CN201654092U - Adjustable electric energy meter terminal crimp connection device - Google Patents

Adjustable electric energy meter terminal crimp connection device Download PDF

Info

Publication number
CN201654092U
CN201654092U CN2010201650926U CN201020165092U CN201654092U CN 201654092 U CN201654092 U CN 201654092U CN 2010201650926 U CN2010201650926 U CN 2010201650926U CN 201020165092 U CN201020165092 U CN 201020165092U CN 201654092 U CN201654092 U CN 201654092U
Authority
CN
China
Prior art keywords
energy meter
electric energy
terminal
adjustable
meter terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201650926U
Other languages
Chinese (zh)
Inventor
梅鸿
王新生
陈岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Qingtong Boke Automation Technology Co Ltd
Original Assignee
Hangzhou Qingtong Boke Automation Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Qingtong Boke Automation Technology Co Ltd filed Critical Hangzhou Qingtong Boke Automation Technology Co Ltd
Priority to CN2010201650926U priority Critical patent/CN201654092U/en
Application granted granted Critical
Publication of CN201654092U publication Critical patent/CN201654092U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Manufacturing Of Electrical Connectors (AREA)

Abstract

The utility model relates to an adjustable electric energy meter terminal crimp connection device. The utility model solves the technical problem of providing the adjustable electric energy meter terminal crimp connection device with high calibration efficiency, and aims to solve problems of automatically detecting the compatibility of the terminal crimp connection device on a product line to electric energy meters with different specifications, and automatically realizing automatic crimp connection and separation of each lead terminal of a single-phase electronic type electric energy meter and a lead corresponding to an electric energy meter calibration equipment. The utility model adopts the technical scheme for solving the problems: the adjustable electric energy meter terminal crimp connection device is provided with a base plate on which a meter support and a push-pull link mechanism for automatically connecting and disconnecting line are mounted, one group of current and voltage thimbles and auxiliary probes are arranged on the meter support, and the utility model is characterized in that: an adjustable unit is arranged on the base plate for adjusting the space between each current and voltage thimble and the auxiliary probe. The utility model is mainly applied to the electric energy meter for automatically detecting the automatic crimp connection and separation of each lead terminal and the corresponding lead of the electric energy meter calibration equipment of the single-phase electronic type electric energy meter on the product line.

