CN201651596U - Mine multi-core tube rubber tube - Google Patents

Mine multi-core tube rubber tube Download PDF

Info

Publication number
CN201651596U
CN201651596U CN2009202775517U CN200920277551U CN201651596U CN 201651596 U CN201651596 U CN 201651596U CN 2009202775517 U CN2009202775517 U CN 2009202775517U CN 200920277551 U CN200920277551 U CN 200920277551U CN 201651596 U CN201651596 U CN 201651596U
Authority
CN
China
Prior art keywords
core pipe
core
sebific duct
assembly
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202775517U
Other languages
Chinese (zh)
Inventor
张涛华
张小明
生凯章
刘均
杨文�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Aerospace beacon Servo Control Technology Co., Ltd.
Original Assignee
FENGHUO MACHINE WORKS OF CHINA AEROSPACE SCIENCE AND TECHNOLOGY Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FENGHUO MACHINE WORKS OF CHINA AEROSPACE SCIENCE AND TECHNOLOGY Corp filed Critical FENGHUO MACHINE WORKS OF CHINA AEROSPACE SCIENCE AND TECHNOLOGY Corp
Priority to CN2009202775517U priority Critical patent/CN201651596U/en
Application granted granted Critical
Publication of CN201651596U publication Critical patent/CN201651596U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)

Abstract

The utility model discloses a mine multi-core tube rubber tube, which comprises a positioning disc (1), a clamping chuck (2), a tail coupling (3), a fixing sleeve (4), a screwed clamping sleeve (6), a quick-acting coupling (7), a core tube assembly (8), a positioning pin (9) and a rubber tube assembly (10). The core tube assembly (8) is arranged inside the rubber tube assembly (10) in sequence; the positioning disc (1), the clamping chuck (2), the fixing sleeve (4) and the screwed clamping sleeve (6) fix the ends of core tubes at the two ends of the rubber tube in sequence to limit the vertical and horizontal movement of the core tube assembly (8); and the quick-acting coupling (7) connects the two ends of the multi-core tube rubber tube with the joint of a hydraulic support system. The mine multi-core tube rubber tube has the advantages that a plurality of core tubes are mounted in the rubber tube, and the small core rubber is protected by wrapping with the large rubber pipe outside, so as to greatly reduce the damage of the core tubes by the downhole environment.

