CN201607506U - Special test equipment for master warning box - Google Patents

Special test equipment for master warning box Download PDF

Info

Publication number
CN201607506U
CN201607506U CN2010201229509U CN201020122950U CN201607506U CN 201607506 U CN201607506 U CN 201607506U CN 2010201229509 U CN2010201229509 U CN 2010201229509U CN 201020122950 U CN201020122950 U CN 201020122950U CN 201607506 U CN201607506 U CN 201607506U
Authority
CN
China
Prior art keywords
switch
test
power supply
reometer
test equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201229509U
Other languages
Chinese (zh)
Inventor
闫明
张晓梅
赵志远
何洪超
张凤坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Aircraft Industry Group Co Ltd
Original Assignee
Harbin Aircraft Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Aircraft Industry Group Co Ltd filed Critical Harbin Aircraft Industry Group Co Ltd
Priority to CN2010201229509U priority Critical patent/CN201607506U/en
Application granted granted Critical
Publication of CN201607506U publication Critical patent/CN201607506U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Emergency Alarm Devices (AREA)

Abstract

The utility model relates to special test equipment for a master warning box of an airplane warning system, which is provided with a P power supply signal needed by a test lamp, a double-path power supply R/N power supply signal and a multi-path alarming signal needed by the single-path test; and a panel of the test equipment is provided with a P power supply switch, an R/N power supply selection switch, a wave band switch, a reset switch, a master warning lamp, a current meter, two ammeter metering jacks and two master warning lamp flicker frequency test holes. The test equipment can completely simulate the airplane test environment to test comprehensive performance parameters of the master warning box, ensure the quality of installing finished products, simultaneously simplifies operation procedures, and improves the working efficiency.