Description

Adjustable energy meter terminal crimping device
Technical field
The utility model relates to a kind of electric energy meter terminal press-connection device, particularly a kind of adjustable energy meter terminal crimping device, the automatic crimping (wiring) that mainly is applicable to conductor terminals such as single-phase electronic energy meter current terminal, voltage terminal and auxiliary terminal and electric energy meter calibration equipment corresponding lead on the electric energy meter automatic Verification production line with separate (taking out stitches).
Background technology
Electric energy meter has existed many years with the electric energy meter calibration technology of calibrating platform form, and the Measuring and testing center of national grid each province, city's electric power company all adopts this traditional approach to carry out the calibration operation of electric energy meter.Because the testing person spend in manual dress table, wiring, takes out stitches a lot of times, on following table and a dead lift, so have that production efficiency is low, labour intensity is big, resource occupation is many, quality control is difficult and problem such as operating environment difference.
In recent years, electronic electric energy meter has obtained generally promoting, because electronic electric energy meter does not all have specific (special) requirements for the position and the angle of placing when calibrating.Therefore, make electronic electric energy meter realize that on streamline automatic Verification becomes possibility.
2009, state net company formulated unified physical dimension and the Interface Terminal standard of electronic electric energy meter, had removed last one obstacle for carrying out electronic electric energy meter high-level efficiency automatic Verification on streamline.Simultaneously, state net company clear and definite electric energy meter measurement instrument in " State Grid Corporation of China electric energy electric-power metering center is built and management regulation " " is concentrated calibrating, unified dispensing " and the unified strategic objective of measurement verification information system management, for positive facilitation is played in the electronic electric energy meter automatic Verification work of promotion each province and city Utilities Electric Co..
Core technology in the electric energy meter automatic Verification production line: at first be to solve conductor terminal and electric energy meter calibration equipment corresponding lead such as electric energy meter electric current terminal, voltage terminal and auxiliary terminal, guarantee to stablize, reliably automatically crimping (wiring) with separate (taking out stitches); Next is that by the local quick conversion of terminal press-connection device, solution transition period, all kinds of electric energy meters can be gone up the compatibility of automatic Verification production line before implementation state net company electric energy meter is unified physical dimension and Interface Terminal standard.Yet effective solution is not also found in the home market at present.Therefore, invent the success or failure and the scope of application that a kind of variable terminal press-connection device is directly connected to electric energy meter automatic Verification production line.
Summary of the invention
The technical problems to be solved in the utility model is: the problem at above-mentioned existence provides a kind of simple in structure, safe and reliable, the high adjustable energy meter terminal crimping device of calibrating efficient, be intended at electric current, the electric energy meter of there are differences of spacing between the conductor terminal such as voltage and auxiliary terminal, by thimble and probe are carried out accommodation, solve the compatibility of automatic Verification production line upper terminal compression bonding apparatus to the electric energy meter of all kinds of different sizes, simultaneously, realize the single-phase electronic energy meter current terminal automatically, the automatic crimping (wiring) of voltage terminal and conductor terminals such as auxiliary terminal and electric energy meter calibration equipment corresponding lead with separate (taking out stitches).
The technical scheme that the utility model adopted is: adjustable energy meter terminal crimping device, has substrate, installation table holder and be used for connecing automatically the push-and-pull link gear of taking out stitches on it, in the table holder one group of current/voltage thimble and assist probes are set, it is characterized in that: the adjustable unit that is provided for adjusting spacing between each current/voltage thimble and the assist probes on the described substrate.
On the described substrate fine tuning guide mechanism is installed.
Described adjustable unit comprises that two classifications between Zai Biao Tuo and the substrate highly fill up, the built-in spacing fixture block of table holder, at the spacing difference of electric energy meter electric current voltage terminal, regulate spacing between each current/voltage thimble by the spacing fixture block of changing different specification size; The whole probe base of dismountable installation is gone up in the table holder, be provided with on the whole probe base one group with electric energy meter on the corresponding assist probes of auxiliary terminal, different at concrete electric energy meter auxiliary terminal spacing and definition are by changing whole probe base and realizing compatible conversion in company with multicore signal wire plug.
Seven foots pad that comprise on cylindrical knob and the circumference thereof are highly filled up in described classification, and altitude range applicatory is 12-15mm, promptly trivet and the height of high foot pad is for Wei not 12mm and 15mm, and the difference in height between adjacent each foot pad is 0.5mm.
Described push-and-pull link gear comprises two guide poles that are installed on the substrate, the guide pole overcoat can along its in axial sliding the crimping pushing block with separate pulling block, fuse by two spacing connecting rods between described crimping pushing block and the separation pulling block, crimping pushing block middle part is hinged with the piston rod of cylinder, drive the crimping pushing block and separate pulling block and slide by cylinder along guide pole, guarantee that to-and-fro movement is stable and activity space is reliable, realize the fluency of energy meter terminal crimping and separation.
