CN201598571U - Novel central cable-stayed bridge construction basket hanging device - Google Patents

Novel central cable-stayed bridge construction basket hanging device Download PDF

Info

Publication number
CN201598571U
CN201598571U CN2010200229944U CN201020022994U CN201598571U CN 201598571 U CN201598571 U CN 201598571U CN 2010200229944 U CN2010200229944 U CN 2010200229944U CN 201020022994 U CN201020022994 U CN 201020022994U CN 201598571 U CN201598571 U CN 201598571U
Authority
CN
China
Prior art keywords
beam section
gusseted
type main
main truss
supporting type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010200229944U
Other languages
Chinese (zh)
Inventor
叶新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010200229944U priority Critical patent/CN201598571U/en
Application granted granted Critical
Publication of CN201598571U publication Critical patent/CN201598571U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a novel central cable-stayed bridge construction basket hanging device; the rear half part of a triangular supporting type main truss is arranged above a poured beam section, the front half part of the triangular supporting type main truss is arranged above a non-poured beam section, a siding piece is fixedly arranged at the bottom part of the triangular supporting type main truss, the sliding piece is arranged on a track connected with the poured beam section, the front end of the triangular supporting type main truss is connected with a bottom basket by a front suspender, the middle part of the triangular supporting type main truss is connected with the bottom basket by a rear suspender which penetrates through the poured beam section, and the rear end of the triangular supporting type main truss is connected with the poured beam section by an anchor rod. In the utility model, the structure is rational, the working effect is good, and the device is particularly suitable for the construction of the central cable-stayed bridge which has complex beam and longer sections in each pouring, has the beam body with integral width, has heavy dead weight of prestressed reinforced concrete in each pouring, and can bear more than 400t of the dead weight of the beam block.

Description

Novel rachis face CONSTRUCTION OF CABLE-STAYED BRIDGE hanging basket device
Technical field:
The utility model relates to a kind of rachis face CONSTRUCTION OF CABLE-STAYED BRIDGE hanging basket device.
Background technology:
The girder pre-stressed concrete beam body of long-span bridge often adopts Hanging Basket to carry out cantilever pouring, but existing cradle structure can not fine adaptation rachis face CONSTRUCTION OF CABLE-STAYED BRIDGE.
Summary of the invention:
It is a kind of rational in infrastructure that the purpose of this utility model is to provide, and can adapt to the novel rachis face CONSTRUCTION OF CABLE-STAYED BRIDGE hanging basket device of rachis face CONSTRUCTION OF CABLE-STAYED BRIDGE.
Technical solution of the present utility model is:
A kind of novel rachis face CONSTRUCTION OF CABLE-STAYED BRIDGE hanging basket device, it is characterized in that: comprise gusseted formula main couple, the latter half of gusseted formula main couple is positioned at and waters beam section top, the first half of gusseted formula main couple is positioned at and does not water beam section top, gusseted formula main couple bottom installs sliding part, sliding part be arranged on water the track that the beam section is connected on, gusseted formula main couple front end is connected with end basket by preceding suspension rod, gusseted formula main couple middle part is connected with end basket by being installed on the rear suspension bar that waters in the beam section, gusseted formula main couple rear end by anchor pole with water the beam section and be connected.
The utility model is rational in infrastructure, the prestressed reinforced concrete that good working effect, the sections piece spare length of be particularly suitable for beam body complexity, at every turn building are long, the beam body is whole wide cut, build at every turn uses from rachis face CONSTRUCTION OF CABLE-STAYED BRIDGE great, that can bear more than the beam body piece section deadweight 400t.
Description of drawings:
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is the configuration diagram of an embodiment of the utility model.
The specific embodiment:
A kind of novel rachis face CONSTRUCTION OF CABLE-STAYED BRIDGE hanging basket device, comprise gusseted formula main couple 1, the latter half of gusseted formula main couple is positioned at and waters beam section 9 tops, the first half of gusseted formula main couple is positioned at and does not water beam section 10 tops, gusseted formula main couple bottom installs sliding part 2,3, sliding part be arranged on water the track 4 that the beam section is connected on, gusseted formula main couple front end is connected with end basket 6 by preceding suspension rod 5, gusseted formula main couple middle part is connected with end basket 6 by being installed on the rear suspension bar 7 that waters in the beam section, gusseted formula main couple rear end by anchor pole 8 with water beam section 9 and be connected.

