CN201598652U - 双向同步施工转换结构 - Google Patents

双向同步施工转换结构 Download PDF

Info

Publication number
CN201598652U
CN201598652U CN2010200329730U CN201020032973U CN201598652U CN 201598652 U CN201598652 U CN 201598652U CN 2010200329730 U CN2010200329730 U CN 2010200329730U CN 201020032973 U CN201020032973 U CN 201020032973U CN 201598652 U CN201598652 U CN 201598652U
Authority
CN
China
Prior art keywords
construction
conversion beam
converting
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010200329730U
Other languages
English (en)
Inventor
朱毅敏
黄玉林
赵光明
姚杰
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai First Construction Co Ltd
Original Assignee
Shanghai First Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai First Construction Co Ltd filed Critical Shanghai First Construction Co Ltd
Priority to CN2010200329730U priority Critical patent/CN201598652U/zh
Application granted granted Critical
Publication of CN201598652U publication Critical patent/CN201598652U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本实用新型公开了一种双向同步施工转换结构,包括转换梁,所述转换梁设置于逆作顶板的上方,上部结构下端与转换梁固定连接,下部结构支撑立柱上端与转换梁固定连接。本实用新型同步施工转换结构通过将上部结构与下部结构支撑立柱分别连接,从而可以调解立柱之间的差异沉降,能有效减少立柱之间的差异沉降,确保结构的施工质量。

Description

双向同步施工转换结构
技术领域
本实用新型属于土工工程施工技术领域,特别是一种用于逆作法施工的双向同步施工转换结构。
背景技术
双向同步逆作法施工时,因基础底板尚未形成就要进行上部结构的施工,上部结构不同部位荷载不同,传递到立柱上的力有所差异,会导立柱之间的差异沉降,导致结构损伤或开裂等现象,从而影响结构的质量。
发明内容
本实用新型所要解决的技术问题是提供一种双向同步施工转换结构,其可以满足双向同步施工的需要,解决双向同步施工立柱之间差异沉降大、结构损伤严重等问题。
本实用新型解决技术问题的技术方案如下:
一种双向同步施工转换结构,其特征在于,包括转换梁,所述转换梁设置于逆作顶板的上方,上部结构下端与转换梁固定连接,下部结构支撑立柱上端与转换梁固定连接。
由以上公开的技术方案可知,本实用新型同步施工转换结构通过将上部结构与下部结构支撑立柱分别连接,从而可以调解立柱之间的差异沉降,能有效减少立柱之间的差异沉降,确保结构的施工质量。
附图说明
图1为本实用新型结构示意图。
附图标记如下:
1、转换梁            2、上部结构
3、逆作顶板          4、地下结构
5、下部结构支撑立柱
具体实施方式
下面结合附图和实施例对本实用新型进行进一步描述。
如图1所示,本实用新型双向同步施工转换结构,包括转换梁1,所述转换梁1设置于逆作顶板3的上方,上部结构2下端与转换梁1固定连接,下部结构支撑立柱5上端与转换梁1固定连接。
更进一步,所述转换梁1的高度为1m~1.5m。
所述转换梁1的宽度与剪力墙同宽。
本实用新型施工方法:首层逆作顶板1结构施工完毕后,地上结构向上施工,地下结构4向下施工。进行上部结构施工前,先在逆作顶板上方施工转换梁,转换梁将上部结构2及其临近下部结构支撑立柱5连接起来,用以调解立柱之间的差异沉降,转换梁1在基础底板施工完毕后拆除。
以上所述仅为本实用新型的最佳实施方式,并非用来限制本实用新型的保护范围,凡是依照本实用新型权利要求所做的同等变换,均在本实用新型的保护范围之内。

Claims (3)

1.一种双向同步施工转换结构,其特征在于,包括转换梁(1),所述转换梁(1)设置于逆作顶板(3)的上方,上部结构下端与转换梁(1)固定连接,下部结构支撑立柱(5)上端与转换梁(1)固定连接。
2.根据权利要求1所述的双向同步施工转换结构,其特征在于,所述转换梁(1)的高度为1.2m~1.5m。
3.根据权利要求1所述的双向同步施工转换结构,其特征在于,所述转换梁(1)的宽度与剪力墙同宽。
CN2010200329730U 2010-01-12 2010-01-12 双向同步施工转换结构 Expired - Fee Related CN201598652U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010200329730U CN201598652U (zh) 2010-01-12 2010-01-12 双向同步施工转换结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010200329730U CN201598652U (zh) 2010-01-12 2010-01-12 双向同步施工转换结构

Publications (1)

Publication Number Publication Date
CN201598652U true CN201598652U (zh) 2010-10-06

Family

ID=42809702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010200329730U Expired - Fee Related CN201598652U (zh) 2010-01-12 2010-01-12 双向同步施工转换结构

Country Status (1)

Country Link
CN (1) CN201598652U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040810A (zh) * 2015-07-28 2015-11-11 广东省建筑设计研究院 适用于框支剪力墙结构逆作法施工的连接节点
CN105544795A (zh) * 2015-12-11 2016-05-04 中信建筑设计研究总院有限公司 剪力墙逆作法设计施工处理方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040810A (zh) * 2015-07-28 2015-11-11 广东省建筑设计研究院 适用于框支剪力墙结构逆作法施工的连接节点
CN105040810B (zh) * 2015-07-28 2017-06-06 广东省建筑设计研究院 适用于框支剪力墙结构逆作法施工的连接节点
CN105544795A (zh) * 2015-12-11 2016-05-04 中信建筑设计研究总院有限公司 剪力墙逆作法设计施工处理方法
CN105544795B (zh) * 2015-12-11 2017-09-01 中信建筑设计研究总院有限公司 剪力墙逆作法设计施工处理方法

Similar Documents

Publication Publication Date Title
CN203626251U (zh) 双层混凝土墙模板支撑结构
CN202509404U (zh) 一种高墩单柱盖梁模板施工支撑系统
CN203256761U (zh) 一种设置在地下室顶板上的塔吊基础
CN102849602B (zh) 自动扶梯或自动人行道上防地震保护装置
CN205295963U (zh) 大跨径钢箱梁顶推施工用横向纠偏支撑结构
CN102041899A (zh) 工业厂房杯口基础重型柱子轴线偏差调整方法
CN204266124U (zh) 大节段钢箱梁预拼装胎架
CN201598652U (zh) 双向同步施工转换结构
CN201554034U (zh) 逆作施工后浇带水平嵌固支撑结构
CN205223837U (zh) 一种带钢拉杆的y形桥墩
CN205224272U (zh) 一种钢结构厂房用悬挑结构
CN203905597U (zh) 一种具有钻越、跨越功能的组合式高低横担
CN204212263U (zh) 一种具有高稳固性梁柱节点的建筑框架
CN201883728U (zh) 换流站用直流滤波器构架
CN204356793U (zh) 一种装配式中空钢筋混凝土独立基础
CN204225459U (zh) 一种建筑工地用支撑架
CN202220438U (zh) 跳台钢模板支撑体系
CN203022366U (zh) 网架安装临时支撑格构柱
CN203795448U (zh) 一种建筑地基
CN203238980U (zh) 型钢支撑模结构
CN204023603U (zh) 一种抗剪螺杆式通信基站基础
CN205444230U (zh) 光伏直流防雷汇流箱安装基础
CN202707074U (zh) 一种衬砌台车
CN203782742U (zh) 一种安装于地下室顶板上的压重式塔吊基础结构
CN203514203U (zh) 大跨钢结构桥顶推施工混凝土矩形垫块

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101006

Termination date: 20120112