Described crimping pushing block is two symmetric arrangement and the oblique contract guiding pushing block that connects by screw rod, the screw rod two ends are threaded with the crimping pushing block by positive left-hand thread, screw rod middle part overcoat stage clip is realized automatic centering by the precompression of stage clip in the middle of the screw rod and the positive left-hand thread of two ends.
Described fine tuning guide mechanism is two side orienting lugs that are arranged symmetrically on the substrate, and two side orienting lugs lay respectively at electric energy meter and connect the both sides of tearing stroke open.
Described side orienting lug comprises main body, offer a distortion groove near the edge of two side orienting lug line of symmetry one sides on it and form flexure strip, micrometer adjusting screw has been threaded on the main body, the vertical flexure strip that withstands after this micrometer adjusting screw passes main body and is out of shape groove, by the rotary fine adjustment screw, change the width of distortion groove, promptly change the distance between flexure strip and the main body, the electric energy meter position is finely tuned, guarantee that each terminal of electric energy meter imports current/voltage thimble and assist probes reliably, accurately.
The beneficial effects of the utility model are: 1, adjustable unit is set on substrate, can be according to the difference of spacing between each terminal on the inspection electric energy meter, convenient corresponding each current/voltage thimble of adjustment and the spacing between the assist probes, thus realized the compatibility of automatic Verification production line upper terminal compression bonding apparatus to the electric energy meter of all kinds of different sizes; 2, adopt the push-and-pull link gear, the connecing automatically of conductor terminal such as current terminal, voltage terminal and auxiliary terminal of realization electric energy meter are taken out stitches, make electronic electric energy meter realize that on streamline automatic Verification becomes possibility, repeating of having solved simultaneously that manually-operated exists in the prior art is consuming time, resource occupation is many, quality control is difficult and problem such as operating environment difference, improve the work efficiency of calibrating greatly, reduced labor strength.
Description of drawings
Fig. 1 is a front view of the present utility model.
Fig. 2 is the left view of Fig. 1.
Fig. 3 is the structural drawing that classification is highly filled up in the utility model.
Fig. 4 is the structural drawing of side orienting lug in the utility model.
Fig. 5 is the structural drawing (advances four goes out) of spacing fixture block in the utility model.
Fig. 6 is that the A-A of Fig. 3 is to cut-open view.
Fig. 7 is the structural drawing (one-in-and-two-out) of spacing fixture block in the utility model.
Fig. 8 is that the B-B of Fig. 3 is to cut-open view.
Fig. 9 is the johning knot composition between whole probe base and the table holder in the utility model.
Figure 10 is the left view of Fig. 9.
Figure 11 is the structural drawing of push-and-pull link gear in the utility model.
Embodiment
Extremely shown in Figure 2 as Fig. 1, present embodiment comprises substrate 10, during actual the use, this substrate tilts to place, with the angle of horizontal direction be the 50-65 degree, place parallel with it electric energy meter 16 on the substrate 10, in order to reduce in the calibration equipment magnetic field to the influence of electric energy meter 16 little current errors, foundation plate 10 must select for use non-magnetic material to make, installation table holder 3 and be used for connecing automatically the push-and-pull link gear of taking out stitches on the described substrate 10, in this example, table holder 3 is depended on mountain 1 by table and is cooperated swelling screw 4 to realize reliable location and fixing.In the table holder 3 one group of current/voltage thimble 6 and assist probes 7 are set, corresponding with electric current, voltage terminal and auxiliary terminal on the electric energy meter 16 respectively, on the described substrate 10 adjustable unit and fine tuning guide mechanism are set, be respectively applied for the spacing of adjusting between each current/voltage thimble 6 and the assist probes 7, with be used for electric energy meter 16 positions, guarantee that electric energy meter 16 each terminal import current/voltage thimble 6 and assist probes 7 reliably, accurately.
Described adjustable unit comprises that two classifications between table holder 3 and substrate 10 highly fill up 2, as shown in Figure 3,2 seven foot pad 2-2 that comprise on cylindrical knob 2-1 and the circumference thereof are highly filled up in described classification, the altitude range of foot pad 2-2 is 12-15mm, and the difference in height between adjacent each foot pad 2-2 is 0.5mm, be that classification is highly filled up 2 to be divided into be seven grades in this example, every grade highly respectively is 12,12.5,13,13.5,14,14.5,15mm, wherein highly for the angle between two foot pad 2-2 of 12mm and 15mm is 90 degree, the angle between all the other each adjacent foot pad 2-2 is 45 degree.Highly fill up 2 by the rotation classification, adjust the vertical range between current/voltage thimble 6 and the foundation plate 10; Table holder 3 built-in spacing fixture blocks 15, this spacing fixture block can difference as the case may be selected, can be to advance four as one of Fig. 5-shown in Figure 6 to go out structure (normally four of the electric current and voltage terminals of single-phase electric energy meter, be followed successively by from left to right 1,2,3 and No. 4, one advances four goes out expression and is inlet wire No. 1, be outlet, by that analogy), also can be for No. 4 as Fig. 7-one-in-and-two-out structure shown in Figure 8; Because each spacing fixture block 15 is used for fixing the spacing difference between the mounting hole of current/voltage thimble 6, directly cause the spacing after current/voltage thimble 6 is fixed on the spacing fixture block 15 different because of the difference of spacing fixture block 15 sizes, therefore at the spacing difference of electric energy meter 16 electric currents, voltage terminal, regulate spacing between each current/voltage thimble 6 by the spacing fixture block 15 of changing different specification size; As Fig. 9, shown in Figure 10, whole probe base 5 (adopting plastics to make) utilizes rotation snap close 5-1 and the angle location snap close 5-2 on its two arm to ask lockhole corresponding on 3 to realize quick partition and secure fixation with table, in this example, rotate snap close 