Summary of the invention
The utility model mainly solves existing in prior technology waste heat boiler module and the technical matters that hydraulic testing equipment can't be connected, and makes waste heat boiler module and hydraulic testing equipment be easy to be connected and easy-disassembling-assembling hydraulic devices.
The utility model also solves the technical matters that existing in prior technology need provide hydraulic pressure surplus and surplus to cut off the difficult processing of back groove etc. simultaneously, and a kind of hydraulic devices of leaving the hydraulic pressure surplus, need not finished edge behind hydraulic pressure of need not is provided.
Above-mentioned technical matters of the present utility model is mainly solved by following technical proposals: the utility model comprises the flange end cap with center pit, fixedly connected with the module tubes joint along the module tubes joint ring to some uniform locating pieces, the flange that center-hole diameter is more bigger than the external diameter of pipe adapter, top and middle part have the central shaft of the hollow of screw thread, internal diameter is slightly larger than central shaft, external diameter is slightly less than the pressing plate of pipe adapter, seal block between flange end cap and pressing plate, gland nut is connected with the screw thread at the middle part of central shaft, the flange end cap is fixedlyed connected with flange by bolt connecting device, the center pit of flange is provided with groove identical with locating piece quantity and that the position is complementary, groove is slightly larger than locating piece, and central shaft passes the center pit of flange end cap, fixedly connected by engage thread at the top behind the center pit of seal block and pressing plate.
As preferably, also comprise handle and diaphragm seal, handle is fixedlyed connected with the flange end cap at the afterbody of flange end cap, and by the diaphragm seal sealing, handle is a hollow at an end of flange end cap between handle and flange end cap.
As preferably, the quantity of locating piece is 3.
As preferably, the quantity of locating piece is 4.
Therefore, the utlity model has rational in infrastructure, can not be subjected to the influence of waste heat boiler module tubes joint dense degree on the one hand, still can carry out the hydraulic testing, make on the other hand when making pipe adapter, need not to leave the hydraulic pressure surplus, saved starting material, simultaneously also solve the groove processing problems at the scarfing place that prescinds surplus, need not to carry out again the groove processing of scarfing.
Embodiment
Below by embodiment, and in conjunction with the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment 1: the utility model comprises the flange end cap 2 with center pit, fixedly connected with module tubes joint 11 along 4 uniform locating pieces 3 of module tubes joint 11 hoops, the flange 1 that center-hole diameter is more bigger than the external diameter of pipe adapter 11, top and middle part have the central shaft 7 of the hollow of screw thread, internal diameter is slightly larger than central shaft 7, external diameter is slightly less than the pressing plate 10 of pipe adapter 11, seal block 5 between flange end cap 2 and pressing plate 10, gland nut 6 is connected with the screw thread at the middle part of central shaft 7, flange end cap 2 is fixedlyed connected with flange 1 by bolt connecting device 4, the center pit of flange 1 is provided with groove 12 identical with locating piece 3 quantity and that the position is complementary, groove 12 is slightly larger than locating piece 3, and central shaft 7 passes the center pit of flange end cap 2, fixedly connected by engage thread at the top behind the center pit of seal block 5 and pressing plate 10.(referring to Fig. 5, Fig. 6)
In the present embodiment, by 3 locating pieces 3 of prepackage on the pipe adapter of waste heat boiler module, when carrying out hydrostatic test, groove 12 by flange 1 is inserted in locating piece 3 with flange 1, pack into back rotation 45 degree, flange 1 and pipe adapter 11 are fixed together, by bolt connecting device joint flange end cap 2 and flange 1, by gland nut 6 and central shaft 7 pressing plate 10 and seal block 5 are fixed together again and compress, make it sealing, the afterbody of central shaft 7 is connected with hydraulic equipment, can carries out hydrostatic test.Use the utility model, can not be subjected to the influence of waste heat boiler module tubes joint dense degree on the one hand, still can carry out the hydraulic testing, make on the other hand when making pipe adapter, need not to leave the hydraulic pressure surplus, save starting material, also solved the groove processing problems at the agent mouth place that prescinds surplus simultaneously, need not to carry out again the groove processing of scarfing.
Embodiment 2: the utility model comprises the flange end cap 2 with center pit, fixedly connected with module tubes joint 11 along 3 uniform locating pieces 3 of module tubes joint 11 hoops, the flange 1 that center-hole diameter is more bigger than the external diameter of pipe adapter 11, top and middle part have the central shaft 7 of the hollow of screw thread, internal diameter is slightly larger than central shaft 7, external diameter is slightly less than the pressing plate 10 of pipe adapter 11, seal block 5 between flange end cap 2 and pressing plate 10, gland nut 6 is connected with the screw thread at the middle part of central shaft 7, flange end cap 2 is fixedlyed connected with flange 1 by bolt connecting device 4, the center pit of flange 1 is provided with groove 12 identical with locating piece 3 quantity and that the position is complementary, groove 12 is slightly larger than locating piece 3, and central shaft 7 passes the center pit of flange end cap 2, fixedly connected by engage thread at the top behind the center pit of seal block 5 and pressing plate 10.(referring to Fig. 5)
In the present embodiment, by 3 locating pieces 3 of prepackage on the pipe adapter of waste heat boiler module, when carrying out hydrostatic test, groove 12 by flange 1 is inserted in locating piece 3 with flange 1, pack into back rotation 60 degree, flange 1 and pipe adapter 11 are fixed together, by bolt connecting device joint flange end cap 2 and flange 1, by gland nut 6 and central shaft 7 pressing plate 10 and seal block 5 are fixed together again and compress, make it sealing, the afterbody of central shaft 7 is connected fully with the hydraulic pressure section, can carries out hydrostatic test.Use the utility model, can not be subjected to the influence of waste heat boiler module tubes joint dense degree on the one hand, still can carry out the hydraulic testing, make on the other hand when making pipe adapter, need not to leave the hydraulic pressure surplus, save starting material, also solved the groove processing problems at the scarfing place that prescinds surplus simultaneously, need not to carry out again the groove processing of scarfing.
