CN201605690U CN2009202199476U CN200920219947U CN201605690U CN 201605690 U CN201605690 U CN 201605690U CN 2009202199476 U CN2009202199476 U CN 2009202199476U CN 200920219947 U CN200920219947 U CN 200920219947U CN 201605690 U CN201605690 U CN 201605690U
Authority
CN
China
Prior art keywords
curtain wall
top rail
aluminium material
dry construction
unit type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202199476U
Other languages
Chinese (zh)
Inventor
李德生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Kelida Building and Decoration Co Ltd
Original Assignee
Suzhou Kelida Building and Decoration Enginering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Kelida Building and Decoration Enginering Co Ltd filed Critical Suzhou Kelida Building and Decoration Enginering Co Ltd
Priority to CN2009202199476U priority Critical patent/CN201605690U/en
Application granted granted Critical
Publication of CN201605690U publication Critical patent/CN201605690U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a completely-dry construction unitized curtain wall, comprising a unit plate, water tank aluminum materials, a batch water piece, EPDM adhesive tapes and foaming EPDM rubber sponges, wherein the unit plate is composed of an upper cross beam, a lower cross beam, a left stand column and a right stand column. Two ends of the upper cross beam are respectively provided with one water tank aluminum material, and the parts of the water tank aluminum materials and the upper cross beam is provided with the foaming EPDM rubber sponges. The upper parts of the water tank aluminum materials are provided with the blocking EPDM adhesive tapes, and the upper cross beam is provided with the batch water piece. The completely-dry construction unitized curtain wall has the advantages of good water tightness and air tightness, less on-site operation, high factory level and convenient construction.