5-1 and angle location snap close 5-2 and be hemispherical projections, lockhole in the table holder 3 then is corresponding with it hemispherical groove, and both are interlocked and realize connecting; When need changing whole probe base 5, stir whole probe base 5, rotation snap close 5-1 is shifted out in lockhole, whole probe base 5 integral body are rotated around angle location snap close 5-2, utilize the elasticity of 5 liang of arms self of whole probe base then, angle is located snap close 5-2 in lockhole, shift out, thereby realize the disengaging of whole probe base 5 and Biao Tuo 3.Be provided with on the whole probe base 5 one group with electric energy meter 16 on the corresponding assist probes 7 of auxiliary terminal, different at concrete electric energy meter 16 auxiliary terminal spacings and definition are by changing whole probe base 5 and realizing compatible conversion in company with multicore signal wire plug.In sum, the compatibility of differentiation such as electric energy meter 16 each terminal is realized by changing quick, reliable and accurate conversion such as the mode of built-in spacing fixture block 15 and whole probe base 5, the spacing of assurance current/voltage thimble 6 and assist probes 7 and definition in adjustable unit.
As shown in figure 11, described push-and-pull link gear comprises two guide poles 12 that are installed on the substrate 10, guide pole 12 overcoats can along its in axial sliding crimping pushing block 9 with separate pulling block 8, fuse by two spacing connecting rods 17 between described crimping pushing block 9 and the separation pulling block 8, realize crimping pushing block 9 and the interlock that separates pulling block 8, the piston rod of crimping pushing block 9 middle parts and cylinder 13 is hinged, drive crimping pushing block 9 and separate pulling block 8 by cylinder 13 along guide pole 12 slips, it is stable and activity space is reliable that assurance connects in the disconnect process to-and-fro movement, realizes the fluency of electric energy meter 16 terminal crimping and separation.In this example, described crimping pushing block 9 is two symmetric arrangement and passes through the oblique contract guiding pushing block that screw rod 18 connects, screw rod 18 two ends are threaded with crimping pushing block 9 by positive left-hand thread, screw rod 18 middle part overcoat stage clips 11 are realized automatic centering by the precompression of stage clip 11 in the middle of the screw rod 18 and the positive left-hand thread of two ends.
Described fine tuning guide mechanism is two side orienting lugs 14 that are arranged symmetrically on the substrate 10, and two side orienting lugs 14 lay respectively at electric energy meter 16 and connect the both sides of tearing stroke open.As shown in Figure 4, side orienting lug 14 comprises main body 14-1 in this example, offer a distortion groove 14-2 near the edge of two side orienting lug 14 line of symmetries one sides on it and form flexure strip 14-3, the micrometer adjusting screw 14-4 that has been threaded on the main body 14-1, this micrometer adjusting screw pass the vertical flexure strip 14-3 that withstands behind main body 14-1 and the distortion groove 14-2.In the electric energy meter 16 terminal crimping processes, electric energy meter 16 moves between two side orienting lugs 14 under 9 effects of crimping pushing block, if deviation appears in the correspondence position of each terminal and current/voltage thimble 6 and assist probes 7 on the electric energy meter 16 at this moment, then can pass through rotary fine adjustment screw 14-4, change the width of distortion groove 14-2, promptly change the distance between flexure strip 14-3 and the main body 14-1, finely tune position to electric energy meter 16, guarantee that electric energy meter 16 each terminal are reliable, import current/voltage thimble 6 and assist probes 7 accurately, realize the adaptability that electric energy meter 16 physical dimension are changed.In order further to guarantee the fluency of crimping process, on the side orienting lug 14 chamfering is set, the limit channels (being that electric energy meter 16 connects the stroke of tearing required process open) that makes two side orienting lugs 14 form is funnel section shape.
The principle of work of present embodiment is: during calibrating, electric energy meter 16 is placed on the substrate 10, cylinder 13 actions, it is descending to drive crimping pushing block 9, utilize two oblique contract guiding pushing blocks adjustment electric energy meter 16 vertical axis and substrate 10 axis overlapping in the descending process simultaneously, electric energy meter 16 continues descendingly to contact with auxiliary terminal with current/voltage terminal on the electric energy meter 16 until current/voltage thimble 6 and assist probes 7, at this moment, if current/voltage thimble 6 and assist probes 7 are just corresponding with current/voltage terminal and auxiliary terminal on the electric energy meter 16, then crimping pushing block 9 continues descending, it is descending to drive electric energy meter 16, until the crimping of finishing electric energy meter 16 terminals; If current/voltage thimble 6 and assist probes 7 are not corresponding with current/voltage terminal and auxiliary terminal on the electric energy meter 16, there is slight error, then should adjust two micrometer adjusting screw 14-4 on the side orienting lug 14 as the case may be, change the width of distortion groove 14-2, promptly change the distance between flexure strip 14-3 and the main body 14-1, finely tune position to electric energy meter 16, guarantees that electric energy meter 16 each terminal import current/voltage thimble 6 and assist probes 7 reliably, accurately.After calibrating is finished, cylinder 13 counteragents, drive crimping pushing block 9 and to separate pulling block 8 up, electric energy meter 16 is up under the effect that separates pulling block 8, make electric energy meter 16 terminals and current/voltage thimble 6 and assist probes 7 throw off, realization is taken out stitches, and whole process is carried out fully automatically, and work efficiency improves greatly.During calibrating next group electric energy meter,, then answer corresponding adjustment spacing fixture block 15, the whole probe base 5 of replacing, rotation classification to examine and determine after highly filling up 2 if electric energy meter 16 dimensional structures after changing change to some extent.This example in actual use, electric energy meter 16 full-sizes that can examine and determine are about 160 * 120 * 65mm, the biggest quality is 2kg, maximum crimp force is 900N, the crimping range is 50mm.

