CN201649669U - Climbing device with calibrating node mechanism - Google Patents
Climbing device with calibrating node mechanism Download PDFInfo
- Publication number
- CN201649669U CN201649669U CN2010201000487U CN201020100048U CN201649669U CN 201649669 U CN201649669 U CN 201649669U CN 2010201000487 U CN2010201000487 U CN 2010201000487U CN 201020100048 U CN201020100048 U CN 201020100048U CN 201649669 U CN201649669 U CN 201649669U
- Authority
- CN
- China
- Prior art keywords
- climbing device
- joint piece
- columns
- piece
- oblique top
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model provides a climbing device with a calibrating node mechanism for building engineering, which comprises a plurality of cylindrical objects circling on a first node, at least two lateral platforms vertical to the plurality of cylindrical objects and fixedly connected on at least one node, an outward oblique top part arranged on the plurality of cylindrical objects for assisting the alignment of the first node and a second node, and a driving mechanism, and the purpose that the plurality of cylindrical objects and at least two lateral platforms and the outer oblique top part climb on the first node can be achieved by driving at least two lateral platforms.
Description
Technical field
The utility model is the climbing device of using about a kind of construction work; Clearer and more definite, the utility model is that a kind of construction work is with having the climbing device of proofreading and correct joint piece mechanism.
Background technology
The Building technology of storehouse joint piece row year arranged, from entity joint piece storehouse shell joint piece storehouse finally in the past, except convenient on transporting and quick many, on the difficulty of storehouse and risk factor, also reduce many.But even so, the situation of skew was usually arranged still when storehouse joint piece in the past, the column structure that makes storehouse come out can't be very firm, so also caused the unstability of building.The utility model is to solve when storehouse joint piece the problem that the joint piece can't be alignd, and then the problem of solution structural instability.
The utility model content
The purpose of this utility model is to design a kind of the utilization when climbing device storehouse joint piece, can proofread and correct the mechanism of joint piece stack position simultaneously, and decapacitation was saved outside the time of proofreading and correct joint piece position, can also further strengthen the stability of stack architecture.
The utility model becomes to have an outer biassed fabric with its tip designs with traditional climbing device improvement for building, and the generation type of this structure is not only a kind of, wherein can by around the inclination cylinder, or around wedge structure formed.The utility model utilizes the error packet content when biassed fabric increases storehouse joint piece in addition, because climbing device for building is installed on the joint piece of institute's desire storehouse, so via improvement of the present utility model, on save piece and can aim at joint piece down more accurately, and then reach the stable of building structure.
The utility model provides a kind of construction work with having the climbing device of proofreading and correct joint piece mechanism, and comprise: a plurality of columns, at least two horizontal platforms, outer oblique top portion and driving mechanisms, wherein a plurality of columns are surrounded at least one joint piece.At least two horizontal platforms, vertical with these a plurality of columns, and be fixed on this at least one joint piece.Outer oblique top portion is arranged on these a plurality of columns, is used for auxiliary a first segment piece being saved block alignment with one second.Driving mechanism is by driving these at least two horizontal platforms, to reach the purpose that the outer oblique top of these a plurality of columns, these at least two horizontal platforms and this portion climbs on this at least one joint piece.
The utility model has the advantages that and utilizing when climbing device storehouse joint piece that can proofread and correct the mechanism of joint piece stack position simultaneously, decapacitation was saved outside the time of proofreading and correct joint piece position, can also further strengthen the stability of stack architecture.
Description of drawings
Fig. 1 illustrates the utility model construction work with having the schematic diagram of climbing device when the second joint piece is stacked over the first segment piece of proofreading and correct joint piece mechanism.
Fig. 2 illustrates the utility model construction work with having the schematic diagram of climbing device after the second joint piece is stacked over the first segment piece of proofreading and correct joint piece mechanism.
Fig. 3 illustrates the schematic diagram of construction work with climbing device storehouse joint piece of proofreading and correct joint piece mechanism that the utility model cooperates a tower crane to use.
Fig. 4 illustrates climbing device the side cross-sectional views when storehouse joint piece of construction work with correction joint piece mechanism that the utility model cooperates a tower crane to use.
Fig. 5 illustrates climbing device the side cross-sectional views storehouse joint piece after of construction work with correction joint piece mechanism that the utility model cooperates a tower crane to use.
Symbol description
300 have the climbing device of proofreading and correct joint piece mechanism
More than 101 column
103 first horizontal platforms
104 second horizontal platforms
105 first segment pieces
106 second joint pieces
107 outer oblique top portions
108 means for correctings
300 tower crane climbing devices
301 tower cranes
302 the 3rd horizontal platforms
303 slide rails
401 wedge structures
The specific embodiment
The utility model provides a kind of climbing device that is used for construction work, and wherein this kind climbing device of being used for construction work can be used for the joint piece of any type sample of storehouse.The top of the climbing device that this kind construction work is used is provided with an outer biassed fabric, and each avris wall position of the joint piece of can adjusting when storehouse and align is to reach building structure purpose stably.The specific embodiment of this kind climbing device will cooperate and graphicly further specify following.