Embodiment 3: the utility model comprises the flange end cap 2 with center pit, fixedly connected with module tubes joint 11 along 4 uniform locating pieces 3 of module tubes joint 11 hoops, the flange 1 that center-hole diameter is more bigger than the external diameter of pipe adapter 11, top and middle part have the central shaft 7 of the hollow of screw thread, internal diameter is slightly larger than central shaft 7, external diameter is slightly less than the pressing plate 10 of pipe adapter 11, seal block 5 between flange end cap 2 and pressing plate 10, gland nut 6 is connected with the screw thread at the middle part of central shaft 7, flange end cap 2 is fixedlyed connected with flange 1 by bolt connecting device 4, the center pit of flange 1 is provided with groove 12 identical with locating piece 3 quantity and that the position is complementary, groove 12 is slightly larger than locating piece 3, central shaft 7 passes the center pit of flange end cap 2, fixedly connected by engage thread at the top behind the center pit of seal block 5 and pressing plate 10, also comprise handle 8 and diaphragm seal 9, handle 8 is fixedlyed connected with the flange end cap at the afterbody of flange end cap 2, by diaphragm seal 9 sealings, handle 8 is a hollow at an end of flange end cap 2 between handle 8 and flange end cap 2.(referring to Fig. 1, Fig. 2)
In the present embodiment, by 4 locating pieces 3 of prepackage on the pipe adapter of waste heat boiler module, when carrying out hydrostatic test, groove 12 by flange 1 is inserted in locating piece 3 with flange 1, pack into back rotation 45 degree, flange 1 and pipe adapter 11 are fixed together, by bolt connecting device joint flange end cap 2 and flange 1, by gland nut 6 and central shaft 7 pressing plate 10 and seal block 5 are fixed together again and compress, make it sealing, the afterbody at central shaft is equipped with handle 8 simultaneously, and an end of handle 8 is a hollow, can come round with the center pit of central shaft 7, when water inlet, can emit the air in the module like this, after water is piled, pressing handle 8, by realizing sealing by diaphragm seal 9 between handle 8 and the central shaft 7, can carry out hydrostatic test.Use the utility model, can not be subjected to the influence of waste heat boiler module tubes joint dense degree on the one hand, still can carry out the hydraulic testing, make on the other hand when making pipe adapter, need not to leave the hydraulic pressure surplus, save starting material, also solved the groove processing problems at the scarfing place that prescinds surplus simultaneously, need not to carry out again the groove processing of scarfing.
Embodiment 4: the utility model comprises the flange end cap 2 with center pit, fixedly connected with module tubes joint 11 along 3 uniform locating pieces 3 of module tubes joint 11 hoops, the flange 1 that center-hole diameter is more bigger than the external diameter of pipe adapter 11, top and middle part have the central shaft 7 of the hollow of screw thread, internal diameter is slightly larger than central shaft 7, external diameter is slightly less than the pressing plate 10 of pipe adapter 11, seal block 5 between flange end cap 2 and pressing plate 10, gland nut 6 is connected with the screw thread at the middle part of central shaft 7, flange end cap 2 is fixedlyed connected with flange 1 by bolt connecting device 4, the center pit of flange 1 is provided with groove 12 identical with locating piece 3 quantity and that the position is complementary, groove 12 is slightly larger than locating piece 3, central shaft 7 passes the center pit of flange end cap 2, fixedly connected by engage thread at the top behind the center pit of seal block 5 and pressing plate 10, also comprise handle 8 and diaphragm seal 9, handle 8 is fixedlyed connected with the flange end cap at the afterbody of flange end cap 2, by diaphragm seal 9 sealings, handle 8 is a hollow at an end of flange end cap 2 between handle 8 and flange end cap 2.(referring to Fig. 1, Fig. 2)
In the present embodiment, by 3 locating pieces 3 of prepackage on the pipe adapter of waste heat boiler module, when carrying out hydrostatic test, groove 12 by flange 1 is inserted in locating piece 3 with flange 1, pack into back rotation 60 degree, flange 1 and pipe adapter 11 are fixed together, by bolt connecting device joint flange end cap 2 and flange 1, by gland nut 6 and central shaft 7 pressing plate 10 and seal block 5 are fixed together again and compress, make it sealing, the afterbody at central shaft is equipped with handle 8 simultaneously, and an end of handle 8 is a hollow, can come round with the center pit of central shaft 7, when water inlet, can emit the air in the module like this, after water is piled, pressing handle 8, by realizing sealing by diaphragm seal 9 between handle 8 and the central shaft 7, can carry out hydrostatic test.Use the utility model, can not be subjected to the influence of waste heat boiler module tubes joint dense degree on the one hand, still can carry out the hydraulic testing, make on the other hand when making pipe adapter, need not to leave the hydraulic pressure surplus, save starting material, also solved the groove processing problems at the scarfing place that prescinds surplus simultaneously, need not to carry out again the groove processing of scarfing.