CN201653499U - 浮子水位计的传感结构 - Google Patents

浮子水位计的传感结构 Download PDF

Info

Publication number
CN201653499U
CN201653499U CN2010201409728U CN201020140972U CN201653499U CN 201653499 U CN201653499 U CN 201653499U CN 2010201409728 U CN2010201409728 U CN 2010201409728U CN 201020140972 U CN201020140972 U CN 201020140972U CN 201653499 U CN201653499 U CN 201653499U
Authority
CN
China
Prior art keywords
pulley
float
steel rope
log
records
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201409728U
Other languages
English (en)
Inventor
王震庄
熊光亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Nari Technology Co Ltd
State Grid Electric Power Research Institute
Original Assignee
State Grid Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Electric Power Research Institute filed Critical State Grid Electric Power Research Institute
Priority to CN2010201409728U priority Critical patent/CN201653499U/zh
Application granted granted Critical
Publication of CN201653499U publication Critical patent/CN201653499U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Level Indicators Using A Float (AREA)

Abstract

本实用新型公开了一种浮子水位计的传感结构,包括一计程轮、一钢丝绳、一重锤、一浮子,和三个滑轮,即第一滑轮、第二滑轮和第三滑轮,其中第一滑轮和第二滑轮平行设置在计程轮的侧上方并固定在水位计上,而第三滑轮则设置在水面以下,与水位计的旋转编码器同轴连接,且第一滑轮和第二滑轮的外边距与第三滑轮的直径相等,重锤位于第三滑轮的正下方,其通过钢丝吊装在第三滑轮的正中心,而钢丝绳则经过浮子上端、第一滑轮、计程轮、第二滑轮、第三滑轮和浮子的下端形成闭合回路。本实用新型实现了钢丝绳形成闭合回路,保证了计程轮两侧的钢丝绳重量基本一致,有效降低了因行程轮左右钢丝绳重量变化引起的测量误差,保证了测量精度。

Description

浮子水位计的传感结构
技术领域
本实用新型涉及一种浮子水位计的传感结构,属于传感器技术领域。
背景技术
在水文自动测报领域,浮子水位计由于结构简单、价格低廉及安装方便得到了广泛应用,全国现有的水文自动测报系统中,浮子水位计总的应用比例超过了50%,大大高于其它类型的传感器。
图1为传统的浮子水位计的传感结构,如图1所示:传统的浮子水位计的传感结构包括一个计程轮1、一个浮子4、一个重锤3及一根钢丝绳2,浮子4浮在水面5上,浮子4的上端连接有钢丝绳2,钢丝绳2绕过计程轮1与重锤3相连,这种传感结构无法消除因计程轮1两侧钢丝绳2本身的重量造成的测量误差,这是因为当水位变化时,会带动浮子4上升或下降,计程轮1两端的钢丝绳2的重量也在变化,从而导致计程轮1实际转动的位移和实际水位变化值不等,水位变幅越大,那么要求钢丝绳2的长度越长,水位计因钢丝绳在满量程范围内的绝对误差就越大,按照理论可以计算出,对于水位变幅达40米的情况,采用这种传感结构因钢丝绳2重量不平衡导致的误差能达到近5公分。
实用新型内容
为了克服现有技术的不足,本实用新型的目的在于提供一种能够有效消除因计程轮两端钢丝绳重量不一致导致的测量误差的浮子水位计的传感结构。
本实用新型是通过以下技术方案来实现的:
一种浮子水位计的传感结构,包括一计程轮、一钢丝绳、一重锤和一浮子,其特征在于,还包括三个滑轮,即第一滑轮、第二滑轮和第三滑轮,其中第一滑轮和第二滑轮平行设置在计程轮的侧上方并固定在水位计上,而第三滑轮则设置在水面以下,与水位计的旋转编码器同轴连接,且第一滑轮和第二滑轮的外边距与第三滑轮的直径相等,此外,上述重锤位于第三滑轮的正下方,其通过钢丝吊装在第三滑轮的正中心,而上述的钢丝绳则经过浮子上端、第一滑轮、计程轮、第二滑轮、第三滑轮和浮子的下端形成闭合回路。
本实用新型的有益效果是:本实用新型通过在水位计上加装三个滑轮以实现钢丝绳能够形成闭合回路,从而实现了计程轮两侧的钢丝绳重量基本保持一致,有效降低了因行程轮左右钢丝绳重量变化引起的测量误差,大大保证了测量精度。
附图说明
图1为传统的浮子水位计的传感结构的结构示意图;
图2为本实用新型一实施例的结构示意图。
图中主要附图标记含义为:
1、计程轮  2、钢丝绳    3、重锤      4、浮子
5、水面    6、第一滑轮  7、第二滑轮  8、第三滑轮
具体实施方式
下面将结合附图,详细说明本实用新型的具体实施方式:
图2为本实用新型一实施例的结构示意图。
如图2所示:浮子水位计的传感结构,包括一计程轮1、一钢丝绳2、一重锤3、一浮子4和三个滑轮,即第一滑轮6、第二滑轮7和第三滑轮8,其中第一滑轮6和第二滑轮7平行设置在计程轮1的侧上方并固定在水位计上,而第三滑轮8则设置在水面5以下,与水位计的旋转编码器同轴连接,且第一滑轮6和第二滑轮7的外边距与第三滑轮8的直径相等,重锤3位于第三滑轮8的正下方,其通过钢丝吊装在第三滑轮8的正中心,而上述的钢丝绳2则经过浮子4上端、第一滑轮6、计程轮1、第二滑轮7、第三滑轮8和浮子4的下端形成闭合回路。
在测量过程中,浮子水位计安装在需要测量的位置,三个滑轮的位置固定不动,第三滑轮8下方的重锤3的位置也固定不变,当水位静止不动时,计程轮1两侧的钢丝绳2的长度基本完全相等,当水位上升或下降时,会带动浮子4一起上升或下降,钢丝绳2也会围绕计程轮1随之进行逆时针或顺时针转动,但是由于钢丝绳2形成了一个闭环结构,计程轮1两侧的钢丝绳2的长度随着水位的上升或下降并不会有任何改变,这样钢丝绳2附加在计程轮1两端的力是平衡的,也就是说计程轮1的转动位移不再会受到两侧钢丝绳2的重量差值的影响,因此采用本实用新型可以更精确的反映水位的变化值。
以上已以较佳实施例公开了本实用新型,然其并非用以限制本实用新型,凡采用等同替换或者等效变换方式所获得的技术方案,均落在本实用新型的保护范围之内。