Fig. 1 illustrates the utility model construction work with having the schematic diagram of climbing device when the second joint piece 106 is stacked over first segment piece 105 of proofreading and correct joint piece mechanism.This climbing device 100 has a plurality of columns 101 and is fixed on the joint piece, and wherein a plurality of columns 101 can be made by any material that is enough to loaded work piece weight, for example, and the metal of steel, iron, alloy and any other form.In addition, a plurality of columns 101 can be any, as nailing, be spirally connected and mode such as engaging is fixed on the joint piece.Connect the outer cant beam that presss from both sides a special angle with the second joint piece, 106 placing directions at each column top of these a plurality of columns 101, to form outer oblique top portion 107, and the cant beam inboard is provided with crane gear outside each of cant beam outside these are a little, after being stacked over first segment piece 105 at the second joint piece 106, further proofread and correct the means for correcting 108 of the second joint piece, 106 positions, to obtain more firm stack architecture.The storehouse mode that it is pointed out that Fig. 1 only is the usefulness of signal, might not be directly to storehouse, also can adopt the mode storehouse of horizontal or any other direction.
The second joint piece 106 is by any possible mode of hanging or raise, be moved to climbing device 100 tops of being fixed in stack architecture, then in the scope that the outer oblique top portion 107 of climbing device 100 is centered on, the second joint piece 106 is put down, 107 this moments just can be proofreaied and correct the joint piece by the outer oblique top portion of climbing device 100 when the joint piece moves down lateral attitude with 105 alignment of first segment piece, after the second joint piece 106 was placed in first segment piece 105, the maximum transversal error of the first segment piece 105 and the second joint piece 106 was the gap between a plurality of columns 101 and stack architecture.
Fig. 2 illustrates the utility model construction work with having the schematic diagram of climbing device after the second joint piece is stacked over the first segment piece of proofreading and correct joint piece mechanism.After storehouse shown in Figure 1 finishes, just can laterally promote the second joint piece 106 according to the second joint piece 106 and first segment piece 105 errors from second side of saving piece 106 by the means for correcting 108 of outer cant beam inboard, just can further the second joint piece 106 be dwindled with the error of first segment piece 105, to finish last storehouse program.Wherein, means for correcting 108 can be a jack, or other similar lifting gear.Then, this climbing device 100 rises to the end of stack architecture storehouse direction, and repeats aforesaid operations till stack architecture reaches desired height or length.The mode of wherein, climbing can adopt jacking, draw high and positioning guide rail or any other similar fashion are reached.In addition, this climbing device 100 needs at least two purposes that horizontal platform reaches jacking and draws high.First horizontal platform 103 utilizes the fixing counter-force that is provided of second horizontal platform 104 and stack architecture, be pulled up to the position approaching with second horizontal platform 104, and it is then that first horizontal platform 103 is fixing, the counter-force that provides second horizontal platform 104 to rise, start so repeatedly is with the purpose of reaching jacking and drawing high.
In the embodiment that uses the jacking mode, crane gear is arranged on each column in a plurality of columns 101, be positioned at the position of second horizontal platform, 104 belows.Earlier second horizontal platform 104 is fixed on the stack architecture and with a plurality of columns 101 and unclamps, with first horizontal platform 103 and a plurality of column 101 lockings.Then the end of crane gear towards second horizontal platform 104 is fixed on the stack architecture, extend then crane gear towards an end of first horizontal platform 103 to maximum length, the length that is fixed in a plurality of columns 101 and shortens crane gear is to move first horizontal platform 103 to the storehouse direction.So repeatable operation reaches minimum distance until first horizontal platform 103 and second horizontal platform 104, afterwards second horizontal platform 104 and stack architecture are unclamped and with a plurality of columns 101 lockings, then crane gear is fixing towards an end and second horizontal platform 104 of second horizontal platform 104, and be fixed in a plurality of columns 101 towards an end of first horizontal platform 103, and then extend crane gear so that the storehouse direction of second horizontal platform 104 toward stack architecture raised, outside this climbing device 100 rises to the joint of oblique top portion 107 and a plurality of columns 101 protrude in first segment piece 105 by the position of storehouse end, again second horizontal platform 104 is fixed on the stack architecture and and locks, to repeat above-mentioned stack manipulation with a plurality of columns 101.