Claims (1)

1. novel rachis face CONSTRUCTION OF CABLE-STAYED BRIDGE hanging basket device, it is characterized in that: comprise gusseted formula main couple, the latter half of gusseted formula main couple is positioned at and waters beam section top, the first half of gusseted formula main couple is positioned at and does not water beam section top, gusseted formula main couple bottom installs sliding part, sliding part be arranged on water the track that the beam section is connected on, gusseted formula main couple front end is connected with end basket by preceding suspension rod, gusseted formula main couple middle part is connected with end basket by being installed on the rear suspension bar that waters in the beam section, gusseted formula main couple rear end by anchor pole with water the beam section and be connected.
CN2010200229944U 2010-01-05 2010-01-05 Novel central cable-stayed bridge construction basket hanging device Expired - Fee Related CN201598571U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010200229944U CN201598571U (en) 2010-01-05 2010-01-05 Novel central cable-stayed bridge construction basket hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010200229944U CN201598571U (en) 2010-01-05 2010-01-05 Novel central cable-stayed bridge construction basket hanging device

Publications (1)

Publication Number Publication Date
CN201598571U true CN201598571U (en) 2010-10-06

Family

ID=42809620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010200229944U Expired - Fee Related CN201598571U (en) 2010-01-05 2010-01-05 Novel central cable-stayed bridge construction basket hanging device

Country Status (1)

Country Link
CN (1) CN201598571U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758404A (en) * 2012-07-19 2012-10-31 中铁十六局集团第一工程有限公司 Front fulcrum hanging basket travelling device of spatial V-shaped cable-stayed bridge
CN103437302A (en) * 2013-08-21 2013-12-11 中交二公局第一工程有限公司 Hanging basket construction method for suspension pouring section of single cable plane cable-stayed bridge
CN106758841A (en) * 2016-12-29 2017-05-31 中交第三航务工程局有限公司 A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN110528402A (en) * 2019-09-03 2019-12-03 重庆城建控股(集团)有限责任公司 A kind of construction method of the more purlin piece combination Hanging Baskets of ultra-wide box beam

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758404A (en) * 2012-07-19 2012-10-31 中铁十六局集团第一工程有限公司 Front fulcrum hanging basket travelling device of spatial V-shaped cable-stayed bridge
CN102758404B (en) * 2012-07-19 2014-01-08 中铁十六局集团第一工程有限公司 Front fulcrum hanging basket travelling device of spatial V-shaped cable-stayed bridge
CN103437302A (en) * 2013-08-21 2013-12-11 中交二公局第一工程有限公司 Hanging basket construction method for suspension pouring section of single cable plane cable-stayed bridge
CN106758841A (en) * 2016-12-29 2017-05-31 中交第三航务工程局有限公司 A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN110528402A (en) * 2019-09-03 2019-12-03 重庆城建控股(集团)有限责任公司 A kind of construction method of the more purlin piece combination Hanging Baskets of ultra-wide box beam
CN110528402B (en) * 2019-09-03 2021-05-11 重庆城建控股(集团)有限责任公司 Construction method of ultra-wide box girder multi-truss-piece combined hanging basket

Similar Documents

Publication Publication Date Title
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN201598571U (en) Novel central cable-stayed bridge construction basket hanging device
CN203668833U (en) Steel web locating device
CN203603028U (en) Railway concrete filled steel tube rigid frame tied arch-steel box connecting beam composite bridge
CN202688888U (en) Deck type reversely hung template hanging frame
CN102808373B (en) Quick assembled type truss string structure People's Bank of China steel bridge
CN201459732U (en) Simple support guide device for pile casing sinking
CN201260050Y (en) 220KV bracket for replacing bus bar column insulator
CN203307736U (en) Reinforced concrete T-shaped beam bridge reinforced structure
CN202401394U (en) Crossbeam structure of railway steel-girder cable-stayed bridge decking
CN202064276U (en) Cable-girder anchorage structure of railway steel truss cable stayed bridge
CN204357000U (en) A kind of precast and assembled reinforced concrete spinous process of the seventh cervical vertebra frame
CN207130600U (en) Board-like suspension rod wind resistance guiding device
CN102704400A (en) Tensioning method for prestressed concrete
CN202450450U (en) Reinforcement and reconstruction structure of suspension bridge
CN204626259U (en) Frange plate integrated apparatus is watered after cable-stayed bridge main-beam dragging suspension basket
CN211446550U (en) Special-shaped pedestrian bridge structure with camber arch rib and single-side sling curved main beam
CN203451109U (en) I-shaped steel truss device for tower crane attachment
CN202830730U (en) Bridge small angle inclining striding structure
CN203066357U (en) Large-span arch-shaped steel truss structure
CN202081385U (en) Adjustable main truss hanging basket
CN207452730U (en) A kind of irregular box-girder strutting system
CN201187035Y (en) Overhead walkway cable-stayed bridge tower
CN201695343U (en) Universal lifting appliance for variable span precast beam
CN203603260U (en) Light stable connecting structure of prefabricated building wall beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101006

Termination date: 20120105