Claims (1)

1.一种浮子水位计的传感结构,包括一计程轮(1)、一钢丝绳(2)、一重锤(3)和一浮子(4),其特征在于,还包括三个滑轮,即第一滑轮(6)、第二滑轮(7)和第三滑轮(8),其中第一滑轮(6)和第二滑轮(7)平行设置在计程轮(1)的侧上方并固定在水位计上,而第三滑轮(8)则设置在水面(5)以下,与水位计的旋转编码器同轴连接,且第一滑轮(6)和第二滑轮(7)的外边距与第三滑轮(8)的直径相等,此外,上述重锤(3)位于第三滑轮(8)的正下方,其通过钢丝吊装在第三滑轮(8)的正中心,而上述的钢丝绳(2)则经过浮子(4)上端、第一滑轮(6)、计程轮(1)、第二滑轮(7)、第三滑轮(8)和浮子(4)的下端形成闭合回路。
CN2010201409728U 2010-03-24 2010-03-24 浮子水位计的传感结构 Expired - Lifetime CN201653499U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201409728U CN201653499U (zh) 2010-03-24 2010-03-24 浮子水位计的传感结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201409728U CN201653499U (zh) 2010-03-24 2010-03-24 浮子水位计的传感结构

Publications (1)

Publication Number Publication Date
CN201653499U true CN201653499U (zh) 2010-11-24

Family

ID=43118742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201409728U Expired - Lifetime CN201653499U (zh) 2010-03-24 2010-03-24 浮子水位计的传感结构

Country Status (1)

Country Link
CN (1) CN201653499U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103867379A (zh) * 2014-03-06 2014-06-18 天津大学 防缆绳松弛型浮子式波浪能发电系统

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103867379A (zh) * 2014-03-06 2014-06-18 天津大学 防缆绳松弛型浮子式波浪能发电系统

Similar Documents

Publication Publication Date Title
CN202126378U (zh) 土壤水分蒸腾与渗漏测量装置
CN204064172U (zh) 多种农作物株高测量器
CN201867228U (zh) 浮子式量水堰仪
CN201653499U (zh) 浮子水位计的传感结构
CN203364924U (zh) 一种太阳能热水器水位、水温检测装置
CN203455360U (zh) 一种一体式风速风向仪
CN203286970U (zh) 一种用于检测空间角度的装置
CN201107252Y (zh) 油水界面测量仪
CN201672954U (zh) 机电式高精度液位测量仪
CN207881798U (zh) 一种浮子水位计
CN203572483U (zh) 一种倾角测量仪
CN201828314U (zh) 一种大量程高精度双筒式地下水位计
CN102252726A (zh) 一种发动机油耗测量装置及方法
CN206990065U (zh) 一种水利工程水位检测装置
CN1560558A (zh) 双向引张线装置
CN201358475Y (zh) 灌注桩混凝土标高检测器
CN209945291U (zh) 新型风电塔筒体椭圆度测量装置
CN202379637U (zh) 一种塔式起重机回转角度测量装置
CN201599024U (zh) 浮子水位计
CN203587187U (zh) 磁感应浮子水位计
CN109186704B (zh) 蒸发量自动测量方法与装置
CN2869806Y (zh) 用于测量水位变化的水位计
CN102426044B (zh) 水力浮动式升船机浮筒内液位测量系统
CN201680891U (zh) 一种精确计量沥青流量的装置
CN203385876U (zh) 采用编码器检测的雨量计

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: STATE GRID ELECTRIC POWER RESEARCH INSITITUTE

Effective date: 20130709

Owner name: STATE GRID ELECTRIC POWER RESEARCH INSITITUTE NANJ

Free format text: FORMER OWNER: NANJING NARI CO., LTD.

Effective date: 20130709

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210003 NANJING, JIANGSU PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130709

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: State Grid Electric Power Research Insititute

Patentee after: Nanjing Nari Co., Ltd.

Address before: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003

Patentee before: State Grid Electric Power Research Insititute

Patentee before: Nanjing Nari Co., Ltd.

TR01 Transfer of patent right

Effective date of registration: 20171206

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee after: State Grid Electric Power Research Insititute

Patentee after: State Grid Corporation of China

Co-patentee after: NARI Technology Development Co., Ltd.

Address before: 100031 Beijing, Xicheng District China

Co-patentee before: State Grid Electric Power Research Insititute

Patentee before: State Grid Corporation of China

Co-patentee before: Nanjing Nari Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20101124

CX01 Expiry of patent term