can order the position-limiting unit at this place to rise to stop and to locate this pallet, scanning element scans the bar code of pallet and the bar code that is positioned at the electric energy meter on the pallet under the control of central control unit then, with recoding tray and be positioned at the identity marks of electric energy meter on the pallet and set up archives at central control unit, afterwards, central control unit can be let pass to this pallet immediately, then, this pallet can arrive the below, automatic crimping unit of table module (because scanning element is in the front of automatic crimping unit, so at first be through the scanning element below), when pallet arrives the below, automatic crimping unit of going up the table module, central control unit can order the position-limiting unit at this place to rise to stop and to locate this pallet, automatically the crimping unit is being connected with electrical energy meter electricity on the pallet under the control of central control unit then, to realize that central control unit carries out data input or exchange to the electric energy meter on this pallet, the same, this pallet can pass through the electric energy meter error debugging module, the electric energy meter aging parameter of holding concurrently of having good luck is provided with module, the below, automatic crimping unit of electric energy meter error reinspection and parametric test module, and everywhere, the automatic crimping unit at this place is being connected with electrical energy meter electricity on the pallet under the control of central control unit, when pallet enters the following table module, at first come under the scanning element of following table module, central control unit can order the position-limiting unit at this place to rise to stop and to locate this pallet, scanning element scans once more to the bar code of pallet and the bar code that is positioned at the electric energy meter on the pallet under the control of central control unit then, follow the tracks of to the management of pallet and to the production data record that is positioned at the electric energy meter on this pallet to make things convenient in the central control unit, thereby in conjunction with primary scanning, set up complete electric energy meter archives, after this step finishes, this pallet can arrive the below, automatic crimping unit of following table module, this automatic crimping unit can be to the dispatch from the factory setting of parameter of electric energy meter, then the workman pulls down electric energy meter from pallet, and empty pallet is returned to table module place by the pipeline of last table module and following table intermodule.Like this, a pallet circulates on pipeline and has just finished.
A plurality of pallets and a pallet are similar, are that a plurality of pallets can detect setting one by one in regular turn, just as the circulation of a pallet, also can detect setting with several one group, are one group such as two.Like this, no matter be a pallet, or a plurality of pallets, pipeline just can continuously detect setting to electric energy meter.
As the above analysis, because electric energy meter only need connect and tear open once, circulation between each production stage is finished by pipeline, detection setting to electric energy meter is finished by automatic crimping unit, scanning to electric energy meter is finished by scanning element, so save a large amount of manually, production efficiency and reliability greatly improve, generally speaking, automaticity is greatly improved.
To sum up, the utlity model has automaticity height, high efficiency, advantage that reliability is high.
Description of drawings
Fig. 1 is the frame principle figure of the detection setting device on the utility model electrical energy meter production line.
Fig. 2 is the structural representation of the detection setting device on the utility model electrical energy meter production line.
Fig. 3 is the vertical view of the pallet of the detection setting device on the utility model electrical energy meter production line.
Fig. 4 is the front view of the scanning element of the detection setting device on the utility model electrical energy meter production line.
Fig. 5 is the side view (clear for expression, omitted roller, electric energy meter and the frame of half of cylinder, rectangular flat, pipeline, lever seat, guide rail have been carried out partial cutaway) of scanister on the utility model electrical energy meter production line.
Fig. 6 is the structural representation of the automatic crimping unit of the detection setting device on the utility model electrical energy meter production line.
Fig. 7 is loop short circuit device 27 fundamental diagrams (having four automatic crimping unit among the figure) of the detection setting device on the utility model electrical energy meter production line.
Shown in the figure, 1, last table module, 2, the electric energy meter error debugging module, 3, the electric energy meter aging parameter of holding concurrently of having good luck is provided with module, 4, electric energy meter error is reviewed and the parametric test module, and 5, the following table module, 6, rectangular flat, 7, meter connecting shelf, 8, signal is to joint chair, 9, stop groove, 10, pilot hole, 11, binding clasp, 12, frame, 13, cylinder, 14, lever, 14.1, fulcrum, 15, lever seat, 16, guide rail, 17, movable block, 18, support, 19, roller in the movable block, 20, chuck, 21, the roller of pipeline, 22, the infrared scan rifle, 23, butt junction, 24, erecting frame, 25, cylinder in the automatic crimping unit, 26, guidepost, 27, loop short circuit device.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Detection setting device on the utility model electrical energy meter production line, it comprises has good luck table module 1, electric energy meter error debugging module 2, electric energy meter the aging parameter of holding concurrently is provided with module 3, electric energy meter error reviews and parametric test module 4, following table module 5; Between adjacent block and go up table module 1 and 5 of following table modules are equipped with pipeline, include at least one pipeline in each module, this pipeline is connected with the adjacent with it pipeline that is positioned at intermodule; Described pipeline is provided with the pallet of carrying electric energy meter, also is provided with the position transducer and the position-limiting unit that are used to limit tray position on the described pipeline; Be equipped with the automatic crimping unit that can be connected on the pipeline in the above-mentioned module with the electrical energy meter electricity on the pallet, automatically the crimping unit is positioned at the pallet top, also be provided with scanning element in last table module 1 and the following table module 5, scanning element also is positioned at the top of pallet, and scanning element is in the front of automatic crimping unit; The motor control module of described pipeline, position transducer, position-limiting unit, scanning element, the crimping unit all is electrically connected with central control unit on the electrical energy meter production line automatically.