Description

Major alarm box special test equipment
Technical field
The utility model relates to a kind of aircraft warning system major alarm box special test equipment.
Background technology
The major alarm box is important product of aircraft warning system, for the pilot provides the system alarm signal, relates to flight safety.Existing equipment can not carry out the overall technology parameter testing to the major alarm box, the quality of the finished product that can't guarantee to install; And the operation of equipment relative complex, work efficiency is lower.
Summary of the invention
The purpose of this utility model is: propose a kind ofly can carry out all round properties parameter testing and simplified control, the higher special test equipment of work efficiency to the major alarm box.
The technical solution of the utility model is: design a kind of major alarm box special test equipment, comprise P power switch S1, R/N power selection switch S5, waver S8, reset switch S9, switch S 10, main stand by lamp L1, pilot lamp L2 and L3, multiple alarm signal etc., and on above components and parts basis, increase a reometer mA, two reometer metering jack T1 and T2, two major alarm lamp flicker frequency instrument connection T3 and T4; Reometer metering jack T1 and T2 are separately positioned on reometer mA both sides, and reometer metering jack T1 connects switch S 10, and reometer metering jack T2 connects switch S 5; Pilot lamp L2 is in parallel with L3, and frequency test hole T3 and T4 lay respectively at the two ends of L2 and L3 parallel line.
Advantage and the beneficial effect that the utlity model has are: by increasing the current sinking that reometer comes measurement section product, provide intuitive judgment when hookup or portion's product are short-circuited fault, avoid fault expansion; Increase reometer metering jack T1, T2 reometer is carried out the original position Measuring and testing, save metering cycle, use manpower and material resources sparingly; Increase frequency test hole T3, T4 and come signal is carried out sampling analysis, make the operator can adopt these signals of instrument quantitative measurment such as oscillograph or frequency meter, reduced measuring error.This testing apparatus can be used as special test equipment and comes portion's product place under repair is detected when satisfying aircraft and criticizing production verification needs.
Description of drawings
Fig. 1 is this testing apparatus improvement part schematic diagram;
Fig. 2 is the test connection diagram;
Fig. 3 is the testing apparatus schematic diagram.
Embodiment
Below in conjunction with accompanying drawing the utility model is described further.
Fig. 1 is the improvement part schematic diagram of this special test equipment.This major alarm box special test equipment mainly comprises P power switch S1, R/N power selection switch S5, waver S8, reset switch S9, switch S 10, main stand by lamp L1, pilot lamp L2 and L3,17 tunnel alerting signals etc., and a reometer mA, two reometers metering jack T1 and T2, two major alarm lamp flicker frequency instrument connection T3 and T4 on above components and parts basis, have been increased, reometer metering jack T1 and T2 are separately positioned on reometer mA both sides, reometer metering jack T1 connects switch S 10, and reometer metering jack T2 connects switch S 5; Pilot lamp L2 is in parallel with L3, and frequency test hole T3 and T4 lay respectively at the two ends of L2 and L3 parallel line.
Fig. 2 is a testing apparatus test connection diagram, and major alarm box special test equipment is by DC power supply, and is connected with the major alarm box, and major alarm box technical parameter is tested.
Fig. 3 is the testing apparatus schematic diagram.The test job idiographic flow is as follows:
Operating temperature range: 20 ℃~55 ℃
(1) prepares before the test
A: connect exerciser and major alarm box by Fig. 1
B: each position of the switch of exerciser is as follows: switch S 2 is placed " OFF ", and S3, S4 place to upper/lower positions, and S5, S6 place the neutral position, and S10 places " NOR " position.
C: power supply :+28VDC
(2) test routine
A. connect the D.C. regulated power supply switch, check that output voltage should be+28VDC.
B. switch S 1 is placed " ON " position; system powers on; behind power supply process F1 (2A) the fuse current foldback circuit; be applied to pilot lamp L1 (24V operating voltage) end; the pilot lamp other end and power " " between be connected in series R1 (0.51K; 1/4W) be used for current-limiting protection, under the effect of potential difference (PD), pilot lamp L1 ignites.
C. switch S 5 is placed " N " position, the reometer indication should be not more than 80mA.Place " P ", S4 to place " LOAD " position S3, L2, L3 pilot lamp should glimmer, and the reometer indication should be not more than 250mA.S3 is placed to upper/lower positions, and L2, L3 pilot lamp should extinguish.This test is for carrying out P power supply oscillator inspection lamp test to the major alarm box.
D. switch S 2 is placed " OFF " position, S5 is placed the position of N power supply, S6 places the position on A-K road, stir waver S7 and be tested to the K road successively by the A road, L2, L3 pilot lamp all should be glittering, flicker frequency usable frequency meter is measured at "---F---" instrument connection, should be 1.25~2.5 hertz.
S6 is placed the position on L-b road, stirs waver S8 and be tested to the b road successively by the L road, then L2, the L3 pilot lamp all should be glittering, flicker frequency usable frequency meter is measured at "---F---" instrument connection, should be 1.25~2.5 hertz.In each passage process of the test, press reset button S9 after, pilot lamp all should extinguish.This test reaches the alerting signal frequency test for the major alarm box being carried out the test of single channel alerting signal, and every road alerting signal is selected to trigger by waver.
When E. the S5 switch being placed R power supply position, the major alarm box will be with the same manner work. the second road power supply test of this test for the major alarm box is supplied power with double circuit.
F. after test finishes, all switches are placed open position, powered-down unloads product and power lead.
Facts have proved that major alarm box special test equipment can better meet the preceding verification of the box-packed machine of major alarm and portion's product are repaired maintenance needs.

Claims (1)

1. major alarm box special test equipment, comprise P power switch (S1), R/N power selection switch (S5), waver (S8), reset switch (S9), switch (S10), main stand by lamp (L1), pilot lamp (L2 and L3) and multiple alarm signal etc., it is characterized in that an increase reometer (mA), two reometers measure jack (T1 and T2), two major alarm lamp flicker frequency instrument connections (T3 and T4) on above components and parts basis; Reometer metering jack (T1 and T2) is separately positioned on reometer (mA) both sides, and reometer metering jack (T1) connects switch (S10), and reometer metering jack (T2) connects R/N power selection switch (S5); Pilot lamp (L2) is in parallel with (L3), frequency test hole (T3) and T4) lay respectively at the two ends of L2 and L3 parallel line.
CN2010201229509U 2010-02-11 2010-02-11 Special test equipment for master warning box Expired - Fee Related CN201607506U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201229509U CN201607506U (en) 2010-02-11 2010-02-11 Special test equipment for master warning box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201229509U CN201607506U (en) 2010-02-11 2010-02-11 Special test equipment for master warning box

