CN201649139U - Cast-in-place pile loading test inner force testing device - Google Patents
Cast-in-place pile loading test inner force testing device Download PDFInfo
- Publication number
- CN201649139U CN201649139U CN2010201886549U CN201020188654U CN201649139U CN 201649139 U CN201649139 U CN 201649139U CN 2010201886549 U CN2010201886549 U CN 2010201886549U CN 201020188654 U CN201020188654 U CN 201020188654U CN 201649139 U CN201649139 U CN 201649139U
- Authority
- CN
- China
- Prior art keywords
- test
- pile
- survey
- pipe
- adjacent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a cast-in-place pile loading test inner force testing device, comprising two test pipes pre-embedded in the test pile longitudinally and symmetrically and extending out of the head of the test pile, the test pipe is formed by connecting a plurality of test pipe units, a test ring is arranged at the connection point of two adjacent test pipe units, a strain measuring probe sliding along the test pipe is arranged between two adjacent test rings. a strong all-purpose adhesive is coated at the joint of two adjacent test pipe units, a PVC electric flame-retardant adhesive tape and a high-voltage insulated self-adhesive tape are wound at the seam of two adjacent test pipe units. the change of the distance between two adjacent test rings on the test pipe embedded in the test pile is tested by the strain test probe to obtain the strain of the concrete between two test rings, then the pile side resistance and end resistance are calculated through the obtained strain according to the elastic theory. The cast-in-place pile loading test inner force testing device has simple structure, a large number of data acquisition and high reliability, is not easy to be destroyed, and is easy to be popularized.
Description
Technical field
The utility model relates to a kind of drill-pouring pile loading test internal force testing arrangement.
Background technology
At present, in new building thing, new construction of structures, bored pile is the base form of using always, can make Pile Foundations Design safety, economy, rationally according to the internal force test result.The internal force test of bored pile, normally adopt reinforcing bar meter method, promptly in pile body, bury reinforcing bar underground by soil depth, the concrete strain of stressed further calculating by the test result calculations reinforcing bar, obtain the size of collateral resistance and end resistance again, therefore, reinforcing bar meter method is a kind of indirect strain testing method.Have in the pile concrete filling process and to damage cable easily and test less than data, working environment and demarcation environment and inconsistently cause test error, bury negligible amounts underground and complete distribution, the calculating parameter that can not react collateral resistance such as is difficult for accurately determining at shortcoming.
The utility model content
The purpose of this utility model is to overcome above-mentioned deficiency of the prior art, and a kind of drill-pouring pile loading test internal force testing arrangement is provided.By strain testing probe test be embedded on the survey pipe in the test pile pile body adjacent two survey ring spacings from variation can draw two and survey the strains that the interannular concrete take place, calculate pile side resistance and end resistance by the strain that records by elastic theory again, it is simple in structure, easy to use, certainty of measurement is high.
For achieving the above object, the technical solution adopted in the utility model is: drill-pouring pile loading test internal force testing arrangement, comprise that vertical symmetry is embedded in the test pile pile body and two of pile crown that stretch out test pile survey pipe, described survey pipe is surveyed pipe unit by several and is formed by connecting, be provided with a survey ring in described adjacent two junctions of surveying pipe unit, being provided with at adjacent two survey interannulars can be along the strain testing probe of surveying the pipe slip.
Aforesaid drill-pouring pile loading test internal force testing arrangement, the length of described survey pipe unit is 1m.
Above-mentioned drill-pouring pile loading test internal force testing arrangement evenly is coated with strength universal glue in described adjacent two joints of surveying pipe unit, twines electric non-flammable adhesive tape of PVC and High-Voltage Insulation self-adhesive tape at described adjacent two seam crossings of surveying pipe unit.
The utility model compared with prior art has the following advantages: vertically two of symmetric arrangement are surveyed pipe in the test pile pile body, by strain testing probe test be embedded on the survey pipe in the test pile pile body adjacent two survey ring spacings from variation can draw two and survey the strains that the interannular concrete take place, calculate pile side resistance and end resistance by the strain that records by elastic theory again.Simultaneously, in surveying pipe, have one and survey ring, therefore can utilize the strain testing probe directly to measure the variation relation of strain continuous in the pile body with the degree of depth every 1m.It is big to the utlity model has the data acquisition amount, and the characteristics that the strain testing precision is high are surveyed pipe and had higher intensity, when concrete perfusion, be difficult for destroyed, good reliability.And survey being symmetrical arranged of pipes for two, the strain testing result is averaged to eliminate load eccentric influence, it is simple in structure, easy to use, be convenient to promote the use of.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 surveys the structural representation of pipe for the utility model.
