CN201633890U - Small platform combining sea area geology investigation and hydrogeololgy investigation - Google Patents
Small platform combining sea area geology investigation and hydrogeololgy investigation Download PDFInfo
- Publication number
- CN201633890U CN201633890U CN2009201681118U CN200920168111U CN201633890U CN 201633890 U CN201633890 U CN 201633890U CN 2009201681118 U CN2009201681118 U CN 2009201681118U CN 200920168111 U CN200920168111 U CN 200920168111U CN 201633890 U CN201633890 U CN 201633890U
- Authority
- CN
- China
- Prior art keywords
- investigation
- platform
- barge
- geology
- small
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a small platform combining sea area geology investigation and hydrogeololgy investigation and relates to an operation platform combining the sea area geology investigation and the hydrogeololgy investigation. The operation platform consists of a small-sized self-elevating drilling platform, a barge and a delivery pipe, wherein the small-sized self-elevating drilling platform is connected with the barge by a connecting ladder; and the delivery pipe is used for delivering mud onto the small-sized self-elevating drilling platform from a mud pond. By the combination form, drilling equipment is separated from material, a mud system, a living facility, a duty facility and the like, thereby reducing the born load of the small platform, so that the small platform can be used for the sea area geology investigation, the hydrogeololgy investigation and the well construction, therefore, the exploration cost is saved, the installation is simple and convenient, and the period is shortened.
Description
Technical field
The utility model relates to geology waterborne, hydrogeological investigation job platform, particularly marine site geology, hydrogeological investigation job platform.
Background technology
In marine site geology, hydrogeological investigation construction, because of strong winds and high waves, in the past oil drilling platforms that adopt add the barge combination more.Oil drilling platform is mainly used in submarine oil exploration and exploitation, and spud leg length can reach 70m, platform Gao Keda 135m, but 15000 tons of load-bearing, and the boring hole depth can reach 12000m, and large platform have the title on " marine island ".Be characterized in that the petroleum drilling large platform is firm, can resist big stormy waves and abominable sea situation.
Marine site geology, hydrogeological investigation drilling depth generally less (0-400m), hydrologic drill be light (50-100 ton), the probing cycle short (1-2 month).As use the petroleum drilling large platform, and build, tear open that the large platform work capacity is excessive, the construction period is long, it is high to require, to operate too complicated loaded down with trivial detailsly, cost is too high.
The utility model content
The utility model design-calculated purpose is in order to overcome the petroleum drilling large platform, builds, tears open that the large platform work capacity is excessive, the construction period long, it is high to require, and operates too complicated loaded down with trivial detailsly, and cost is too high, the defective of the needs of not competent marine site geology, hydrogeological investigation; And chain-wales is little because of load-bearing, can reach safety and stability, tears down and build conveniently, the purpose of marine site geology, hydrogeological investigation operation cheaply.
The technical solution of the utility model adopts following composite set to realize that this composite set comprises:
1) forms by small-sized jack-up drilling unit 1, barge 2 and delivery pipe 5;
2) be connected to connect ladder 4 between platform 1 and the barge 2;
3) delivery pipe 5 is devices of mud pit drilling well slurry conveyed on platform on the barge.
Described small-sized jack-up drilling unit 1 is the workplatform of exploration, mainly is rigging up and power machine, and it is formed and is of a size of: chain-wales: long 10-20m, the high 1.5-3m of wide 10-15m; 7 of buoyancy tanks; 4 of spud legs: diameter 0.5-1m, long 30-40m; Shoe: diameter 4-5m; High 1-1.5m.
Described barge 2 is made up of with the district 9 of guarding on duty material sections 7, living quarters 8.
Described connection ladder 4 is platforms with barge between be connected facility, the one end is fixing on platform, rotatable 0-90 ° of the other end.
Described delivery pipe 5 is the connection hoses that the slurry transportation of the making on the barge arrived drilling well.
Described rig 6 is geology or hydrologic drill, its drilling depth 0-400m.
The utility model is owing to adopted technique scheme, make the utility model device have following beneficial effect: 1) by this array mode, the utility model technology is put branch openings such as driling rig and material, mud system, living facilities, facility on duty, reduced the drilling platform load-bearing, make chain-wales be applicable to marine site geology, hydrogeological investigation operation, reduced and reconnoitred cost; 2) resettlement is flexible, simple; 3) shortened the cycle of reconnoitring.
Description of drawings
Fig. 1: the utility model combination chain-wales device
The specific embodiment
For design of the present utility model and design plan better are described, the utility model is described in further detail in conjunction with instantiation:
Example 1:
As shown in Figure 1, be combination chain-wales device.
Certain marine site, the dark 12m in sea, dark 300m is designed in the hydrogeologic prospecting hole, and May, maximum wind power was less than 6 grades.Totally 35 tons in 86 tons in used rig, mud pump and material, adopt following composite set to carry out the operation of hydrogeological investigation wellbore construction:
1) small-sized jack-up drilling unit 1 is made up by the erection code requirement, be transported on the marine site of carrying out operation, and be fixed on the seabed by relevant rules.
2) on small-sized jack-up drilling unit 1, install rig 6 by the rig erection code.
3) mud system, material, attendant's life, communication and first-equipment are placed on the barge 2.
4) personnel enter small-sized jack-up drilling unit 1 by connecting ladder 4, and mud is at barge 2, and the mud pit pulping enters rig 6 by delivery pipe 5, to satisfy the needs that creep into operation.Driller personnel on duty creep into operation at platform 1 to rig 6.
Example 2:
Certain marine site, the dark 15m in sea, design geology hole depth 380m, 5-6 month maximum wind power is less than 7 grades.Totally 28 tons in 66 tons in used rig, mud pump and material, adopt following composite set to carry out the small-bore geological drilling operation in marine site:
1) require combination carry to the marine site of carrying out operation small-sized jack-up drilling unit 1 erection code, and the safety journey is fixed on the seabed.
2) on small-sized jack-up drilling unit 1, install rig 5 by the rig erection code.
3) mud system, material, attendant, communication and first-equipment are placed on the barge.
4) mud enters rig 6 to satisfy the needs that creep into operation in barge 2 mud pit pulpings by delivery pipe 5; Driller personnel on duty enter small-sized jack-up drilling unit 1 by connecting ladder 4, and rig 6 is crept into operation.
Example 3:
Certain marine site, the dark 12m in sea, design well hole depth 360m, May, maximum wind power was less than 7 grades.Totally 48 tons in 86 tons in used rig, mud pump and material, adopt following composite set to carry out marine site supply well construction operation:
1) require combination carry to the marine site of carrying out operation small-sized jack-up drilling unit 1 erection code, and the safety journey is fixed on the seabed.
2) on small-sized jack-up drilling unit 1, install water source rig 5 by the rig erection code.
3) mud system, material, attendant, communication and first-equipment are placed on the barge 2.
4) mud enters rig 6 to satisfy the needs that creep into operation in barge 2 mud pit pulpings by delivery pipe 5; Driller personnel on duty enter small-sized jack-up drilling unit 1 by connecting ladder 4, and rig 6 is crept into operation.
Claims (6)
1. marine site geology, hydrogeological investigation make up chain-wales, it is characterized in that:
1) forms by small-sized jack-up drilling unit, barge and delivery pipe;
2) be connected to connect ladder between platform and the barge;
3) delivery pipe is the device of mud pit drilling well slurry conveyed on platform on the barge.
2. marine site according to claim 1 geology, hydrogeological investigation combination chain-wales, it is characterized in that: described small-sized jack-up drilling unit is formed and is of a size of: chain-wales: long 10-20m, the high 1.5-3m of wide 10-15m; 7 of buoyancy tanks; 4 of spud legs: diameter 0.5-1m, long 30-40m; Shoe: diameter 4-5m, high 1-1.5m.
3. marine site according to claim 1 geology, hydrogeological investigation combination chain-wales is characterized in that: described barge is to be divided into material sections, living quarters and three districts, district of guarding on duty.
4. the combination chain-wales of a kind of marine site according to claim 1 geology, hydrogeological investigation is characterized in that: described connection ladder be platform with barge between be connected rope ladder, the one end is fixing on platform, the other end turns 0-90 °.
5. the combination chain-wales of a kind of marine site according to claim 1 geology, hydrogeological investigation is characterized in that: described delivery pipe is to be transported to the connection hose of rig on the barge by connection hose from the mud of mud pump making.
6. marine site according to claim 5 geology, hydrogeological investigation combination chain-wales, it is characterized in that: described rig is geology or hydrologic drill, its drilling depth 0-400m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201681118U CN201633890U (en) | 2009-08-12 | 2009-08-12 | Small platform combining sea area geology investigation and hydrogeololgy investigation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201681118U CN201633890U (en) | 2009-08-12 | 2009-08-12 | Small platform combining sea area geology investigation and hydrogeololgy investigation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201633890U true CN201633890U (en) | 2010-11-17 |
Family
ID=43078373
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201681118U Expired - Fee Related CN201633890U (en) | 2009-08-12 | 2009-08-12 | Small platform combining sea area geology investigation and hydrogeololgy investigation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201633890U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015024310A1 (en) * | 2013-08-22 | 2015-02-26 | 中交第三航务工程勘察设计院有限公司 | Shipborne truss combined in-situ testing platform |
-
2009
- 2009-08-12 CN CN2009201681118U patent/CN201633890U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015024310A1 (en) * | 2013-08-22 | 2015-02-26 | 中交第三航务工程勘察设计院有限公司 | Shipborne truss combined in-situ testing platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102089493B (en) | Offshore unit and method of installing wellhead platform using the offshore unit | |
CN101657633B (en) | A method of installing a hydroelectric turbine | |
CN104002937B (en) | Offshore oilfield extended testing system platform | |
CN203007918U (en) | Self-lifting type drilling platform based on truss-type stake legs | |
CN201172814Y (en) | Shallow sea self-lifting production testing work platform | |
CN101939215B (en) | Docking and drilling stations for running self-standing risers | |
CN202347509U (en) | Simple oil production platform for offshore oil exploration and development | |
CN104029798B (en) | Self installation production platform | |
CN205475168U (en) | Multi -functional platform | |
CN202672129U (en) | Offshore wind electricity self-elevating seaborne booster station | |
CN202828007U (en) | Installation equipment for suction anchor in deep water | |
CN103482025B (en) | Novel inner cupola single point mooring unit | |
CN201633890U (en) | Small platform combining sea area geology investigation and hydrogeololgy investigation | |
CN203486110U (en) | Buoyant-tower-type ocean platform | |
CN103482036A (en) | Buoyancy tower type ocean platform | |
CN103243717A (en) | Auxiliary pile pulling mechanism and using method thereof | |
Halkyard et al. | A deep draft semisubmersible with a retractable heave plate | |
CN106555391B (en) | Marine embedding rock job platform | |
CN206231582U (en) | One kind can utilize ballast water ocean platform capable of generating electricity | |
CN204000813U (en) | A kind of standardization that adopts floating holder method to install can be moved formula wellhead platform | |
CN203977394U (en) | Ocean platform can float | |
CN103953021B (en) | Pilot production wellhead platform for Complex Reservoir | |
CN113914783A (en) | Dual-purpose engineering investigation water drilling platform and use method thereof | |
Ribuot | HEXAFLOAT–Innovative Competitive Offshore Energy Production | |
CN206476053U (en) | Defeated mooring gear outside a kind of pile foundation type reinforced concrete structure Crude Oil at Sea |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101117 Termination date: 20110812 |