Described pipeline is the double-speed chain pipeline.
Described pallet is a rectangular flat 6, and rectangular flat 6 is placed on the pipeline, promptly is placed on the roller 21 of pipeline.Four signals that rectangular flat 6 is provided with 12 meter connecting shelfs 7, be electrically connected with meter connecting shelf 7 to joint chair 8, four stop groove 9, two pilot holes 10 of the automatic crimping unit that is used to lead, described four stop that groove 9 lays respectively at four sides of rectangular flat 6.12 meter connecting shelfs 7 are one group totally four groups with three, and every group is electrically connected a signal to joint chair 8, and signal in fact is a socket to joint chair 8, and each terminal in the socket is electrically connected with corresponding meter connecting shelf 7.
On the described rectangular flat 6 binding clasp 11 is installed also.Described binding clasp 11 comprises operating grip and block, and after electric energy meter was installed on the meter connecting shelf, the workman promoted block by operating grip, and block will withstand a side of electric energy meter, thereby electric energy meter stably is placed on the rectangular flat 6.Binding clasp 11 is a routine techniques, is not repeated at this.
Described scanning element comprises infrared scan rifle 22 and is used for the travel mechanism that straight line moves infrared scan rifle 22, and infrared scan rifle 22 is electrically connected with central control unit, and travel mechanism is installed on the frame 12 of pipeline; Described infrared scan rifle 22 is a plurality of, and a plurality of infrared scan rifles 22 are connected with travel mechanism, and infrared scan rifle 22 is positioned at the pallet top.
Travel mechanism comprises cylinder 13, lever 14, lever seat 15, guide rail 16, movable block 17 and support 18; The end and the frame 12 that deviate from mutually with piston rod of cylinder 13 are hinged, and an end of lever 14 and the piston rod of cylinder 13 are hinged; The fulcrum 14.1 of lever 14 is hinged with lever seat 15, and lever seat 15 is also fixedlyed connected with frame 12; The other end of lever 14 and movable block 17 flexibly connect, and roller 19 is installed in the movable block 17, and the rotating shaft of roller 19 is fixedlyed connected with movable block 17, and the wheel of roller 19 rolls with guide rail 16 and is connected, and guide rail 16 is also fixedlyed connected with frame 12; Support 18 is fixedlyed connected with movable block 17, and support 18 is provided with several chucks 20 that is used to install infrared scan rifle 22, in this example is six, infrared scan rifle 22 and 20 removable connections of chuck.
Described automatic crimping unit comprises butt junction 23, the erecting frame 24 that butt junction 23 is installed that can connect to joint chair 8 with signal, be used to move up and down the cylinder 25 in the automatic crimping unit of erecting frame 24; Described butt junction 23 is electrically connected with central control unit; Described erecting frame 24 is provided with the guidepost that can match with pilot hole 10; Automatically the cylinder 25 in the crimping unit is installed on the frame 12 of pipeline, and the piston rod of the cylinder 25 in the crimping unit is connected with erecting frame 24 automatically.
If joint chair 8 is regarded signal as a female terminal, butt junction 23 is exactly a male terminal so, with signal joint chair 8 is connected and just to be meant that butt junction 23 cooperates joint chair 8 male and females with signal, four signals just have four butt junctions 23 to joint chair 8, this electric connection mode is very common, does not just add expansion at this.
As shown in Figure 2, show to be provided with in the module 1 two strip transmission lines of horizontal parallel distribution on; Be provided with three strip transmission lines of horizontal parallel distribution in the electric energy meter error debugging module 2; The electric energy meter aging parameter of holding concurrently of having good luck is provided with and is provided with 14 strip transmission lines in the module 3, be divided into two-layer up and down, promptly following seven horizontal parallel distributions, above seven horizontal parallel distributions; Electric energy meter error review and parametric test module 4 in be provided with eight strip transmission lines, be divided into two-layer up and down, promptly following four horizontal parallel distributions, above four horizontal parallel distributions; Be provided with two strip transmission lines of horizontal parallel distribution in the following table module 5; Last table module 1 is positioned at aerial pipeline with 5 of following table modules by one and is connected, the purpose that aerial pipeline is set is to reduce the floor area of the detection setting device on the utility model electrical energy meter production line, this aerial pipeline is by following table module 5, electric energy meter error is reviewed and parametric test module 4, the electric energy meter aging parameter of holding concurrently of having good luck is provided with the sky of module 3 these three modules, pipeline by common height is connected to the pipeline of showing in the module 1 near electric energy meter error debugging module 2 then, clear expression for other modules, aerial pipeline among Fig. 2 has saved aerial part, only drawn and be positioned at neighbouring a transition point and the ensuing pipeline that is connected to the common height of table module 1 of electric energy meter error debugging module 2, operation like this, those skilled in the art can not misread in the industry; The pipeline that is provided with between adjacent block just can be realized according to the common construction method of pipeline as shown in the figure, not add and give unnecessary details.
In this example, every strip transmission line all can hold five pallets simultaneously in the last table module 1, five tray positions are promptly arranged, dextrosinistral direction, first and second tray position are installed in electric energy meter on the pallet for the workman and use, all there is the block of position-limiting unit the left and right sides of tray position, also be provided with switch on the pipeline herein, when the workman finishes installment work, press switch, pallet is just let pass, Deng the workman skilled after, also can control clearance automatically, promptly establish a time, require the workman to finish installation in this time to central control unit by central control unit; The workman of first tray position installs to 12 electric energy meters on the meter connecting shelf, and the workman of second tray position connects 12 electric energy meters and meter connecting shelf electrical connections; The 3rd the tray position sky is equipped with a scanning element, and an automatic crimping unit is respectively installed in the 4th and the 5th the tray position sky.
