Prior art keywords
thrust collar
thrust runner
spindle
thrust
generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201644677U
Other languages
Chinese (zh)
Inventor
姜成利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunfeng power plant
Original Assignee
Yunfeng power plant
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunfeng power plant filed Critical Yunfeng power plant
Priority to CN2010201644677U priority Critical patent/CN201639446U/en
Application granted granted Critical
Publication of CN201639446U publication Critical patent/CN201639446U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Manufacture Of Motors, Generators (AREA)

Abstract

The utility model relates to a hydropower station generator equipment maintenance unit, namely a generator thrust collar heating detaching device, which is characterized in that an electric heating pad is added in each neutral gear of a thrust collar, and the electric heating pads are connected in parallel and connected with a power control cabinet. On a situation that the thrust collar is in close fit with a spindle, the thrust collar is heated, relative heat insulating measurement is taken on the periphery of the thrust collar, the thrust collar expands relative to the spindle so that transitional fit between the thrust collar and the spindle is changed into clearance fit temporally, and then the thrust collar can be pulled out smoothly by means of hoisting via a crane, thereby reducing labor intensity of workers, speeding up detachment of the thrust collar, guaranteeing smooth overhauling of the units, shortening maintenance period and obtaining better effect.

Description

The generator thrust runner adds heat disassembling device
Technical field
The utility model relates to a kind of hydropower generator maintenance of equipment device, and promptly the generator thrust runner adds heat disassembling device.
Background technology
In the generator maintenance process, what adopt when decomposing the thrust runner of thrust bearing is traditional handicraft: snap ring is decomposed, remove the connecting bolt and the shop bolt of thrust runner and runner plate, about utilizing brake with rotor jack-up 10mm, after 3 of branches are encased inside the epoxy resin board of uniform thickness between thrust runner and runner plate, the brake oil extraction, rotor and main shaft sink by deadweight, and repeated multiple times top rotor cushioning can decompose thrust runner to be removed.Because the frequent starting brake causes the fatigue damage of brake-piston seal cushion rubber and cisco unity malfunction, rotor can't jack-up, and thrust runner can't continue dismounting, and this will directly influence generator and expand and repair the duration.Because of thrust runner and main shaft are interference fits, its magnitude of interference can reach 0.02-0.06mm, generator thrust runner cooperation seam is the copper seam in addition, intensity is relatively poor, uses traditional handicraft to pull out thrust runner by force and very easily damages the cooperation seam, along with increasing of unit maintenance number of times, because of repeated treatments thrust runner seam, certainly will destroy the original tolerance fit system of thrust runner and main shaft, make it to graduate into matched in clearance, this safe operation to unit is totally unfavorable.
The utility model content
The purpose of this utility model is to provide a kind of generator thrust runner of dismantling better effects if to add heat disassembling device at above-mentioned deficiency.
Technical solution of the present utility model is: it is to add a slice electric blanket in each neutral gear of thrust runner that the generator thrust runner adds heat disassembling device, adopts parallel connection between the electric blanket and inserts electrical power control cabinet.
Cooperate tighter situation with main shaft at thrust runner, by thrust runner is heated, and take to be incubated accordingly measure in the thrust runner periphery, the relative main shaft of thrust runner produces and expands, make thrust runner and main shaft become matched in clearance temporarily, utilize the crane hoisting method thrust runner can be extracted smoothly by interference fits.
The utility model has the advantages that: adopt thrust runner to add heat disassembling device dismounting thrust runner, alleviated working strength of workers, accelerated the dismounting speed of thrust runner, guaranteed the smooth maintenance of unit, shorten maintenance duration, obtained effect preferably.
Below in conjunction with accompanying drawing execution mode of the present utility model is described in further detail.
Description of drawings
Fig. 1 is the utility model structure diagram.
Embodiment
Referring to Fig. 1, it is to add a slice electric blanket 3 in thrust runner 2 each neutral gear that the generator thrust runner adds heat disassembling device, adopts parallel connection between the electric blanket 3, and rated voltage is 380V, all inserts electrical power control cabinet.Be with the asbestos cloth parcel, to thrust runner 2 implementation insulations outside electric blanket 3 around the thrust runner 2.Put a thermometer 1 on main shaft 4 ends and thrust runner 2 respectively, the monitoring temperature difference between the two is too small as the temperature difference in real time, needs main shaft is taked corresponding cooling measure.People's monitor temperature is stayed at the scene, when the thrust runner temperature reaches 80 ℃, continues constant temperature 1-2 hour, promptly stops heating.Speed should not be too fast when heating, and temperature rise generally is controlled at 15-20 ℃/h.The employing thrust runner 2 of heating makes thrust runner 2 expanded by heating, cooperates the dismounting of crane hoisting method, cooperates crane main hook adjustment lifting level with chain block before the lifting, and measures levelness with level gauge, with crane thrust runner 2 is slowly sling after adjusting level.
The calculating of heating of thrust runner:
ΔT=δ p/αD t=40/11×10 -6×780=46.6(℃)
Needed temperature rise when Δ T-pulls out thrust runner in the formula (℃)
The linear expansion coefficient of α-steel, α=11 * 10 -6(℃ -1)
D tThe aperture that thrust runner cooperates with main shaft under the-room temperature (780mm)
δ p-artificial selected thrust runner cooperates the aperture swell increment, general δ p=0.30-0.50mm.
Heat and pull out the actual temperature that should reach of thrust runner and be:
T=ΔT+T 0+Δt=46.6+25+0=71.6(℃)
In the formula T-pull out the actual temperature that should reach of thrust runner (℃)
T 0-erecting bed room temperature (℃) get 25 ℃
The temperature that Δ t-considers may to descend before pulling out thrust runner preparation (℃), can ignore.The thrust runner needed electric heating capacity of heating can be estimated by following formula:
P=σFΔT×10 -2=10×1.47×46.6×10 -2=7(KW)
The electric heating capacity (KW) that the P-thrust runner is heated required in the formula
σ-heat insulating coefficient (5-12)
F-thrust runner bore area amasss (1.47m 2)

Claims (1)

1. a generator thrust runner adds heat disassembling device, it is characterized in that adding a slice electric blanket (3) in each neutral gear of thrust runner (2), adopts parallel connection between the electric blanket (3) and inserts electrical power control cabinet.
CN2010201644677U 2010-04-21 2010-04-21 Generator thrust collar heating detaching device Expired - Fee Related CN201639446U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201644677U CN201639446U (en) 2010-04-21 2010-04-21 Generator thrust collar heating detaching device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201644677U CN201639446U (en) 2010-04-21 2010-04-21 Generator thrust collar heating detaching device

Publications (1)

Publication Number Publication Date
CN201639446U true CN201639446U (en) 2010-11-17

Family

ID=43083952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201644677U Expired - Fee Related CN201639446U (en) 2010-04-21 2010-04-21 Generator thrust collar heating detaching device

Country Status (1)

Country Link
CN (1) CN201639446U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106455172A (en) * 2016-09-12 2017-02-22 国网浙江省电力公司紧水滩水力发电厂 Automatic heating device of generator thrust block

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106455172A (en) * 2016-09-12 2017-02-22 国网浙江省电力公司紧水滩水力发电厂 Automatic heating device of generator thrust block

Similar Documents

Publication Publication Date Title
CN106513508A (en) Titanium alloy sheet metal part cold-die hot-stamping forming tool and machining method
CN204127015U (en) From cooling oil cylinder
CN101786328A (en) Intelligent segmental temperature control system of wind power blade die
CN201856380U (en) Intelligent section temperature control system of wind-power blade mould
CN201639446U (en) Generator thrust collar heating detaching device
CN103934628B (en) Internal combustion, continuous current locomotive wheel is to the substep compaction apparatus in axle suspension bearing box assembling
CN204269366U (en) Transmission shaft rotary torque loads test platform
CN204697318U (en) Thrust collar heater is used in main pump motor maintenance
CN204178231U (en) A kind of wind generating set pitch control is apart from control system synthesis test platform
CN204043182U (en) A kind of bearing heating device
CN203817708U (en) Step-by-step compaction device used in assembly of internal-combustion DC electric locomotive wheelset shaft-holding box
CN205265454U (en) Main helium fan driving motor
CN205898599U (en) Servo loading device of high temperature friction testing machine
CN201778963U (en) Heating system for speed increasing box of wind driven generator
CN204611307U (en) The bearing protection heating equipment of wind-driven generator and bearing arrangement
CN204597728U (en) Flywheel heater is used in main pump motor maintenance
CN202826438U (en) Cable vulcanizing machine
CN206181410U (en) Aerogenerator bearing electromagnetic heating device
CN102636312A (en) High-speed dynamic balance driving system and control method for large steam turbine rotor
CN220943962U (en) Device for disassembling fasteners by utilizing electric heating mode
CN201763539U (en) Wind generating set fit for conditions of ultralow temperature area
CN212519473U (en) High-frequency induction heating device for through hole hot-tightening bolt of steam turbine
CN204851532U (en) Online monitored control system of aerogenerator
CN203747381U (en) High-speed variable frequency motor bearing temperature monitoring device
CN212013265U (en) Control cabinet convenient to overhaul and used for automatic control engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101117

Termination date: 20130421