Description

Complete dry construction unit type curtain wall
Technical field
The utility model relates to the curtain wall field, particularly a kind of complete dry construction unit type curtain wall.
Background technology
Building curtain wall is the building envelope that integrates Building technology, function and art, and as a kind of senior building exterior wall, it is liking of architect and developer extremely.Because the development ability of domestic curtain wall enterprise can not satisfy the needs in curtain wall market, disconnect, cause the watertightness performance of a large amount of unit type curtain walls to go wrong, influenced the unit type curtain wall technology and used and promote, therefore, the watertightness tightness is the major issue of building curtain wall design always.
From the process of most of curtain wall tests, there is such or such in various degree problem in unit type curtain wall in test process.Wherein watertightness, tightness are the comparison distinct issues.The rain leakage phenomenon of cell curtain wall is very outstanding, and is well-known, and the quality of unit type curtain wall is by design level, quality of materials, crudy, assembling quality, installation quality decision.
Curtain wall is after installation, all can have the slit between each cell block, general way be with fluid sealant with each bar gap sealing, this just requires should guarantee in worker's work progress not leave between the slit hole, guarantee that again fluid sealant beats the uniformity of the degree of depth of notes, also will guarantee the clean and tidy of metope, this just requires site operation personnel's technical level very high, and, the fluid sealant that is exposed is exposed outside, made dirty by rainwater and dust, not attractive in appearance
In order to prevent percolating water, the on-the-spot stifled glue of overlapping the slot between unit plate has just become curtain wall producer used main means in the engineering troubleshooting process at the scene, and the construction of fluid sealant has its distinctive requirement, should be bright and clear as construction environment, cleaning, has fire prevention, explosion-proof, dust prevention, curing condition requires temperature at the 10-35 degree, and relative humidity is not less than 30%, and site operation does not just reach this requirement, particularly tank aluminium material place adopts on-the-spot beating to annotate fluid sealant, sealing effectiveness is difficult to be protected, and in long use, because the relative displacement of stratified deformation and plate, can make sealing joint glue that the possibility of breaking is arranged, cause curtain wall performance to descend.
Therefore, a kind of on-the-spot installation lacked, and assembling quality height, the cell curtain wall of good seal performance are industry personnel's striving directions.
The utility model content
The utility model curtain wall comprises unit plate, tank aluminium material, EPDM adhesive tape, foaming EPDM cellular rubber and batch water sheet, the unit plate that described unit plate is made up of top rail, lower transverse beam, left column and right column, be respectively equipped with tank aluminium material at the two ends, the left and right sides of top rail, tank aluminium material and top rail position are provided with foaming EPDM cellular rubber and batch water sheet.
Described tank aluminium material and top rail position are provided with foaming EPDM cellular rubber, and tank aluminium material is connected with top rail by some screws.
Beat on the contact surface of described foaming EPDM cellular rubber and top rail and annotate fluid sealant.
Described this foaming EPDM cellular rubber is a T-shape, in the bottom surface of the outside of tank aluminium material foaming EPDM cellular rubber a little more than tank aluminium material.
Described tank aluminium material is an aluminium opening U type groove, and two upper lateral parts of tank aluminium material have the recess that is pressed into the EPDM adhesive tape.
Described top rail is provided with spilled water hole, and the rainwater that advances thoroughly between curtain wall is discharged from drain hole by tank aluminium material.
Also be provided with batch water sheet on the described top rail, batch water sheet is fixed by screw and top rail.
The bottom of described tank aluminium material is provided with several screws, and this screw is in order to fix tank aluminium material and top rail by screw.
Described tank aluminium material and batch water sheet are respectively aluminium alloy extrusions.
Because EPDM has anti-ozone aging, weatherability, heat-resistant aging, water resistance, also has chemical proofing preferably, can in the natural environment of sunlight, humidity, cold, use for a long time, so the utility model adopts EPDM adhesive tape and foaming EPDM cellular rubber.For batch water effect and the durability the utility model that increases batch water sheet adopts aluminium alloys to criticize the water sheet, above material is the utility model optimal material, but the utility model is not limited to the above-mentioned material of enumerating.
It is good to the utlity model has watertightness and tightness, and execute-in-place is few, the advantage of the high easy construction of batch production degree.
Description of drawings
Fig. 1 is the lateral view of complete dry construction unit type curtain wall;
Fig. 2 is the vertical view of complete dry construction unit type curtain wall;
Fig. 3 is the top rail lateral view of complete dry construction unit type curtain wall;
Fig. 4 is the top rail vertical view of complete dry construction unit type curtain wall.
The specific embodiment
Further specify the utility model below in conjunction with accompanying drawing.
Complete dry construction unit type curtain wall, comprise unit plate, tank aluminium material, EPDM adhesive tape, foaming EPDM cellular rubber and batch water sheet, tank aluminium material of the present utility model adopts aluminium alloys tank aluminium material, and adhesive tape adopts the EPDM adhesive tape, and batch water sheet adopts aluminium alloys to criticize the water sheet.The unit plate that described unit plate is made up of top rail 2, lower transverse beam 1, left column 61 and right column 62, the two ends of top rail 2 are respectively equipped with an aluminium alloys tank aluminium material 5, also have the recess 51 that is pressed into the EPDM adhesive tape on the aluminium alloys tank aluminium material 5, between aluminium alloys tank aluminium material 5 and top rail 2, be provided with foaming EPDM cellular rubber 3, aluminium alloys is criticized water sheet 7 and is located on the top rail 2, and the two ends of top rail 2 are respectively equipped with two outfall 9.
During assembling, earlier with top rail 2, lower transverse beam 1, left column 61 and right column 62 component units plates, beat weather proofing sealant 8 on the notes respectively at the two ends of top rail 2, the area of beating notes weather proofing sealant 8 should be slightly larger than the projected area of foaming EPDM cellular rubber 3, foaming EPDM cellular rubber 3 is placed into the position that is equipped with weather proofing sealant 8 on the top rail 2, again aluminium alloys tank aluminium material 5 is put into foaming EPDM cellular rubber 3, with screw 52 aluminium alloys tank aluminium material 5 is fixed on the top rail 2, then EPDM adhesive tape 4 is pressed into respectively in the recess 51, aluminium alloys is criticized water sheet 7 usefulness screws again and be fixed on the top rail 2, the unit plate assembling is finished.
The utility model is not limited to above-mentioned preferred forms; other mode products that anyone is drawn under the utility model enlightenment, though shape, any variation of being done on the structure; as long as the technical scheme similar to the utility model is all within its protection domain.

Claims (9)