Claims (8)

1. adjustable energy meter terminal crimping device, has substrate (10), table holder (3) is installed on it and is used for connecing automatically the push-and-pull link gear of taking out stitches, in the table holder (3) one group of current/voltage thimble (6) and assist probes (7) are set, it is characterized in that: the adjustable unit that is provided for adjusting spacing between each current/voltage thimble (6) and the assist probes (7) on the described substrate (10).
2. adjustable energy meter terminal crimping device according to claim 1 is characterized in that: described substrate (10) is gone up fine tuning guide mechanism is installed.
3. adjustable energy meter terminal crimping device according to claim 1 and 2, it is characterized in that: described adjustable unit comprises that being positioned at table asks two classifications between (3) and the substrate (10) highly to fill up (2), table holder (3) built-in current/voltage thimble (6) and conveniently replaced spacing fixture block (15) of being used for fixing, whole probe base of dismountable installation (5) is gone up in table holder (3), is provided with one group on the whole probe base (5) and goes up the corresponding assist probes of auxiliary terminal (7) with electric energy meter (16).
4. adjustable energy meter terminal crimping device according to claim 3, it is characterized in that: described classification is highly filled up (2) and is comprised seven foots pad (2-2) on cylindrical knob (2-1) and the circumference thereof, the altitude range of foot pad (2-2) is 12-15mm, and the difference in height between adjacent each foot pad (2-2) is 0.5mm.
5. adjustable energy meter terminal crimping device according to claim 1 and 2, it is characterized in that: described push-and-pull link gear comprises two guide poles (12) that are installed on the substrate (10), guide pole (12) overcoat can along its in axial sliding crimping pushing block (9) with separate pulling block (8), fuse by two spacing connecting rods (17) between described crimping pushing block (9) and the separation pulling block (8), crimping pushing block (9) middle part is hinged with the piston rod of cylinder (13).
6. adjustable energy meter terminal crimping device according to claim 5, it is characterized in that: described crimping pushing block (9) is two symmetric arrangement and passes through the oblique contract guiding pushing block that screw rod (18) connects, screw rod (18) two ends are threaded with crimping pushing block (9) by positive left-hand thread, screw rod (18) middle part overcoat stage clip (11).
7. adjustable energy meter terminal crimping device according to claim 2, it is characterized in that: described fine tuning guide mechanism is for being arranged symmetrically in two side orienting lugs (14) on the substrate (10), and two side orienting lugs (14) lay respectively at electric energy meter (16) and connect the both sides of tearing stroke open.
8. adjustable energy meter terminal crimping device according to claim 7, it is characterized in that: described side orienting lug (14) comprises main body (14-1), offer a distortion groove (14-2) near the edge of two side orienting lugs (14) line of symmetry, one side on it and form flexure strip (14-3), the micrometer adjusting screw (14-4) that has been threaded on the main body (14-1), this micrometer adjusting screw pass the vertical flexure strip (14-3) that withstands behind main body (14-1) and the distortion groove (14-2).
CN2010201650926U 2010-04-15 2010-04-15 Adjustable electric energy meter terminal crimp connection device Expired - Lifetime CN201654092U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201650926U CN201654092U (en) 2010-04-15 2010-04-15 Adjustable electric energy meter terminal crimp connection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201650926U CN201654092U (en) 2010-04-15 2010-04-15 Adjustable electric energy meter terminal crimp connection device