When two or more automatic crimping unit is positioned on the same strip transmission line, (this current signal is provided by high-power electric current source for the current signal that keeps the metering power supply on this strip transmission line, the current value of current signal is very big, no matter the variation of the impedance of measurand, the electric current of current value is set in the total energy constant output of high-power electric current source, be that current value is constant according to being provided with) transmission, consider cost and structural complexity simultaneously, automatically be provided with loop short circuit device 27 on the crimping unit, so just do not need independent metering power supply to be set for each automatic crimping unit, significantly reduce cost and structural complexity, be high-power electric current source only directly with a strip transmission line on high order end and the electrode of powering in the butt junction 23 of low order end for electric energy meter be electrically connected, being positioned at high order end and low order end is each two butt junction 23, four altogether, finish by series connection between high order end and the low order end.Loop short circuit device 27 is exactly a conductor that plays the bridge joint effect, the principle of work of loop short circuit device 27 is, when automatic crimping unit is descending, along the pipeline direction, two butt junctions 23 that are positioned at homonymy disconnect with loop short circuit device 27, butt junction 23 is electrically connected joint chair 8 with signal, current signal is delivered to the butt junction 23 of the other end to joint chair 8, tested electric energy meter through butt junction 23, signal, and the butt junction 23 of this other end is to connect with the butt junction 23 of its next-door neighbour's automatic crimping unit, like this, current signal just can one then one down transmitted; When on the automatic crimping unit during horizontal reset, loop short circuit device 27 will be positioned at two butt junction 23 short circuits of homonymy, extend thereby make current signal can continue series connection, each automatic crimping unit has two loop short circuit devices 27, respectively wherein two butt junctions 23 of correspondence.The transmission of current signal when loop short circuit device 27 guarantees on automatic crimping unit horizontal reset.
Be positioned on the same strip transmission line such as four automatic crimping unit, be respectively automatic crimping unit 1 from left to right, 2,3,4, there are four butt junctions 23 each automatic crimping unit, loop short circuit device 27 is positioned at the top of two butt junctions 23 of homonymy, play the bridge joint effect, current source only directly is electrically connected two butt junctions 23 on the left side in the automatic crimping unit 1 and two butt junctions 23 on the right in the automatic crimping unit 4, automatically connect with two butt junctions 23 on the left side in the automatic crimping unit 2 again after two butt junction 23 parallel connections on the right in the crimping unit 1, automatically connect with two butt junctions 23 on the left side in the automatic crimping unit 3 again after two butt junction 23 parallel connections on the right in the crimping unit 2, automatically connect with two butt junctions 23 on the left side in the automatic crimping unit 4 again after two butt junction 23 parallel connections on the right in the crimping unit 3, like this, the current signal of current source output constitutes the loop, and under the adjusting of current source, the current value of the current signal on the circuit is a setting value and constant.Loop short circuit device 27 is exactly the transmission of current signal when guaranteeing on automatic crimping unit horizontal reset (horizontal reset in the butt junction just 23).
Every strip transmission line is provided with ten tray positions in the electric energy meter error debugging module 2, five tray positions on every strip transmission line the right are used for buffering, an automatic crimping unit is respectively installed in five tray position sky, the remaining left side, all there is the block of position-limiting unit the left and right sides of tray position, and the block of the position-limiting unit at this place is controlled automatically by central control unit; Equally, the electric energy meter aging parameter of holding concurrently of having good luck is provided with that every strip transmission lines are provided with ten tray positions in the module 3, automatic crimping unit of the overhead installation of each tray position, all there is the block of position-limiting unit the left and right sides of tray position, and the block of the position-limiting unit at this place is controlled automatically by central control unit; Electric energy meter error is reviewed and parametric test module 4 interior every strip transmission lines are provided with five tray positions, automatic crimping unit of the overhead installation of each tray position, all there is the block of position-limiting unit the left and right sides of tray position, and the block of the position-limiting unit at this place is controlled automatically by central control unit.
Every strip transmission line is provided with seven tray positions in the following table module 5, dextrosinistral direction, second tray position sky is equipped with a scanning element, an automatic crimping unit is respectively installed in the 4th and the 5th the tray position sky, the 6th and the 7th tray position are torn table open for the workman and are used, after having torn table open, the pipeline of empty pallet by 1 of following table module 5 and last table module is transferred back shows module 1.
Described position transducer, position-limiting unit are all the circulation that cooperates pallet and are provided with, and the set-up mode of these structures on pipeline is common, do not add and gives unnecessary details.Central control unit comprises PLC controller, computer terminal and server, the PLC controller is electrically connected with the motor control module of pipeline, position transducer, the control module of position-limiting unit, the control module of each cylinder on the one hand, be electrically connected with the computer terminal again on the other hand, the computer terminal is electrically connected with server again, the infrared scan rifle 22 of scanning element at first is electrically connected with the computer terminal, this computer terminal is electrically connected with server again, PLC controller and computer terminal all are provided with many as required, server can be one, also can be many.The control system software that loads on the computer terminal, detect and be provided with software the electric energy meter on corresponding pallet and the pallet is controlled, detected and is provided with, finish data processing, storage and management by server, realize production run monitoring in real time and production information output.The control module of the motor control module of described PLC controller, computer terminal, server, pipeline, position transducer, position-limiting unit, the control module of each cylinder itself and mutual connection control all can be passed through existing techniques in realizing, do not add and give unnecessary details.