Publications (1)

Publication Number Publication Date
CN201607506U true CN201607506U (en) 2010-10-13

Family

ID=42952211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201229509U Expired - Fee Related CN201607506U (en) 2010-02-11 2010-02-11 Special test equipment for master warning box

Country Status (1)

Country Link
CN (1) CN201607506U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104122881A (en) * 2013-04-24 2014-10-29 哈尔滨飞机工业集团有限责任公司 Tester of alarm control box of airplane
CN104122505A (en) * 2013-04-24 2014-10-29 哈尔滨飞机工业集团有限责任公司 Tester of direct-current power supply system
CN105021091A (en) * 2014-04-21 2015-11-04 哈尔滨飞机工业集团有限责任公司 Rocket control box tester
CN105093146A (en) * 2014-05-07 2015-11-25 哈尔滨飞机工业集团有限责任公司 Low-voltage detector tester

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104122881A (en) * 2013-04-24 2014-10-29 哈尔滨飞机工业集团有限责任公司 Tester of alarm control box of airplane
CN104122505A (en) * 2013-04-24 2014-10-29 哈尔滨飞机工业集团有限责任公司 Tester of direct-current power supply system
CN104122505B (en) * 2013-04-24 2017-07-28 哈尔滨飞机工业集团有限责任公司 A kind of DC power system exerciser
CN105021091A (en) * 2014-04-21 2015-11-04 哈尔滨飞机工业集团有限责任公司 Rocket control box tester
CN105021091B (en) * 2014-04-21 2016-09-14 哈尔滨飞机工业集团有限责任公司 A kind of rocket controls box exerciser
CN105093146A (en) * 2014-05-07 2015-11-25 哈尔滨飞机工业集团有限责任公司 Low-voltage detector tester

Similar Documents

Publication Publication Date Title
CN201607506U (en) Special test equipment for master warning box
CN106990384B (en) Device and method for detecting faulty wiring of three-phase electric energy meter
CN103760489A (en) Intelligent detection device for high-voltage circuit breaker
CN109254234A (en) A kind of trees-wire electrical discharge simulation experiment method
CN103823128B (en) A kind of FCT/ICT comprehensive test device customizing electronic product
CN102721891A (en) Test device for non-liner resistor type resonance eliminator
CN202351302U (en) Testing instrument for simulating unbalance current of serial compensating device
CN102901904B (en) A kind of Multifunctional intelligent detection device for circuit board
CN207908655U (en) Power module testboard
CN104515956B (en) A kind of intelligent electric energy meter power module detection method and device
CN206557274U (en) Automotive check instrument
CN206945841U (en) The detection means of harmonic-eliminating resistor
CN104391255A (en) Switching power supply fault simulator
CN113495224A (en) Battery pack simulation detection device and detection method
CN106093676B (en) Outfield fault detection and diagnosis equipment
CN109335018B (en) Automatic wire harness detection system and wire harness box for aircraft auxiliary power device
CN103915004B (en) Aircraft station simulated training practical operation system
CN207215868U (en) A kind of circuit board testing device
CN115656682A (en) Converter valve thyristor control unit testing device and method
CN207623501U (en) A kind of terminal batch for electric energy quality monitoring tests system
CN109886428A (en) A kind of power equipment safety configuration check method
CN202649312U (en) Automatic resistor tester
CN203241483U (en) Vehicle toilet function inspection station
CN219065634U (en) Comprehensive temperature rise test board for railway signal equipment
CN206945815U (en) A kind of protective relaying device output clamping voltage detecting circuit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101013

Termination date: 20130211