Fig. 3 is adjacent two structural representations of surveying the pipe unit junction of the utility model.
Fig. 4 is a connection diagram of surveying pipe and reinforcing cage when implementing the utility model.
The position of the concrete surface that pours in clear water that Fig. 5 injects in surveying pipe when being enforcement the utility model and the test pile concerns schematic diagram.
Description of reference numerals:
The 1-test pile; 2-surveys pipe; 3-surveys ring; 4-strain testing probe; The 5-pile crown;
The 6-foundation soil; 7-strength universal glue; Electric non-flammable adhesive tape of 8-PVC and High-Voltage Insulation self-adhesive tape;
The 9-reinforcing cage; The 10-clear water; The 11-concrete surface; 12-surveys pipe unit.
The specific embodiment
A kind of drill-pouring pile loading test internal force testing arrangement as shown in Figure 1, comprise that vertical symmetry is embedded in test pile 1 pile body and two of pile crown 5 that stretch out test pile 1 survey pipe 2, described test pile 1 is embedded in the foundation soil 6, and test pile 1 stretches out foundation soil 6, the end of test pile 1 is a pile crown 5, described survey pipe 2 is surveyed pipe unit 12 by several and is formed by connecting, and the length of described survey pipe unit 12 can be 1m.Be provided with a survey ring 3 in described adjacent two junctions of surveying pipe unit 12, as shown in Figure 2, survey 3 on ring at adjacent two and be provided with and manage the 2 strain testing probes 4 that slide along surveying.As shown in Figure 3, evenly be coated with strength universal glue 7, twine electric non-flammable adhesive tape of PVC and High-Voltage Insulation self-adhesive tape 8 at described adjacent two seam crossings of surveying pipe unit 12 in described adjacent two joints of surveying pipe unit 12.
The operating principle of the utility model drill-pouring pile loading test internal force testing arrangement is: when test, concrete generation strain in test pile 1 pile body, also can drive the survey ring of surveying in the pipe 23 micro-displacement takes place, the variation of measuring 3 distances of two survey rings can draw two and survey the strain that the interannular concrete takes place.During the internal force test, strain testing probe 4 is put into survey pipe 2, block two adjacent surveys and encircle the tension of 3 lower ends, can obtain the strain measurement value, slip strain testing probe 4 in surveying pipe 2 can record the change curve of strain continuous in the test pile 1 with the degree of depth continuously.Two strain values that same depth is recorded average the mean strain that promptly obtains this degree of depth place, calculate pile side resistance and end resistance by the strain that records by elastic theory again.
As shown in Figure 3, survey the precision that pipe 2 quality of burying quality underground directly have influence on test, need to guarantee to survey pipe 2 free from admixtures, not contaminated, cement paste enters and surveys pipe 2 when especially being strictly on guard against concrete spouting.Connect when surveying pipe unit 12, evenly smear strength universal glue 7, twine three circle electric non-flammable adhesive tapes of PVC and three circle High-Voltage Insulation self-adhesive tapes 8 at adjacent two seam crossings of surveying pipe unit 12 in adjacent two joints of surveying pipe unit 12; Behind the stake pore-forming, transfer in the process at reinforcing cage 9, as shown in Figure 4, will survey pipe 2 symmetrical colligations on reinforcing cage 9; Before concrete perfusion, as shown in Figure 5, in surveying pipe 2, fill with clear water 10, guarantee to survey pipe 2 interior head height greater than concrete surface 11 height.
The above; it only is preferred embodiment of the present utility model; be not that the utility model is imposed any restrictions; every according to the utility model technical spirit to any simple modification, change and equivalent structure transformation that above embodiment did, all still belong in the protection domain of technical solutions of the utility model.
Claims (3)
1. drill-pouring pile loading test internal force testing arrangement, it is characterized in that: comprise that vertical symmetry is embedded in test pile (1) pile body and two of pile crown (5) that stretch out test pile (1) survey pipe (2), described survey pipe (2) is surveyed pipe unit (12) by several and is formed by connecting, be provided with a survey in the junctions of described adjacent two survey pipe units (12) and encircle (3), survey at adjacent two and be provided with the strain testing probe (4) that to manage (2) slip along survey between ring (3).
2. drill-pouring pile loading test internal force testing arrangement according to claim 1, it is characterized in that: the length of described survey pipe unit (12) is 1m.
