CN201583827U - Building construction field safety monitoring system - Google Patents

Building construction field safety monitoring system Download PDF

Info

Publication number
CN201583827U
CN201583827U CN2010200502306U CN201020050230U CN201583827U CN 201583827 U CN201583827 U CN 201583827U CN 2010200502306 U CN2010200502306 U CN 2010200502306U CN 201020050230 U CN201020050230 U CN 201020050230U CN 201583827 U CN201583827 U CN 201583827U
Authority
CN
China
Prior art keywords
network switch
signal transmission
monitor
output terminal
zone controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010200502306U
Other languages
Chinese (zh)
Inventor
陈春松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU XIANXING INDUSTRY EQUIPMENT INSTALLATION Co Ltd
Original Assignee
JIANGSU XIANXING INDUSTRY EQUIPMENT INSTALLATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU XIANXING INDUSTRY EQUIPMENT INSTALLATION Co Ltd filed Critical JIANGSU XIANXING INDUSTRY EQUIPMENT INSTALLATION Co Ltd
Priority to CN2010200502306U priority Critical patent/CN201583827U/en
Application granted granted Critical
Publication of CN201583827U publication Critical patent/CN201583827U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model relates to a building construction field safety monitoring system, which comprises a monitoring computer, a network switch, a plurality of field monitoring devices, filed area controllers, signal transmission devices and a terminal display device. The utility model is characterized in that the output ends of the field monitoring devices are respectively connected with the corresponding filed area controllers, the output ends of the field area controllers are respectively connected with the corresponding signal transmission devices, the output ends of the signal transmission devices are connected with the network switch, the output end of the network switch is connected with the monitoring computer, and the output end of the monitoring computer is connected with the terminal display device. The utility model has the advantages that the system can find potential construction field safety hazards and give alarms in time, and the safety management is enhanced.