1. complete dry construction unit type curtain wall, it is characterized in that, comprise unit plate, tank aluminium material, foaming EPDM cellular rubber, batch water sheet and EPDM adhesive tape, described unit plate is made up of top rail, lower transverse beam, left column and right column, the two ends of top rail respectively are provided with a tank aluminium material, EPDM adhesive tape, foaming EPDM cellular rubber, and top rail is provided with batch water sheet.
2. complete dry construction unit type curtain wall as claimed in claim 1 is characterized in that, tank aluminium material and top rail position are provided with foaming EPDM cellular rubber, and tank aluminium material is connected with top rail by some screws.
3. complete dry construction unit type curtain wall as claimed in claim 2 is characterized in that, beats on the contact surface of foaming EPDM cellular rubber and top rail and annotates fluid sealant.
4. complete dry construction unit type curtain wall as claimed in claim 1 is characterized in that this bipeltate sponge is a T-shape, in the bottom surface of the outside of tank aluminium material foaming EPDM cellular rubber a little more than tank aluminium material.
5. complete dry construction unit type curtain wall as claimed in claim 1 is characterized in that, tank aluminium material is an aluminium opening U type groove, and two upper lateral parts of tank aluminium material have the recess that is pressed into the EPDM adhesive tape.
6. complete dry construction unit type curtain wall as claimed in claim 5 is characterized in that the bottom of tank aluminium material is provided with several screws, and this screw is in order to fix tank aluminium material and top rail by screw.
7. complete dry construction unit type curtain wall as claimed in claim 1 is characterized in that top rail is provided with spilled water hole.
8. complete dry construction unit type curtain wall as claimed in claim 1 is characterized in that, top rail is provided with batch water sheet, and batch water sheet is fixed by screw and top rail.
9. complete dry construction unit type curtain wall as claimed in claim 1 is characterized in that, described tank aluminium material and batch water sheet are respectively aluminium alloy extrusions.
CN2009202199476U 2009-10-22 2009-10-22 Completely-dry construction unitized curtain wall Expired - Lifetime CN201605690U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202199476U CN201605690U (en) 2009-10-22 2009-10-22 Completely-dry construction unitized curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202199476U CN201605690U (en) 2009-10-22 2009-10-22 Completely-dry construction unitized curtain wall

Publications (1)

Publication Number Publication Date
CN201605690U true CN201605690U (en) 2010-10-13

Family

ID=42950399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202199476U Expired - Lifetime CN201605690U (en) 2009-10-22 2009-10-22 Completely-dry construction unitized curtain wall

Country Status (1)

Country Link
CN (1) CN201605690U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433950A (en) * 2011-10-10 2012-05-02 苏州柯利达装饰股份有限公司 Unit type vertical glass wing structure
CN106760086A (en) * 2016-12-02 2017-05-31 苏州金螳螂幕墙有限公司 A kind of Split sink construction technology on unit type energy-saving curtain wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433950A (en) * 2011-10-10 2012-05-02 苏州柯利达装饰股份有限公司 Unit type vertical glass wing structure
CN106760086A (en) * 2016-12-02 2017-05-31 苏州金螳螂幕墙有限公司 A kind of Split sink construction technology on unit type energy-saving curtain wall

Similar Documents

Publication Publication Date Title
CN201605690U (en) Completely-dry construction unitized curtain wall
CN210422398U (en) Building door and window waterproof construction
CN210887623U (en) Waterproof structure of external wall panel
CN216007356U (en) External window entrance to a cave insulation construction
CN203347082U (en) Energy-saving day-lighting roof capable of draining water structurally
CN115162630A (en) Pre-embedded roof parapet waterproof roll closing-up structure and construction method
CN203499116U (en) Hidden frame glass daylighting roof
CN209907619U (en) Novel building outer wall
CN216156977U (en) Aluminum alloy layering type smooth glass daylighting roof structure
CN206928831U (en) A kind of windowsill waterproof construction
CN202672367U (en) Waterproof structure for butt joint of steel structure roof and concrete wall face
CN216277584U (en) Novel outer window stagnant water seepage prevention structure
CN201158878Y (en) Combined curtain wall
CN218541213U (en) Roof deformation joint waterproof construction
CN210888654U (en) Multi-layer sealing door and window frame section bar
CN213837075U (en) Outer wall waterproof construction
CN205116575U (en) Board fixing base waterproof gasket upright lockstitches a border
CN215292080U (en) Prevention structure of door and window infiltration
CN216553529U (en) Anti-seepage steel auxiliary frame
CN220247444U (en) External wall insulation board with sealing structure
CN213955590U (en) Pipeline air outlet
CN214169723U (en) External wall panel with heat insulation structure for building
CN209975883U (en) Metal roof sealing rib plate
CN219952291U (en) Waterproof and drainage node at roof of continuous glass curtain wall
CN212027521U (en) Water seepage prevention structure of outer window

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SUZHOU KELIDA DECORATION CO., LTD.

Free format text: FORMER NAME: SUZHOU KELIDA BUILDING + DECORATION ENGINEERING CO., LTD.

CP03 Change of name, title or address

Address after: Wei Road Suzhou city Jiangsu province 215011 High-tech Zone No. 6 Deng

Patentee after: Suzhou Kelida Building & Decoration Co.,Ltd.

Address before: 215011, Deng Wei Road 6, Suzhou New District, Jiangsu, Suzhou

Patentee before: Suzhou Kelida Building Decoration Engineering Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20101013