Publications (1)

Publication Number Publication Date
CN201654092U true CN201654092U (en) 2010-11-24

Family

ID=43119336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201650926U Expired - Lifetime CN201654092U (en) 2010-04-15 2010-04-15 Adjustable electric energy meter terminal crimp connection device

Country Status (1)

Country Link
CN (1) CN201654092U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806879A (en) * 2010-04-15 2010-08-18 杭州轻通博科自动化技术有限公司 Adjustable energy meter terminal crimping device
CN102121979A (en) * 2010-12-15 2011-07-13 宁波电业局 Insertion device for detecting electric energy meter and detection system of electric energy meter
CN102565467A (en) * 2011-03-30 2012-07-11 浙江省电力公司 Energy meter detection probe device
CN102841332A (en) * 2012-08-09 2012-12-26 费杏宝 Automatic centering device
CN103018508A (en) * 2012-12-06 2013-04-03 辽宁省电力有限公司抚顺供电公司 Power meter metering box
CN103913605A (en) * 2014-03-14 2014-07-09 江苏丽阳电子仪表有限公司 Compressing mechanism for detecting electric performance of electric energy meter
CN105527602A (en) * 2016-01-22 2016-04-27 国家电网公司 Electrical energy gauge calibration platform
CN106154210A (en) * 2016-08-17 2016-11-23 中国电力科学研究院 For three-phase electric energy meter electromagnetic compatibility test can the fast plug assembly of angle measurement multistation
CN113030822A (en) * 2021-02-09 2021-06-25 浙江万胜智能科技股份有限公司 Automatic change electric meter detection device
CN113422275A (en) * 2021-08-25 2021-09-21 南京菲迈斯智能科技有限公司 Auxiliary terminal crimping equipment for intelligent electric meter