Draw high among the embodiment of mode in use, crane gear is arranged on each column in a plurality of columns 101, be positioned at second horizontal platform, 104 tops, be adjacent to the position that a plurality of columns 101 and outer oblique top portion 107 join, and second horizontal platform, 104 belows, be connected with second horizontal platform 104.In addition, each crane gear all is provided with one and colludes the extension element, at first second horizontal platform 104 is fixed on the stack architecture and with a plurality of columns 101 and unclamps, first horizontal platform 103 is separated with a plurality of column 101 lockings and with stack architecture, then the crane gear of second horizontal platform, 104 belows is put down to collude towards an end of first horizontal platform 103 and hang element and hang element and collude and hang first horizontal platform 103 until colluding, then the crane gear of second horizontal platform, 104 belows will collude to hang on the element and draw, arrive and second horizontal platform, 104 immediate distances to draw high first horizontal platform 103, then second horizontal platform 104 is unclamped with stack architecture and with a plurality of columns 101 lockings, then will be positioned at second horizontal platform, 104 tops, the crane gear that is adjacent to a plurality of columns 101 and outer oblique top portion 107 connecting positions puts down hanging device towards an end of second horizontal platform 104 and hangs element and collude extension second horizontal platform 104 until colluding, then draw high second horizontal platform 104 until reaching 104 extreme higher positions that can reach of second horizontal platform, so repetitive operation, outside this climbing device 100 rises to the joint of oblique top portion 107 and a plurality of columns 101 protrude in first segment piece 105 by the position of storehouse end, to repeat above-mentioned stack manipulation.
Fig. 3 illustrates the schematic diagram of construction work with climbing device storehouse joint piece of proofreading and correct joint piece mechanism that the utility model cooperates a tower crane to use.The climbing device 300 with correction joint piece mechanism of the climbing device 300 that is illustrated among Fig. 3 for cooperating a tower crane 301 to use.This climbing device 300 is a kind of modification of the climbing device 100 that Fig. 1 and Fig. 2 illustrated.The climbing device 300 that Fig. 3 illustrated reaches the purpose of climbing by the cooperation start of slide rail 303 and guide 305.
The climbing device 300 that Fig. 3 illustrated is made flowing mode when climbing, can be considered two parts, wherein first partly is slide rail 303 and guide 305, and second part is tower crane 301, tower joint 304, first horizontal platform 103, second horizontal platform 104 and the 3rd horizontal platform 302.Wherein, slide rail 303 connects movably with guide 305, earlier slide rail 303 and guide 305 are locked mutually, and it is further affixed with stack architecture, afterwards just by the tower crane 301 of drive unit with second part, tower joint 304, first horizontal platform 103, second horizontal platform 104 and the 3rd horizontal platform 302 move on slide rail 303 is whole, wherein drive unit is any device that counter-force is provided, for example, jack, crane, scroll bar or other can provide the device of same function, after this climbing device 300 partly is raised to the position that needs with second, then partly be fixed in stack architecture with second, by same or other driving mechanism the slide rail 303 of first part is promoted to the height of needs afterwards again, whether the range estimation of sliding according to slide rail 303 needs and will move to slide rail 303 upper ends on the guide 305 bottom then, with further steady slide rail 303, by repeating above-mentioned steps to reach the purpose that this climbing device 300 climbs.It is pointed out that the quantity of guide 305 and the visual actual conditions of design of drive unit change, and are not limited to above-mentioned given example.In addition, the tower crane 301 that is used can be the tower crane 301 of the tower joint 304 with any group of number.
Fig. 4 illustrates climbing device the side cross-sectional views when storehouse joint piece of construction work with correction joint piece mechanism that the utility model cooperates a tower crane to use.As shown in Figure 4, the correction of this climbing device 300 joint piece mechanism is by being formed oblique top portion outside at setting of slide rail 303 upper ends and the wedge structure 401 that the second joint piece, 106 placing directions press from both sides a specific angle.After climbing device 300 is adjusted to proper height, just can begin to save the storehouse program of piece by tower crane 301, when tower crane 301 is positioned over the second joint piece 106 on the first segment piece 105, the second joint piece 106 is as misalignment first segment piece 105, the second joint piece 106 just can be proofreaied and correct because of the wedge structure 401 of conflict slide rail 303 upper ends and move down direction, thereby can aim at first segment piece 105, and then reach the purpose of proofreading and correct the joint piece.Fig. 5 illustrates climbing device the side cross-sectional views storehouse joint piece after of construction work with correction joint piece mechanism that the utility model cooperates a tower crane to use.After Fig. 5 illustrates climbing device 300 piece 106 is positioned over first segment piece 105 with second joint, accurately finish the situation of storehouse.
In sum, the utility model meets the condition of utility model patent, appropriately proposes patent application in accordance with the law.Only, more than only be preferred embodiment of the present utility model, be familiar with the personage of this case skill such as, the equivalence of being done according to the utility model spirit in the whence is modified or is changed, all Ying Han is placed in the claim scope.