Description

Mining multi-core pipe sebific duct
Technical field
The utility model relates to a kind of mining multi-core pipe sebific duct of coal mine fully-mechanized mining support apparatus, particularly a kind of hydraulic support.
Background technique
High-pressure rubber pipe is widely used in the machinery such as mine, metallurgy, chemical industry, and especially down-hole fully-mechanized mining equipment and engineering machinery are used more general.The all hydraulic pipeline of coal mine fully-mechanized mining and high-grade conventional mining support apparatus is made up of sebific duct and associated pipe auxiliary substantially.Mining hose is the important control channel of the adjacent frame control system of hydraulic support, and it connects the control chamber of this hydraulic support pilot valve active chamber and adjacent frame main valve selector valve.
Present sebific duct specifications and models are many, and use amount is very big, and the fault form of expression of sebific duct is also many, the reason complexity.In working surface and tunnel, the pressure duct that hundreds of rice is long, exposed, any fault all may increase potential safety hazard, and fault will directly cause working surface to be shut down, and influence manufacturing efficiency, increase maintenance cost; In addition, under rugged environment, change sebific duct, inevitable contaminated system, the potential faults of other links of increase system reduces the reliability and the efficient of whole hydraulic system.And down-hole actual conditions environment is more abominable, complex circuit, a large amount of sebific ducts messy unordered, take up room big, the inconvenience management.
The model utility content
The purpose of this utility model is, overcomes the deficiencies in the prior art, provides good, the easy and simple to handle hydraulic support of a kind of core pipe safety protection mining multi-core pipe sebific duct.
Technical solution of the present utility model is: mining multi-core pipe sebific duct comprises positioning disk, chuck, tail joint, fixed cover, screw thread cutting ferrule, rapid pipe joint, core pipe assembly, locating stud and hose assembly; The core pipe assembly is arranged in the hose assembly in order; Positioning disk is fixedlyed connected by locating stud with chuck; Positioning disk, chuck, fixed cover and screw thread cutting ferrule are fixed on the sebific duct two ends in order with the core pipe end; Positioning disk and chuck restriction core pipe assembly up and down and about move, fixed cover moves Vertical direction fixed core pipe assembly; Cover tail joint in the screw thread cutting ferrule; Rapid pipe joint is enclosed within outside the screw thread cutting ferrule, and rapid pipe joint is connected multi-core pipe sebific duct two ends with the joint of hydraulic bracket system.
The quantity of described core pipe assembly is 6~24.
The lower end of described tail joint connects an elbow assembly by the draw-in groove form.
The rated pressure of described core pipe assembly is greater than 60Mp, and booster pressure is greater than 120Mp.
The utility model advantage compared with prior art is:
(1) mining multi-core pipe sebific duct is installed between the control chamber of the pilot valve of hydraulic support and main valve selector valve, reaches to link up pilot valve active chamber and selector valve control chamber.Selector valve and then control set corresponding action by every little core management and control system correspondence.Mining multi-core pipe sebific duct of the present utility model is that many core pipes are contained in the sebific duct, and the effect of the little core glue of protection is played with big sebific duct parcel in the outside, greatly reduces the damage of down-hole actual environment to the core pipe.
(2) the core pipe of mining multi-core pipe sebific duct of the present utility model, what all adopt is high pressure core pipe, rated pressure reaches 60Mp, and booster pressure is up to 120Mp.The normally used emulsified liquid pressure of support apparatus is 31.5Mp under the coal mine, and this mining multi-core pipe sebific duct can reach the down-hole high pressure usage requirement fully.
(3) because there are fixing device and positioning device in sebific duct of the present utility model two ends, improve installation efficiency, accomplished every core pipe plug-in mounting simultaneously, simple to operation.
(4) sebific duct of the present utility model integrates many little core pipes, according to arranging in proper order, thereby save space and sebific duct and avoid messy unordered, the actual conditions environment is more abominable in the down-hole, the core pipe of this multi-core pipe is to be contained in the sebific duct the inside, has avoided the phenomenon that pipeline is scattered, inconvenience is managed.
Description of drawings
Fig. 1 is the schematic representation of the mining multi-core pipe sebific duct of the utility model;
Fig. 2 is the plan view of the mining multi-core pipe sebific duct of the utility model.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
As shown in Figure 1, 2, mining multi-core pipe sebific duct of the present utility model comprises positioning disk 1, chuck 2, tail joint 3, fixed cover 4, screw thread cutting ferrule 6, rapid pipe joint 7, core pipe assembly 8, locating stud 9 and hose assembly 10.
Core pipe assembly 8 is arranged in the hose assembly 10 in order, and the positioning disk 1 at sebific duct two ends, chuck 2, fixed cover 4 and screw thread cutting ferrule 6 are fixed on the sebific duct two ends in order with the core pipe end.Positioning disk 1 is fixedlyed connected by locating stud 9 with chuck 2; Positioning disk 1 and chuck 2 restriction core pipe assemblies 8 about and about move, fixed cover 4 is mobile Vertical direction fixed core pipe assembly 8.Cover tail joint 3 in the screw thread cutting ferrule 6; Rapid pipe joint 7 is enclosed within outside the screw thread cutting ferrule 6; Rapid pipe joint 7 is connected multi-core pipe sebific duct two ends with the joint of hydraulic bracket system, position with positioning screwn during connection, to determine the conformity of every core pipe assembly 8 orders, thereby allow pilot valve active chamber and selector valve control chamber, corresponding one by one by core pipe assembly 8, make each pilot valve control corresponding selector valve.
In the lower end of tail joint 3, connect an elbow assembly 5 by the draw-in groove form, the installation when being convenient to the sebific duct bending.
Location when locating stud 9 also is used for sebific duct and is connected with the hydraulic bracket system joint.
The quantity of the utility model core pipe assembly 8 can be 6~24, is 12 in the present embodiment.
In the present embodiment, the rated pressure of core pipe assembly 8 is greater than 60Mp, and booster pressure is greater than 120Mp.
Mining multi-core pipe sebific duct of the present utility model is contained in many core pipes in the sebific duct, and the effect of the little core glue of protection is played with big sebific duct parcel in the outside, greatly reduces the damage of down-hole actual environment to the core pipe.Simultaneously, the normally used emulsified liquid pressure of support apparatus is 31.5Mp under the coal mine, and this mining multi-core pipe sebific duct can reach the down-hole high pressure usage requirement fully.
Certainly, under the situation that does not change its function, the equivalent transformation that carries out or alternative also falls into protection domain of the present utility model to each constituent elements of the present utility model, position relation and Placement.The part that the utility model does not elaborate belongs to techniques well known.