Claims (4)

1. the detection setting device on the electrical energy meter production line, it is characterized in that it comprises has good luck table module (1), electric energy meter error debugging module (2), electric energy meter the aging parameter of holding concurrently is provided with module (3), electric energy meter error reviews and parametric test module (4), following table module (5); Between adjacent block and go up between table module (1) and following table module (5) and be equipped with pipeline, include at least one pipeline in each module, this pipeline is connected with the adjacent with it pipeline that is positioned at intermodule; Described pipeline is provided with the pallet of carrying electric energy meter, also is provided with the position transducer and the position-limiting unit that are used to limit tray position on the described pipeline; Be equipped with the automatic crimping unit that can be connected on the pipeline in the above-mentioned module with the electrical energy meter electricity on the pallet, automatically the crimping unit is positioned at the pallet top, also be provided with scanning element in last table module (1) and the following table module (5), scanning element also is positioned at the top of pallet, and scanning element is in the front of automatic crimping unit; The motor control module of described pipeline, position transducer, position-limiting unit, scanning element, the crimping unit all is electrically connected with central control unit on the electrical energy meter production line automatically.
2. the detection setting device on the electrical energy meter production line according to claim 1, it is characterized in that, described pallet is rectangular flat (6), rectangular flat (6) is placed on the pipeline, four signals that rectangular flat (6) is provided with 12 meter connecting shelfs (7), be electrically connected with meter connecting shelf (7) to joint chair (8), four stop groove (9), two pilot holes (10) of the automatic crimping unit that is used to lead, described four stop that groove (9) lays respectively at four sides of rectangular flat (6).
3. the detection setting device on the electrical energy meter production line according to claim 1, it is characterized in that, described scanning element comprises infrared scan rifle (22) and is used for the travel mechanism that straight line moves infrared scan rifle (22), infrared scan rifle (22) is electrically connected with central control unit, and travel mechanism is installed on the frame (12) of pipeline; Described infrared scan rifle (22) is a plurality of, and a plurality of infrared scan rifles (22) are connected with travel mechanism, and infrared scan rifle (22) is positioned at the pallet top.
4. the detection setting device on the electrical energy meter production line according to claim 2, it is characterized in that described automatic crimping unit comprises butt junction (23), the erecting frame (24) that butt junction (23) is installed that can connect to joint chair (8) with signal, be used to move up and down the cylinder (25) in the automatic crimping unit of erecting frame (24); Described butt junction (23) is electrically connected with central control unit; Described erecting frame (24) is provided with the guidepost that can match with pilot hole (10); Automatically the cylinder (25) in the crimping unit is installed on the frame (12) of pipeline, and the piston rod of the cylinder (25) in the crimping unit is connected with erecting frame (24) automatically.
CN2010201528888U 2010-04-01 2010-04-01 Detection setting device on electric energy meter production line Expired - Lifetime CN201654222U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201528888U CN201654222U (en) 2010-04-01 2010-04-01 Detection setting device on electric energy meter production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201528888U CN201654222U (en) 2010-04-01 2010-04-01 Detection setting device on electric energy meter production line

Publications (1)

Publication Number Publication Date
CN201654222U true CN201654222U (en) 2010-11-24

Family

ID=43119466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201528888U Expired - Lifetime CN201654222U (en) 2010-04-01 2010-04-01 Detection setting device on electric energy meter production line

Country Status (1)

Country Link
CN (1) CN201654222U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101819266A (en) * 2010-04-01 2010-09-01 宁波三星电气股份有限公司 Detecting and setting device on production line of electric energy meters
CN109001667A (en) * 2018-09-20 2018-12-14 广东电网有限责任公司 Automatic calibration of electric energy meter machine and electric energy meter automatic production line

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101819266A (en) * 2010-04-01 2010-09-01 宁波三星电气股份有限公司 Detecting and setting device on production line of electric energy meters
CN101819266B (en) * 2010-04-01 2012-11-28 宁波三星电气股份有限公司 Detecting and setting device on production line of electric energy meters
CN109001667A (en) * 2018-09-20 2018-12-14 广东电网有限责任公司 Automatic calibration of electric energy meter machine and electric energy meter automatic production line
CN109001667B (en) * 2018-09-20 2023-04-28 广东电网有限责任公司 Automatic verification machine for electric energy meter and automatic production line for electric energy meter

Similar Documents

Publication Publication Date Title
CN101819266B (en) Detecting and setting device on production line of electric energy meters
CN102288935B (en) Electric energy meter calibration system
CN107132484B (en) Comprehensive test system of battery system
CN101329387B (en) Power supply test system
CN202533798U (en) Intelligent detection platform for new energy vehicle control unit
CN201281728Y (en) Direct current resistance tester of full-automatic transformer
CN103713221A (en) Low-frequency transformer automatic comprehensive test machine based on GROOVY data collecting and analyzing system controlled by PLC
CN103033790A (en) Multifunctional on-line testing device of single-phase electricity meter
CN103616888A (en) Function test board for traction control unit of internal combustion locomotive
CN201654222U (en) Detection setting device on electric energy meter production line
CN107271899A (en) A kind of method of testing of many specification voltage generating sets
CN207472998U (en) A kind of railway locomotive electrical equipment detection device
CN211554170U (en) Detection device of power distribution robot
CN206313275U (en) USB joint automatic assembling and test system
CN104569697B (en) A kind of power supply interface detection method for moonlet integration test
CN202177942U (en) Energy meter verification system
CN113495224A (en) Battery pack simulation detection device and detection method
CN203101551U (en) Automatic testing platform for control panel
CN208421630U (en) A kind of control Board Test System of Levitation Controller of Maglev Train
CN111751646A (en) Electric automobile offline detection system and method
CN110658802B (en) Intelligent detection equipment for core trigger circuit board of subway train traction system
CN211826349U (en) A test platform for TYJL-III computer interlocking system
CN113848462A (en) Automatic test platform and test method for PCBA single board in power electronic industry
CN203520072U (en) Signal converter assembly detection device
CN114624581A (en) Intelligent comprehensive test platform for electrical accessories of airplane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20101124

Effective date of abandoning: 20130227

RGAV Abandon patent right to avoid regrant