Claims (8)
1. a construction work is characterized in that comprising with having the climbing device of proofreading and correct joint piece mechanism:
A plurality of columns are surrounded on the first segment piece;
At least two horizontal platforms are vertical with a plurality of columns;
One outer oblique top portion is arranged on a plurality of columns, is used for auxiliary the first segment piece being saved block alignment with one second;
One driving mechanism is by driving at least two horizontal platforms, so that a plurality of column, at least two horizontal platforms and outer oblique top portion climb on the first segment piece.
2. climbing device according to claim 1 is characterized in that outer oblique top portion is formed by the wedge structure that presss from both sides an angle with the second joint piece placing direction is set at a plurality of columns top.
3. climbing device according to claim 1 is characterized in that outer oblique top portion is formed by the outer cant beam that presss from both sides an angle with the second joint piece placing direction is set at a plurality of columns top.
4. climbing device according to claim 3, each the outer cant beam inboard that it is characterized in that outer oblique top portion further is provided with as the refitting together of means for correcting puts, and is used for the second joint piece alignment first segment piece.
5. climbing device according to claim 1 is characterized in that driving mechanism comprises to reset together to be equipped with, and in the mode that raises, makes a plurality of columns, at least two horizontal platforms and outer oblique top portion climb at least one joint piece.
6. climbing device according to claim 1 is characterized in that driving mechanism comprises to reset together to be equipped with, and in the mode that draws high, makes a plurality of columns, at least two horizontal platforms and outer oblique top portion climb at least one joint piece.
7. climbing device according to claim 1 is characterized in that a plurality of columns can further cooperate a tower crane to be installed in a plurality of columns top and be used.
8. climbing device according to claim 7 is characterized in that tower crane can have one or more tower joint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201000487U CN201649669U (en) | 2010-01-22 | 2010-01-22 | Climbing device with calibrating node mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201000487U CN201649669U (en) | 2010-01-22 | 2010-01-22 | Climbing device with calibrating node mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201649669U true CN201649669U (en) | 2010-11-24 |
Family
ID=43114898
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201000487U Expired - Lifetime CN201649669U (en) | 2010-01-22 | 2010-01-22 | Climbing device with calibrating node mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201649669U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113895887A (en) * | 2021-10-28 | 2022-01-07 | 中国十九冶集团有限公司 | Large-tonnage object horizontal pushing structure and blast furnace follow-up reverse pushing method |
-
2010
- 2010-01-22 CN CN2010201000487U patent/CN201649669U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113895887A (en) * | 2021-10-28 | 2022-01-07 | 中国十九冶集团有限公司 | Large-tonnage object horizontal pushing structure and blast furnace follow-up reverse pushing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207633222U (en) | Bridge pier binder Coping Construction platform | |
CN102877547B (en) | Steel net rack installation method for integrally improving high-altitude moving and positioning | |
CN102912736B (en) | Vertical assembling construction method for trussed arch bridge | |
CN205713147U (en) | A kind of quick positioning apparatus of precast floor slab | |
CN106320713B (en) | 3D building printing operation platform | |
CN106662075B (en) | Assembly system and method for assembling a tower of a wind turbine | |
CN105507161A (en) | Walking pushing equipment with deviation rectifying function | |
CN101974977A (en) | Pulley bracket platform with large-column-grid and large-area grid structure and construction method thereof by utilizing pulley bracket method | |
CN201649669U (en) | Climbing device with calibrating node mechanism | |
CN103741719B (en) | Steel reinforcement cage guiding movement system and method | |
CN105563834A (en) | Block distributed type multi-printing-head 3D printing device with parallel-connection transverse beams and printing method | |
CN201874583U (en) | Initiating device for shield machine | |
CN107853921A (en) | It is provided with the bed frame of Aluminum alloy crossbeam | |
CN109505411A (en) | Tube truss structure roofing installation method | |
CN203462736U (en) | Operating platform for lift shaft structural steel construction | |
CN111535188A (en) | Guide rail type mounting system of steel cable tower | |
CN202881858U (en) | Jig frame used for vertical assembly construction of truss arc bridge | |
CN201900636U (en) | Mobile elastic floating support frame | |
CN212316696U (en) | Guide rail type mounting system of steel cable tower | |
CN202706899U (en) | Movable steel ladder for super-high walls | |
CN214995951U (en) | Jacking limiting device of slip form system | |
CN210917052U (en) | Large-tonnage pushing device | |
CN205777406U (en) | High stability traveling centering | |
CN209873548U (en) | Box girder end part structure convenient for pier mounting | |
CN202164547U (en) | Bracket system for concrete pouring of bridge contact network platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20101124 |
|
CX01 | Expiry of patent term |