3. drill-pouring pile loading test internal force testing arrangement according to claim 1 and 2, it is characterized in that: evenly be coated with strength universal glue (7) in described adjacent two joints of surveying pipe unit (12), twine electric non-flammable adhesive tape of PVC and High-Voltage Insulation self-adhesive tape (8) at described adjacent two seam crossings of surveying pipe unit (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201886549U CN201649139U (en) | 2010-05-13 | 2010-05-13 | Cast-in-place pile loading test inner force testing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201886549U CN201649139U (en) | 2010-05-13 | 2010-05-13 | Cast-in-place pile loading test inner force testing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201649139U true CN201649139U (en) | 2010-11-24 |
Family
ID=43114367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201886549U Expired - Fee Related CN201649139U (en) | 2010-05-13 | 2010-05-13 | Cast-in-place pile loading test inner force testing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201649139U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195112A (en) * | 2013-04-18 | 2013-07-10 | 四川建筑职业技术学院 | Foundation pile foundation model analyzing method and test device for same |
CN103234680A (en) * | 2012-12-18 | 2013-08-07 | 徐州睿丰企业管理咨询有限公司 | Method for measuring stress of steel bar in well wall of inclined shaft |
CN109372037A (en) * | 2018-12-15 | 2019-02-22 | 机械工业勘察设计研究院有限公司 | Deposited reinforced concrete pile internal force test test tube and its installation method |
CN112924275A (en) * | 2021-01-25 | 2021-06-08 | 武汉大学 | Micro-force measuring device, preparation method thereof and in-situ mechanical testing method |
-
2010
- 2010-05-13 CN CN2010201886549U patent/CN201649139U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103234680A (en) * | 2012-12-18 | 2013-08-07 | 徐州睿丰企业管理咨询有限公司 | Method for measuring stress of steel bar in well wall of inclined shaft |
CN103234680B (en) * | 2012-12-18 | 2015-03-04 | 朱昱 | Method for measuring stress of steel bar in well wall of inclined shaft |
CN103195112A (en) * | 2013-04-18 | 2013-07-10 | 四川建筑职业技术学院 | Foundation pile foundation model analyzing method and test device for same |
CN103195112B (en) * | 2013-04-18 | 2014-10-08 | 四川建筑职业技术学院 | Foundation pile foundation model analyzing method and test device for same |
CN109372037A (en) * | 2018-12-15 | 2019-02-22 | 机械工业勘察设计研究院有限公司 | Deposited reinforced concrete pile internal force test test tube and its installation method |
CN112924275A (en) * | 2021-01-25 | 2021-06-08 | 武汉大学 | Micro-force measuring device, preparation method thereof and in-situ mechanical testing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104452726B (en) | Profundal zone soil body deep soil settlement survey device and method | |
CN201094020Y (en) | Settlement plate and assembled laminate settlement apparatus | |
CN103215974B (en) | Foundation pile deflection measurement method based on distributed fiber sensing technique | |
CN103321201B (en) | Sealed liquid pressure reduction delaminating deposition takes into account that it is buried underground, measuring method | |
CN106706029B (en) | Soil body performance monitoring device for underground structure construction and working method thereof | |
CN103953025A (en) | Equipment for measuring layered settlement of deep soft soil or blanket and setup method thereof | |
CN102943493B (en) | Method for measuring internal force and deformation of precast pile | |
CN201649139U (en) | Cast-in-place pile loading test inner force testing device | |
CN103215975B (en) | Inbuilt method for distributed type sensing cable in foundation pile | |
CN102635129B (en) | Method for detecting steel reinforcement cage pre-buried under cast-in-place pile | |
CN104406568A (en) | Device and method for monitoring settlement of ground surface in deep water area | |
CN103644892A (en) | Measuring device and method for layered settlement of soil body of deep foundation pit | |
CN108844684A (en) | A method of monitoring diaphram wall seam crossing leakage scenarios | |
CN103471648A (en) | Disturbance construction monitoring method of top pipe tunnel | |
CN102839693A (en) | Anchor quality monitoring device for increased resistance deformation anchor bolts/ropes and application method | |
CN204418149U (en) | Profundal zone soil body deep soil settlement survey device | |
CN202548085U (en) | Detection device for burial depth of dam cut-off wall | |
CN208254458U (en) | Soft base deepwater diking settlement monitoring device | |
CN204214437U (en) | Profundal zone surface subsidence monitoring device | |
CN102797268B (en) | Installation method for testing tube used for testing internal force of pre-stress tubular pile with slide micrometer | |
CN103410136A (en) | Drilling burying method of soil moisture meter | |
CN105971031A (en) | Magnetic-induction-based pile length detection device for tubular pile construction and detection method | |
CN205502092U (en) | Testing arrangement of bored concrete pile burden frictional resistance neutral point in deep back filling | |
CN102519427B (en) | Method for observing settlement of full section of widened roadbed | |
CN103410181B (en) | Burying-before-guiding type step-by-step burying method for monitoring instruments in synchronous construction with loess high fill |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101124 Termination date: 20130513 |