Claims (4)

1. mining multi-core pipe sebific duct is characterized in that: comprise positioning disk (1), chuck (2), tail joint (3), fixed cover (4), screw thread cutting ferrule (6), rapid pipe joint (7), core pipe assembly (8), locating stud (9) and hose assembly (10); Core pipe assembly (8) is arranged in the hose assembly (10) in order; Positioning disk (1) is fixedlyed connected by locating stud (9) with chuck (2); Positioning disk (1), chuck (2), fixed cover (4) and screw thread cutting ferrule (6) are fixed on the sebific duct two ends in order with the core pipe end; Positioning disk (1) and chuck (2) restriction core pipe assembly (8) up and down and about move, fixed cover (4) moves Vertical direction fixed core pipe assembly (8); Cover tail joint (3) in the screw thread cutting ferrule (6); Rapid pipe joint (7) is enclosed within outside the screw thread cutting ferrule (6), and rapid pipe joint (7) is connected multi-core pipe sebific duct two ends with the joint of hydraulic bracket system.
2. according to the mining multi-core pipe sebific duct of claim 1, it is characterized in that: the quantity of described core pipe assembly (8) is 6~24.
3. according to the mining multi-core pipe sebific duct of claim 1 or 2, it is characterized in that: the lower end of described tail joint (3) connects an elbow assembly (5) by the draw-in groove form.
4. according to the mining multi-core pipe sebific duct of claim 1 or 2, it is characterized in that: the rated pressure of described core pipe assembly (8) is greater than 60Mp, and booster pressure is greater than 120Mp.
CN2009202775517U 2009-12-18 2009-12-18 Mine multi-core tube rubber tube Expired - Lifetime CN201651596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202775517U CN201651596U (en) 2009-12-18 2009-12-18 Mine multi-core tube rubber tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202775517U CN201651596U (en) 2009-12-18 2009-12-18 Mine multi-core tube rubber tube

Publications (1)

Publication Number Publication Date
CN201651596U true CN201651596U (en) 2010-11-24

Family

ID=43116836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202775517U Expired - Lifetime CN201651596U (en) 2009-12-18 2009-12-18 Mine multi-core tube rubber tube

Country Status (1)

Country Link
CN (1) CN201651596U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114352813A (en) * 2021-12-06 2022-04-15 绵阳创格科技有限公司 Device for quick connection of multichannel pressure pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114352813A (en) * 2021-12-06 2022-04-15 绵阳创格科技有限公司 Device for quick connection of multichannel pressure pipe
CN114352813B (en) * 2021-12-06 2024-05-24 绵阳创格科技有限公司 Device for quick connection of multichannel pressure pipes

Similar Documents

Publication Publication Date Title
CN201651596U (en) Mine multi-core tube rubber tube
CN203515558U (en) Deep-well water source well water level monitoring technological pipe column
CN204852638U (en) A constant force spring gallows
CN207364665U (en) The cleaning of pipeline and low pressure gas check
CN212658125U (en) Cleaning device for cleaning tube of U-shaped heating furnace with collecting tube
CN204782200U (en) A adjustable high pressure vacuum circuit breaker support for steel pipe tower
CN215582374U (en) Data acquisition unit
CN201826879U (en) Manual pilot adjacent frame control system
CN203571286U (en) Bidirectional multi-channel oil way connector
CN205402084U (en) Mining pipe protection device in pit
CN204403772U (en) The online tonifying Qi detection device of circuit breaker
CN202755401U (en) Long-distance large-pipe-diameter underground water delivery main pipe system
CN208268793U (en) A kind of oil field mixed transporting tube line leak detecting device
CN210889854U (en) Aerial working platform braking elimination system
CN204215079U (en) A kind of optical cable is drawn and is connect distributing cabinet
CN205278564U (en) Hydraulic tubing ground mounting system
CN203231079U (en) Fast gas-filling device of SF6 switch
CN209589411U (en) Water hammer effect analyzer device
CN208652135U (en) A kind of CNG gas station sequential control disk
CN203460894U (en) Gas comprehensive analysis test platform car
CN215942696U (en) Positioning tool for repairing screw hole of normal-pressure cutter head cutter barrel of slurry balance shield machine
CN203161721U (en) Oil feeding-and-discharging integrated device of hydraulic-oil-cylinder horizontal-type testbed
CN210217799U (en) Hydraulic support and pushing telescopic linkage type hydraulic system
CN207373763U (en) 1000T steel cuttings cubers
CN201851882U (en) Filling and recovery apparatus for harmful gases

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 611130 No. 198 Liucheng Changan Road, Wenjiang District, Chengdu, Sichuan.

Patentee after: Sichuan Aerospace beacon Servo Control Technology Co., Ltd.

Address before: 611130 No. 2 letter box in Wenjiang District, Chengdu, Sichuan

Patentee before: Fenghuo Machine Works of China Aerospace Science and Technology Corporation

CP03 Change of name, title or address
CX01 Expiry of patent term

Granted publication date: 20101124

CX01 Expiry of patent term