Description

A kind of construction site safety monitoring system
Technical field
The utility model relates to a kind of safety monitoring system, particularly a kind of construction site safety monitoring system.
Background technology
The construction site safety management involves a wide range of knowledge, as Electrical Safety, device security, operator safety, framing scaffold load-bearing safety management or the like.At its engineering site, because beyond thought safety problem may take place at any time, and any one safety problem fails in time to find and get rid of, and all may cause serious accident to take place.At present, all there is fairly perfect security system the common buildings working-yard, and it to the Generally Recognized as safe accident active prevention effect takes place all to have.But adopt technological means that engineering site is implemented the safety monitoring management also is short of very much.
Therefore, the numerous aspects how safety management relates at engineering site are in time found potential safety hazard and are reported to the police rapidly, become a major issue of construction site safety management.
Summary of the invention
The utility model provides a kind of construction site safety monitoring system for solving the problem that present construction site shortcoming technological means is carried out safety management, makes people can in time find potential safety hazard in the engineering site.
The technical scheme that the utility model addresses the above problem is:
A kind of construction site safety monitoring system, comprise the supervisory control comuter and the network switch, and some field monitoring equipment, on-the-spot zone controller, signal transmission apparatus and terminal presentation facility, described field monitoring equipment output end connects corresponding on-the-spot zone controller respectively, on-the-spot zone controller output terminal divides and connects corresponding signal transmission apparatus in addition, the signal transmission apparatus output terminal all connects the network switch, network switch output terminal connects supervisory control comuter, supervisory control comuter output terminal connecting terminal display device.
Described field monitoring equipment is current sensor, or correlation infrared observation device, or pyroelectric infrared sensor, or the GPS displacement monitor, or solid state pressure sensor, or video camera, or anemoscope; Described terminal presentation facility is an audible-visual annunciator, or monitor, or projector, or video memory; And current sensor, correlation infrared observation device, pyroelectric infrared sensor, the GPS displacement monitor, solid state pressure sensor, anemoscope connect audible-visual annunciator respectively; Video camera connects monitor, projector and video memory.
The beneficial effects of the utility model are: it is by being provided with some field monitoring equipment at construction site, obtain the monitor signal of engineering site potential safety hazard situation in real time, and monitor signal is transferred to supervisory control comuter, make warning rapidly by computer data comparison, thereby in time remind managerial personnel to find potential safety hazard in the engineering site.Its engineering site potential safety hazard of can in time finding and report to the police strengthens safety management.
Description of drawings
Fig. 1 is the utility model structure block diagram.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing:
As shown in Figure 1, one one kinds of construction site safety monitoring systems, comprise the supervisory control comuter and the network switch, and some field monitoring equipment, on-the-spot zone controller, signal transmission apparatus and terminal presentation facility, it is characterized in that: described field monitoring equipment output end connects corresponding on-the-spot zone controller respectively, on-the-spot zone controller output terminal connects corresponding signal transmission apparatus respectively, the signal transmission apparatus output terminal all connects the network switch, network switch output terminal connects supervisory control comuter, supervisory control comuter output terminal connecting terminal display device.
Described field monitoring equipment comprises current sensor, correlation infrared observation device, pyroelectric infrared sensor, GPS displacement monitor, solid state pressure sensor, video camera, anemoscope; Described terminal presentation facility comprises audible-visual annunciator, monitor, projector, video memory; And current sensor, correlation infrared observation device, pyroelectric infrared sensor, GPS displacement monitor, solid state pressure sensor, anemoscope connect an audible-visual annunciator respectively; Video camera connects monitor, projector and video memory.
During application, can
1, a current sensor is installed according to the design partition capacity in each loop of electricity consumption panel box at engineering construction scene, and the monitoring output signal of this current sensor just is transferred to nearby on-the-spot zone controller.
2, video camera is installed according to the visual angle needs in the place of building external wall, each gateway, gate, material elevator, vertical transport hanging basket and needs enforcement video monitoring, and the monitoring output signal of this video camera just is transferred to on-the-spot zone controller nearby.
3, security control warning line, enclosure wall, forbid swarming into control line and correlation infrared ray device be installed according to control length, and import the monitoring output signal of this correlation infrared observation device into on-the-spot zone controller nearby.
4, materials warehouse, the processing site area of monitoring as required need be installed pyroelectric infrared sensor, and the monitoring output signal of this pyroelectric infrared sensor is transferred to nearby on-the-spot zone controller.
5, large-span cast-in-situ build concrete walls shuttering, generous amount cast-in-placely build concrete component shuttering, super degree of depth foundation ditch side wall, retaining wall, according to the long-pending GPS displacement monitor that some is installed of monitoring picture, and the monitoring output signal of this GPS displacement monitor is transferred to on-the-spot zone controller nearby.
6, tower crane derrick, vertical tower derrick, superelevation construction scaffolding are installed the GPS displacement monitor, and the monitoring output signal of this GPS displacement monitor is transferred to on-the-spot zone controller nearby.
7, tower crane derrick, vertical tower derrick, superelevation construction scaffolding are installed anemoscope, and the monitoring output signal of this anemoscope is transferred to on-the-spot zone controller nearby.
8, large-span cast-in-situ is built concrete component template support post, the load-bearing framing scaffold is installed solid state pressure sensor according to design Monitoring and Controlling point, and monitoring output signal is transferred to on-the-spot zone controller nearby.
Above-mentioned each on-the-spot zone controller becomes digital signal with the analog signal conversion of field monitoring equipment, select through the power carrier transceiver according to the engineering site actual conditions then, perhaps Optical Fiber Transmission coupling mechanism, perhaps the wireless receiving and dispatching modulator-demodular unit transfers signals to the network switch and supervisory control comuter processing, and supervisory control comuter is reacted rapidly after handling.When run into restricted speed signal, the signal that transfinites, the undesired signal of swarming into just transfer signals to audible-visual annunciator; The vision signal that video camera monitors alarm region can switch to giant-screen and projector automatically, and the daily vision signal of video camera can correspondence be transferred to monitor and monitors in real time, also vision signal can be stored in video memory in 24 hours, call when needing fully and check.
Therefore, the utility model can be to Electrical Safety, device security, operator safety, the real-time monitoring of framing scaffold load-bearing security implementation at building engineering construction scene, and make warning rapidly by the computer data comparison, in time remind the prevention and control of managerial personnel's safety, the enhancement engineering Safety Management.

Claims (2)

1. construction site safety monitoring system, comprise the supervisory control comuter and the network switch, and some field monitoring equipment, on-the-spot zone controller, signal transmission apparatus and terminal presentation facility, it is characterized in that: described field monitoring equipment output end connects corresponding on-the-spot zone controller respectively, on-the-spot zone controller output terminal connects corresponding signal transmission apparatus respectively, the signal transmission apparatus output terminal all connects the network switch, network switch output terminal connects supervisory control comuter, supervisory control comuter output terminal connecting terminal display device.
2. a kind of construction site safety monitoring system according to claim 1 is characterized in that: described field monitoring equipment is current sensor, or correlation infrared observation device, or pyroelectric infrared sensor, or the GPS displacement monitor, or solid state pressure sensor, or video camera, or anemoscope; Described terminal presentation facility is an audible-visual annunciator, or monitor, or projector, or video memory; And current sensor, correlation infrared observation device, pyroelectric infrared sensor, the GPS displacement monitor, solid state pressure sensor, anemoscope connect audible-visual annunciator respectively; Video camera connects monitor, projector and video memory.
CN2010200502306U 2010-01-18 2010-01-18 Building construction field safety monitoring system Expired - Fee Related CN201583827U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010200502306U CN201583827U (en) 2010-01-18 2010-01-18 Building construction field safety monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010200502306U CN201583827U (en) 2010-01-18 2010-01-18 Building construction field safety monitoring system

Publications (1)

Publication Number Publication Date
CN201583827U true CN201583827U (en) 2010-09-15

Family

ID=42725834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010200502306U Expired - Fee Related CN201583827U (en) 2010-01-18 2010-01-18 Building construction field safety monitoring system

Country Status (1)

Country Link
CN (1) CN201583827U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103186822A (en) * 2011-12-27 2013-07-03 上海市第七建筑有限公司 Troubleshooting and early warning management system for potential quality hazards of engineering project
CN104594378A (en) * 2015-02-11 2015-05-06 中国水利水电第四工程局有限公司 Retaining wall construction method
CN105007455A (en) * 2015-07-13 2015-10-28 中山市拓维电子科技有限公司 Monitoring system for highway engineering construction site
CN105049801A (en) * 2015-07-13 2015-11-11 中山市拓维电子科技有限公司 Video data transfer device
CN105182866A (en) * 2015-07-13 2015-12-23 中山市拓维电子科技有限公司 Construction project real-time monitoring system
CN106527267A (en) * 2016-11-24 2017-03-22 蓬溪斌鹏科技有限公司 Construction personnel monitoring system used for construction site
CN106971512A (en) * 2017-04-20 2017-07-21 浙江舟水建设有限公司 Construction for Hydroelectric Project potential safety hazard monitoring method based on Internet of Things
CN107330664A (en) * 2016-05-12 2017-11-07 上海点贸信息技术有限公司 A kind of intelligence based on Internet of Things builds management system
CN107745929A (en) * 2017-08-31 2018-03-02 芜湖鸣人热能设备有限公司 Steel plate high-altitude conveying arrangement
CN109584530A (en) * 2018-12-29 2019-04-05 上海建工集团股份有限公司 A kind of construction site wireless system for transmitting data and data transmission method
CN109655113A (en) * 2019-01-30 2019-04-19 广州轨道交通建设监理有限公司 A kind of construction environment monitoring system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103186822A (en) * 2011-12-27 2013-07-03 上海市第七建筑有限公司 Troubleshooting and early warning management system for potential quality hazards of engineering project
CN104594378A (en) * 2015-02-11 2015-05-06 中国水利水电第四工程局有限公司 Retaining wall construction method
CN105007455A (en) * 2015-07-13 2015-10-28 中山市拓维电子科技有限公司 Monitoring system for highway engineering construction site
CN105049801A (en) * 2015-07-13 2015-11-11 中山市拓维电子科技有限公司 Video data transfer device
CN105182866A (en) * 2015-07-13 2015-12-23 中山市拓维电子科技有限公司 Construction project real-time monitoring system
CN107330664A (en) * 2016-05-12 2017-11-07 上海点贸信息技术有限公司 A kind of intelligence based on Internet of Things builds management system
CN106527267A (en) * 2016-11-24 2017-03-22 蓬溪斌鹏科技有限公司 Construction personnel monitoring system used for construction site
CN106971512A (en) * 2017-04-20 2017-07-21 浙江舟水建设有限公司 Construction for Hydroelectric Project potential safety hazard monitoring method based on Internet of Things
CN107745929A (en) * 2017-08-31 2018-03-02 芜湖鸣人热能设备有限公司 Steel plate high-altitude conveying arrangement
CN109584530A (en) * 2018-12-29 2019-04-05 上海建工集团股份有限公司 A kind of construction site wireless system for transmitting data and data transmission method
CN109655113A (en) * 2019-01-30 2019-04-19 广州轨道交通建设监理有限公司 A kind of construction environment monitoring system

Similar Documents

Publication Publication Date Title
CN201583827U (en) Building construction field safety monitoring system
CN206709818U (en) High-supported formwork deforms real-time Automatic monitoring systems in Structural Engineering construction
CN202513670U (en) Auxiliary control system of intelligent transformer substation
CN214087383U (en) Building tower crane safety monitoring system
CN105819339A (en) Virtual command module for large lifting operations and working method of virtual command module
CN206863889U (en) The anti-external force of power cable destroys intelligent monitor system
CN102967401A (en) Real-time overload security monitoring and alarming system for old structure
CN109183859A (en) A kind of foundation pit real-time monitoring system
CN202481871U (en) Elevator monitoring device
CN203345877U (en) Elevator long-distance intelligent monitoring device
CN107293076A (en) Transmission line of electricity infrared laser is combined anti-external force destruction on-line monitoring system
CN205045718U (en) Remote control formula tower crane
RU113603U1 (en) INTELLIGENT INTEGRATED SECURITY SYSTEM
CN208076956U (en) Long-range big data wisdom safety management climbing frame control system
CN204163415U (en) There is the discharging platform of auto-alarm function
CN204199656U (en) A kind of attachment type raise scaffold with video safety monitoring system
CN202856903U (en) Audio and video returning system for emergency rescue in wind farm
CN202758448U (en) