CN201629566U - Electricity network single-phase grounding comprehensive protecting device - Google Patents

Electricity network single-phase grounding comprehensive protecting device Download PDF

Info

Publication number
CN201629566U
CN201629566U CN2009201804211U CN200920180421U CN201629566U CN 201629566 U CN201629566 U CN 201629566U CN 2009201804211 U CN2009201804211 U CN 2009201804211U CN 200920180421 U CN200920180421 U CN 200920180421U CN 201629566 U CN201629566 U CN 201629566U
Authority
CN
China
Prior art keywords
phase
chamber
voltage
earthed switch
sequence current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201804211U
Other languages
Chinese (zh)
Inventor
刘亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Hekai Electrical Science & Technology Co Ltd
Original Assignee
Shanghai Hekai Electrical Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Hekai Electrical Science & Technology Co Ltd filed Critical Shanghai Hekai Electrical Science & Technology Co Ltd
Priority to CN2009201804211U priority Critical patent/CN201629566U/en
Application granted granted Critical
Publication of CN201629566U publication Critical patent/CN201629566U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

The utility model relates to an electricity network single-phase grounding comprehensive protecting device, which comprises a cabinet shell, wherein metal clapboards divide a sealing space which is enclosed by the cabinet shell into a main bus room, a grounding switch room, a voltage transformer room and a second instrument room according to functions; the second instrument room is internally provided with a microcomputer comprehensive controller; the microcomputer comprehensive controller is connected with a line zero sequence current mutual inductor through a second cable; and the line zero sequence current mutual inductor is arranged in a line switch cabinet. The device arranges the microcomputer comprehensive controller in the second instrument room, connects the microcomputer comprehensive controller with the line zero sequence current mutual inductor, detects line zero sequence current through the line zero sequence current mutual inductor, judges whether the single-phase grounding fault is on a bus or on a line through the change of the line zero sequence current, and specifically judges the fault line. The device takes an automatic line selection function as the standard configuration, is greatly convenient for the function selection and the field use of users, and is good for playing the function thereof.

Description

Single-phase grounding comprehensive protecting device of electric network
Technical field
The utility model relates to a kind of single-phase grounding comprehensive protecting device of electric network.
Background technology
At present, the extinguishing arc harmonic elimination apparatus of using in China 3~35kV medium voltage network, its major function is broadly divided into arc eliminator, overvoltage Limiting function, emergency review and data remote function, route selection function and five aspects of harmonic elimination function.Based on the fault direct extinguishing arc harmonic elimination apparatus of ground connection principle mutually; should be able to play the effect of extinguish arcs and control fault development from the analysis of theory and technology aspect; yet; usually only arc eliminator, overvoltage Limiting function, emergency review and data remote function as standard configuration; route selection function and harmonic elimination function are selected voluntarily by the user, usually can have following problem in this actual at the scene use:
First, the user who has has only selected the extinguishing arc harmonic elimination apparatus of standard configuration when signing purchase order, owing to do not possess the route selection function, even extinguished ground arc after the action of extinguishing arc harmonic elimination apparatus, for the route selection handle assembly of having to again repeatedly resets by force, make repeatedly arcing of fault point, to such an extent as to finally cause the generation of phase fault accident;
Second, though the supply of material manufacturer also to customer presentation route selection function and route selection principle, yet be configured at the scene under the situation of little electric current line selection apparatus, for fear of overlapping investment, the user has still selected the extinguishing arc harmonic elimination apparatus of standard configuration usually, the inaccurate problem of route selection when not only there is single-phase arc grounding in this, and because the action of extinguishing arc harmonic elimination apparatus can't be carried out route selection, consequently or abandoning route selection causes earth fault not obtain to handle, or finally cause the phase fault accident because of the extinguishing arc harmonic elimination apparatus repeatedly resets by force;
The 3rd, the extinguishing arc harmonic elimination apparatus is installed in and always falls on electric substation's main bus bar, with be installed in outer drawing on transformer substation's bus of power supply, the emphasis that functional configuration is required is different, if when function match, do not distinguished well, will when a single-phase earthing, cause many extinguishing arc harmonic elimination apparatus to move and the problem that can't reset;
The 4th, except that arc eliminator, overvoltage Limiting function and emergency review and data remote function are configured in the same cabinet as standard configuration, route selection function and harmonic elimination function realize by modular construction, all be to adopt separately independently cabinet, in case during customer requirements configuration repertoire, will cause on control room's door too much to seem very crowded because of installed device;
The 5th, usually the microcomputerized controller in the extinguishing arc harmonic elimination apparatus does not possess overvoltage and under voltage protection function, for replacing conventional voltage transformer cabinet, need to set up microcomputer in addition and combine and protective device in the control room, this has further increased the difficulty of control room's apparatus arrangement and secondary wiring again;
The 6th, usually the extinguishing arc harmonic elimination apparatus can only adopt stationary structure, element maintenance inconvenience in the cabinet, component interchangeability is poor, in case produce the expansion that electric arc is easy to cause the accident in the cabinet, if the user need be transformed into the extinguishing arc harmonic elimination apparatus to the existing voltage transformer cabinet in scene, not only on-the-spot retrofit work amount is big, and need all have a power failure whole bus, this makes on-the-spot the transformation be difficult to realize.
The utility model content
The purpose of this utility model is to provide a kind of and is applicable to various cabinet types, possess the route selection function, be convenient to the single-phase grounding comprehensive protecting device of electric network of on-the-spot type selecting, operation and maintenance.
For achieving the above object; the utility model has adopted following technical scheme: single-phase grounding comprehensive protecting device of electric network; comprise the cabinet shell; metal partion (metp) is divided into the main bus bar chamber with the enclosure space that the cabinet shell surrounds by function; the earthed switch chamber; voltage transformer chamber and secondary meter chamber; the indoor microcomputer general controller that is provided with of described secondary meter; the microcomputer general controller is connected with the circuit zero sequence current mutual inductor by secondary cable; the circuit zero sequence current mutual inductor is installed in the line switching cabinet, and the required secondary voltage signal of microcomputer general controller is introduced by aviation plug by the voltage transformer chamber.
As shown from the above technical solution, the utility model is in the indoor microcomputer general controller that is provided with of secondary meter, and the microcomputer general controller is connected with the circuit zero sequence current mutual inductor, by circuit zero sequence current mutual inductor detection line zero-sequence current, utilize the variation of circuit zero-sequence current to judge single phase ground fault and occur on the bus and still take place on the line, and specifically judge and occur on any bar circuit.The utility model as standard configuration, has made things convenient for user's function apolegamy and on-the-spot the use with the automatic route selection function widely, helps the performance of protective device function.
Description of drawings
Fig. 1 is an electric primary system winding diagram of the present utility model;
Fig. 2 is an internal structure schematic diagram of the present utility model;
Fig. 3 is an external structure schematic diagram of the present utility model.
Embodiment
Single-phase grounding comprehensive protecting device of electric network comprises cabinet shell 50, and the internal operation situation that observation window 52 is observed this device for the user is set on the cabinet shell 50, also is provided for indicating the handcart position indicator 51 of isolating handcart 31 operating states on the cabinet shell 50.Metal partion (metp) is divided into main bus bar chamber 10 with the enclosure space that cabinet shell 50 surrounds by function, earthed switch chamber 20, voltage transformer chamber 30 and secondary meter chamber 40, in the described secondary meter chamber 40 microcomputer general controller 41 is set, microcomputer general controller 41 is connected with the circuit zero sequence current mutual inductor by secondary cable, the circuit zero sequence current mutual inductor is installed in the line switching cabinet, the needed circuit zero sequence current signal of route selection function can only be obtained by the circuit zero sequence current mutual inductor, and the circuit zero sequence current mutual inductor must be installed in the line switching cabinet, the circuit zero sequence current mutual inductor can not only with this matched with devices, also can be supporting with the little electric current line selection apparatus of other principles, as shown in Figure 2.Usually be connected with many circuits on the bus of electric substation, the single-phase arc grounding fault of system may occur on the bus, also may take place on the line.The route selection function is meant utilizes circuit zero sequence current mutual inductor Monitoring Line zero-sequence current, and judge that single phase ground fault occurs on the bus or take place on the line, and further judge fault and specifically occur on any bar circuit by the variation of circuit zero-sequence current.
In conjunction with Fig. 2, described microcomputer general controller 41 is made up of system voltage collection plate, line current collection plate, signal-processing board, display driver plate and power panel.Each phase voltage of system voltage collection plate acquisition system, open delta voltage and earth current; The line current collection plate is used to gather the circuit zero-sequence current; The external switch amount is directly accepted and handled to signal-processing board, and be voltage acquisition plate and line current collection plate to above-mentioned two signal acquiring boards, and the employing data of the high frequency transient electric parameters that provides are handled; The display driver plate is handled the stable state power frequency sampled data of two signal acquiring board collections, and bears running status, data demonstration and storage; Power panel is used for providing working power to voltage acquisition plate, line current collection plate, signal-processing board and display driver plate, simultaneously outwards output action order.This structure can make full use of the software and hardware resource, reduces number of elements, reduces cost, and improves the operational reliability and the internal communication speed of protective device.
In conjunction with Fig. 2, described main bus bar chamber 10 is positioned at the rear of cabinet shell 50, the place ahead of cabinet shell 50 is furnished with secondary meter chamber 40, voltage transformer chamber 30 and earthed switch chamber 20 from top to bottom successively, the upper right quarter in described cabinet shell 50 the place aheads is secondary meter chamber 40, the lower left quarter in cabinet shell 50 the place aheads is earthed switch chamber 20, voltage transformer chamber 30 is between secondary meter chamber 40 and earthed switch chamber 20, and described the place ahead is meant that the staff faces the direction of cabinet when operation.Described main bus bar chamber 10, voltage transformer chamber 30, earthed switch chamber 20 all are provided with independently pressure release passage, to prevent to cause because of internal fault the gross distortion of cabinet body structure.Secondary meter chamber 40 isolates each other fully with main bus bar chamber 10, voltage transformer chamber 30, earthed switch chamber 20, guaranteed the safety of maintenance, debugging and in-service inspection, and any compartment interior fault all can't feed through to other compartments.
In conjunction with Fig. 1,2, be provided with in the described voltage transformer chamber 30 and isolate handcart 31, isolate handcart 31 and push cabinet or in cabinet, pull out installation voltage transformer 36 and high-tension fuse 35 on the isolation handcart 31 along guide rail 31a.Be provided with in the described main bus bar chamber 10 from wall bushing 12 across and into the three-phase main bus bar 11 in the cabinet shell 50, the three-phase main bus bar 11 that is positioned at cabinet shell 50 inside is supported by post insulator, and draw three branch bars 13 respectively with isolate handcart 31 on three upper static contacts 37 link to each other, upper static contact 37 is positioned at upper contact head box 37a.Go up moving contact 32 and fix for three of described isolation handcart 31 by the last contact arm 32b that is arranged in contact arm sleeve pipe 32a, the following contact arm 33b of contact arm sleeve pipe 33a fixes three lower moving contacts 33 of isolation handcart 31 by being arranged in down, last moving contact 32 and lower moving contact 33 are connected row's 34 connections by contact up and down, one of three high-tension fuses 35 terminate on the lower moving contact 33, the input of another termination voltage transformer 36, the other end ground connection of voltage transformer 36.Voltage transformer 36 in the described voltage transformer chamber 30, high-tension fuse 35 and the accessories such as dynamic/static contact of isolating on the handcart 31 are general parts, has good interchangeability, be pulled out to the maintenance position as long as will isolate handcart 31, just can change or overhaul said elements quickly and easily.In addition; the door of earthed switch chamber 20 is behind cabinet; as long as open the cabinet door; change and overhaul all very convenient to wherein phase-splitting earthed switch 21, overvoltage protection device 24, current transformer 23 etc.; above-mentioned this structure has realized the exchange of critical piece, for improving overhaul efficiency, shorten maintenance duration, reducing space for maintenance and created good condition.
In conjunction with Fig. 1; 2; in the described earthed switch chamber 20 phase-splitting earthed switch 21 is set; the secondary control loop of phase-splitting earthed switch 21 links to each other with microcomputer general controller 41 with secondary cable by aviation plug 25; the last leading-out terminal of phase-splitting earthed switch 21 is connected with the following fixed contact 38 of isolating handcart 31 by connecting copper bar; the lower wire end of phase-splitting earthed switch 21 is a common port by connecting the copper bar parallel connection; this common port passes current transformer 23 through earth cable 22 and receives on the earth bus 26; the input of overvoltage protection device 24 is connected on three following fixed contacts 38 of isolating handcart 31, the output head grounding of overvoltage protection device 24.Described phase-splitting earthed switch 21 is the phase-splitting Fast Speed Vacuum Circuit Breaker, perhaps is composed in series by high-voltage and current-limitation fuse and vacuum contactor.Described overvoltage protection device 24 comprises the zinc oxide valve plate FR that four head ends join; wherein the tail end of first, second and third zinc oxide valve plate FR1, FR2, FR3 is connected respectively and is connected on behind first, second and third discharging gap CG1, CG2, the CG3 on the following fixed contact 38 of isolating handcart 31, the tail end of the 4th zinc oxide valve plate FR4 ground connection behind the 4th discharging gap CG4 of connecting.The protective feature relatively and the alternate protective feature of overvoltage protection device 24 are identical, can not only limit lightning overvoltage and can also limit the electrical network internal overvoltage, and can not only limiting relatively, overvoltage can also limit alternate overvoltage.
Below in conjunction with Fig. 1,2,3 the utility model will be further described.
Be pushed into the service position as long as will isolate handcart 31, it is just charged to be in the high pressure winding of isolating the voltage transformer 36 on the handcart 31, the upper contact head that is in three phase-splitting earthed switches 21 in the earthed switch chamber 20 is also charged simultaneously, and whole device enters the running status of warming-up exercise.
When system normally moved, the voltage signal that microcomputer general controller 41 is sent here by voltage transformer 36 was monitored system's working voltage.The system voltage sampling plate of microcomputer general controller 41 carries out the power frequency sampling in real time to each phase-to-ground voltage of system and open delta voltage, simultaneously system's open delta voltage is carried out high frequency sampling; The display driver plate is handled the power frequency sampled data of system voltage collection plate collection, calculate the effective value of each phase voltage and open delta voltage, and on panel, show, in case the result of calculation of each phase voltage effective value surpasses predefined overvoltage limit value or is lower than the under voltage limit value, then microcomputer general controller 41 is in time sent and is reported to the police and output passive switch amount contact point signal, and panel shows fault type and each phase voltage.Meanwhile, signal-processing board is handled in real time to the open delta voltage high frequency sampled data that the system voltage collection plate provides, in case open delta voltage surpasses predefined limit value, then starts immediately and interrupts; The system voltage collection plate is implemented high frequency sampling to each phase-to-ground voltage of system immediately, and the display driver plate is ended immediately to the processing of stable state electric parameters and demonstration, and the line current collection plate begins to carry out the high-frequency data collection of the first period circuit zero-sequence current.
Signal-processing board carries out analyzing and processing to the high frequency sampled data of each phase-to-ground voltage of system that the system voltage collection plate provides, make judgement to fault type and fault are separate rapidly, fault type comprises voltage transformer 36 broken strings, metallic earthing, arc grounding and ferro resonance.
If voltage transformer 36 disconnection faults; then microcomputer general controller 41 panels show fault type, separate and each phase-to-ground voltage of system; send alarm signal and export passive switch amount contact point signal, so that the user carries out locking to protective relaying device that might misoperation.
If single phase ground fault, single phase ground fault is divided into two kinds of Single Phase Metal ground connection and single-phase arc grounding faults, then microcomputer general controller 41 is sent the order of closing a floodgate to the phase-splitting earthed switch 21 of fault phase, phase-splitting earthed switch 21 can close a floodgate about 30ms, with the direct mutually ground connection of fault, fault phase bus directly links to each other with ground network by phase-splitting earthed switch 21.The panel of microcomputer general controller 41 shows fault type and separate, each phase-to-ground voltage of system and the system single-phase earth fault current effective value under operational mode at that time.If single-phase arc grounding fault takes place, then can extinguish ground arc rapidly and the arc grounding overvoltage is stablized the lsafety level of on-Line Voltage, can effectively avoid the phase fault accident that causes because of arc grounding and accidents such as the ferro resonance that causes because of the arc grounding overvoltage and Explosion of on Arrester; If the metallic earthing fault takes place, then can reduce touch voltage and step voltage greatly, help support equipment and personal safety.After phase-splitting earthed switch 21 closes a floodgate, the line current collection plate carries out the high-frequency data collection of the second period circuit zero-sequence current, signal-processing board is selected faulty line by the analysis of circuit zero sequence current acquisition data before and after phase-splitting earthed switch 21 is closed a floodgate according to the principle of maximal increment method.By the current transformer 23 of ground connection, the system voltage collection plate collects the power frequency sampled signal of system single-phase earth fault electric current, and the display driver plate is presented on the panel of microcomputer general controller 41 after calculating effective value.As seen, when system's generation single phase ground fault, faulty line can also be selected and show to this device quickly and accurately.
If system's generation ferro resonance, then signal-processing board carries out the Fourier series analysis according to open delta voltage, and with reference to the variation of each phase-to-ground voltage, judge resonant type and frequency rapidly, and drop into corresponding damping resistance, show resonance frequency and each phase-to-ground voltage on the panel of microcomputer general controller 41, treat to remove damping resistance after resonance disappears.
In addition, this device has the emergency review function, and the associated electrical tolerance in the time of can writing down the type of time that 18 faults take place and fault and fault can be had access to for the user afterwards.This device also has the data remote function, and this device has disposed RS485 microcomputer communication interface, can realize transfer of data by network-bus and computer supervisory control system according to the communication protocol of user's appointment.The data that transmitted have: line voltage and three-phase voltage when system normally moves, line voltage when the time of system's generation overvoltage or low-voltage and fault between each phase, the time of voltage transformer 36 disconnection faults takes place, each phase voltage during separate and fault, the time of Single Phase Metal ground connection takes place, separate, each phase voltage when faulty line numbering and fault, the time of single-phase arc grounding fault takes place, separate, the faulty line numbering, and each phase voltage and system single-phase earth fault electric current during fault, the time of system's generation ferro resonance, the resonance frequency, resonance frequency.
In a word, core of the present utility model is core control part--on the function setting of microcomputer general controller 41, except basic function arc eliminator and overvoltage Limiting function that conventional extinguishing arc harmonic elimination apparatus is possessed, also the route selection function is classified as standard configuration as basic function, effectively further developing of control fault can also provide the fault wire size for the user handles single phase ground fault.The microcomputer general controller 41 all right normal working voltages of display system have been set up overvoltage and under voltage warning function, make that normal monitoring function is more complete.In addition,, the function of protective device has been carried out optimum organization, be divided into total site type and branch site type, made things convenient for user's lectotype selection, the on-the-spot use and coordination according to the difference of infield difference to the functional requirement emphasis.Utilize the isolation handcart 31 interior voltage transformer 36 and the high-tension fuses 35 thereof arranged at KYN28 type switch cabinet middle part, the while is as the parts removed of protective device; Utilize the outlet cable vault as earthed switch chamber 20, arrange elements such as phase-splitting earthed switch 21, overvoltage protection device 24 summation current transformers 23, solved protective device and realized the arrangements of elements space problem that miniaturization can't be gone beyond.

Claims (9)

1. single-phase grounding comprehensive protecting device of electric network; comprise cabinet shell (50); metal partion (metp) is divided into main bus bar chamber (10) with the enclosure space that cabinet shell (50) surrounds by function; earthed switch chamber (20); voltage transformer chamber (30) and secondary meter chamber (40); it is characterized in that: microcomputer general controller (41) is set in the described secondary meter chamber (40); microcomputer general controller (41) is connected with the circuit zero sequence current mutual inductor by secondary cable; the circuit zero sequence current mutual inductor is installed in the line switching cabinet, and the required secondary voltage signal of microcomputer general controller (41) is introduced by aviation plug by voltage transformer chamber (30).
2. single-phase grounding comprehensive protecting device of electric network according to claim 1 is characterized in that: the signal-processing board that described microcomputer general controller (41) comprises the system voltage collection plate that is used for each phase voltage of acquisition system, open delta voltage and earth current, the line current collection plate that is used to gather the circuit zero-sequence current, handle the high frequency transient electric parameters of the signal gathered, be used for signal collected stable state power frequency sampled data is handled and the display driver plate of video data and be used to provide the power panel of working power.
3. single-phase grounding comprehensive protecting device of electric network according to claim 1; it is characterized in that: described main bus bar chamber (10) is positioned at the rear of cabinet shell (50); the place ahead of cabinet shell (50) is arranged secondary meter chamber (40), voltage transformer chamber (30) and earthed switch chamber (20) from top to bottom successively; the upper right quarter in described cabinet shell (50) the place ahead is secondary meter chamber (40); the lower left quarter in cabinet shell (50) the place ahead is earthed switch chamber (20), and voltage transformer chamber (30) are positioned between secondary meter chamber (40) and earthed switch chamber (20).
4. single-phase grounding comprehensive protecting device of electric network according to claim 3; it is characterized in that: be provided with in the described main bus bar chamber (10) from wall bushing (12) across and into the three-phase main bus bar (11) in the cabinet shell (50); being positioned at the inner three-phase main bus bar (11) of cabinet shell (50) is supported by post insulator; and draw three branch bars (13) and link to each other with three upper static contacts (37) of isolating handcart (31) respectively, upper static contact (37) is positioned at upper contact head box (37a).
5. single-phase grounding comprehensive protecting device of electric network according to claim 3; it is characterized in that: be provided with in the described voltage transformer chamber (30) and isolate handcart (31); isolate handcart (31) and go up installation voltage transformer (36) and high-tension fuse (35); isolating handcart (31) pushes cabinet or pulls out in cabinet along guide rail (31a); go up moving contact (32) and fix for three of described isolation handcart (31) by the last contact arm (32b) that is arranged in contact arm sleeve pipe (32a); three lower moving contacts (33) of isolating handcart (31) are fixing by the following contact arm (33b) of contact arm sleeve pipe (33a) under being arranged in; last moving contact (32) and lower moving contact (33) are connected row (34) connection by contact up and down; one of three high-tension fuses (35) terminate on the lower moving contact (33); the input of another termination voltage transformer (36), the other end ground connection of voltage transformer (36).
6. single-phase grounding comprehensive protecting device of electric network according to claim 3; it is characterized in that: phase-splitting earthed switch (21) is set in the described earthed switch chamber (20); the last leading-out terminal of phase-splitting earthed switch (21) is connected with the following fixed contact (38) of isolating handcart (31) by connecting copper bar; following fixed contact (38) is positioned at contact box (38a) down; the lower wire end of phase-splitting earthed switch (21) is a common port by connecting the copper bar parallel connection; this common port passes current transformer (23) and is connected to earth bus (26) through earth cable (22); the input of overvoltage protection device (24) is connected on three following fixed contacts (38) of isolating handcart (31), the output head grounding of overvoltage protection device (24).
7. single-phase grounding comprehensive protecting device of electric network according to claim 6 is characterized in that: the secondary control loop of described phase-splitting earthed switch (21) links to each other with microcomputer general controller (41) with secondary cable by aviation plug (25).
8. single-phase grounding comprehensive protecting device of electric network according to claim 6 is characterized in that: described phase-splitting earthed switch (21) is the phase-splitting Fast Speed Vacuum Circuit Breaker, perhaps is composed in series by high-voltage and current-limitation fuse and vacuum contactor.
9. single-phase grounding comprehensive protecting device of electric network according to claim 6; it is characterized in that: described overvoltage protection device (24) comprises the zinc oxide valve plate (FR) that four head ends join; wherein the tail end of first, second and third zinc oxide valve plate (FR1, FR2, FR3) is connected respectively and is connected on behind first, second and third discharging gap (CG1, CG2, CG3) on three following fixed contacts (38) of isolating handcart (31), the tail end of the 4th zinc oxide valve plate (FR4) the 4th discharging gap (CG4) the back ground connection of connecting.
CN2009201804211U 2009-11-10 2009-11-10 Electricity network single-phase grounding comprehensive protecting device Expired - Fee Related CN201629566U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201804211U CN201629566U (en) 2009-11-10 2009-11-10 Electricity network single-phase grounding comprehensive protecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201804211U CN201629566U (en) 2009-11-10 2009-11-10 Electricity network single-phase grounding comprehensive protecting device

Publications (1)

Publication Number Publication Date
CN201629566U true CN201629566U (en) 2010-11-10

Family

ID=43060965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201804211U Expired - Fee Related CN201629566U (en) 2009-11-10 2009-11-10 Electricity network single-phase grounding comprehensive protecting device

Country Status (1)

Country Link
CN (1) CN201629566U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022178965A1 (en) * 2021-02-25 2022-09-01 Jst Power Equipment, Inc. Medium-voltage switchgear system having single phase breaker control
US11735385B2 (en) 2021-02-25 2023-08-22 Jst Power Equipment, Inc. Medium-voltage switchgear system having single phase breaker control

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022178965A1 (en) * 2021-02-25 2022-09-01 Jst Power Equipment, Inc. Medium-voltage switchgear system having single phase breaker control
US11735385B2 (en) 2021-02-25 2023-08-22 Jst Power Equipment, Inc. Medium-voltage switchgear system having single phase breaker control

Similar Documents

Publication Publication Date Title
CN101707358A (en) Single-phase grounding comprehensive protecting device of electric network
CN104732847B (en) Electric power system 1:1 voltage class distribution network single-phase ground fault simulation test platform
CN104101799B (en) Modular distribution network dynamic simulation and terminal test integration system
CN203071571U (en) Intelligent monitoring device for distributed boundary switches
CN103605357B (en) The test macro of power distribution network boundary switch control device
CN101557083B (en) Handcart-type switch arc suppression device
CN102790429A (en) On-line intelligent monitoring module for intelligent transformer substation GISs (gas insulated switchgear)
CN202586308U (en) Comprehensive grounding protective device for microcomputer
CN101710676A (en) Movable arc-suppression harmonic elimination device
CN206878366U (en) A kind of armored moving alternating-current metal double-layer vacuum switch cabinet structure
Kojovic et al. Sub-cycle detection of incipient cable splice faults to prevent cable damage
CN112986743B (en) Active intervention type arc suppression device test system function system
CN201629566U (en) Electricity network single-phase grounding comprehensive protecting device
CN101477916A (en) Fixed arc extinguishing device for switch
CN212008850U (en) Intelligent primary and secondary fused on-column circuit breaker
CN201623393U (en) Removable arc and resonance suppression device
CN203242926U (en) Low-voltage power distribution cabinet with residual current protection function
CN102195242B (en) Intelligent feeder line module based on background wall technology
CN110048335A (en) A kind of switchgear
CN201355747Y (en) Handcart type switch arc blow-out device
CN216211624U (en) Real standard system of power transformation and distribution operation and maintenance integration
CN203660531U (en) Novel intelligent arc-extinguishing and over-voltage protection device
CN202872357U (en) Optimized comprehensive protection device of power grid
CN211790723U (en) Intelligent protection device of fixed circuit breaker switch cabinet
CN201877345U (en) Arc extinguisher

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101110

Termination date: 20181110