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806879B (en) * 2010-04-15 2012-12-19 杭州轻通博科自动化技术有限公司 Adjustable energy meter terminal crimping device
CN101806879A (en) * 2010-04-15 2010-08-18 杭州轻通博科自动化技术有限公司 Adjustable energy meter terminal crimping device
CN102121979A (en) * 2010-12-15 2011-07-13 宁波电业局 Insertion device for detecting electric energy meter and detection system of electric energy meter
CN102565467A (en) * 2011-03-30 2012-07-11 浙江省电力公司 Energy meter detection probe device
CN102841332B (en) * 2012-08-09 2015-08-26 费杏宝 Automatic centring device
CN102841332A (en) * 2012-08-09 2012-12-26 费杏宝 Automatic centering device
CN103018508A (en) * 2012-12-06 2013-04-03 辽宁省电力有限公司抚顺供电公司 Power meter metering box
CN103913605A (en) * 2014-03-14 2014-07-09 江苏丽阳电子仪表有限公司 Compressing mechanism for detecting electric performance of electric energy meter
CN105527602A (en) * 2016-01-22 2016-04-27 国家电网公司 Electrical energy gauge calibration platform
CN105527602B (en) * 2016-01-22 2018-08-03 国家电网公司 A kind of electrical energy meter calibration platform
CN106154210A (en) * 2016-08-17 2016-11-23 中国电力科学研究院 For three-phase electric energy meter electromagnetic compatibility test can the fast plug assembly of angle measurement multistation
CN113030822A (en) * 2021-02-09 2021-06-25 浙江万胜智能科技股份有限公司 Automatic change electric meter detection device
CN113030822B (en) * 2021-02-09 2022-09-23 浙江万胜智能科技股份有限公司 Automatic change electric meter detection device
CN113422275A (en) * 2021-08-25 2021-09-21 南京菲迈斯智能科技有限公司 Auxiliary terminal crimping equipment for intelligent electric meter

Similar Documents

Publication Publication Date Title
CN101806879B (en) Adjustable energy meter terminal crimping device
CN201654092U (en) Adjustable electric energy meter terminal crimp connection device
CN102305893B (en) Method and device for checking power-factor angle of high voltage line of intelligent substation on site
CN203101622U (en) Testing system for 220 V output voltage multi-output voltage mutual inductor
CN102890257B (en) Power frequency magnetic field immunity to interference generator calibration system and calibration steps
CN202305782U (en) Intelligent transformer station high voltage line power factor angle on-site verification apparatus
CN109696625A (en) Portable relay test-device and test method
CN206756908U (en) A kind of Campatible electric energy meter meter adapting-seat
CN214750698U (en) Mountain area 10kV post-mounted intelligent switch opening calibration device
CN202886585U (en) On-line test device for voltage/current transformer
CN105259381B (en) Portable active electric energy metering device
CN209560050U (en) Portable relay test-device
CN203811630U (en) Support for insulating bar voltage-withstanding tests
CN207068637U (en) Indoor support type current transformer
CN105842491A (en) Test terminal needle
CN108802460B (en) Compatible electric energy meter base and method for realizing compatibility
CN211453743U (en) High-voltage line metering complete device
CN201955466U (en) Multifunctional electric apparatus parameter test instrument
CN204558236U (en) A kind of three-phase integrated zero sequence current mutual inductor
CN205509240U (en) Kilowatt -hour meter screen cabinet with function is checied to video
CN204330820U (en) The pneumatic testing stand of a kind of network transformer
CN108878115B (en) 10kV column-mounted high-voltage integrated metering device
CN106501750A (en) A kind of voltage transformer site error detects secondary wiring device
CN208607341U (en) Power supply testing device and system
CN208334470U (en) Generate electricity station service stream rapid measurement device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20101124

Effective date of abandoning: 20130227

RGAV Abandon patent right to avoid regrant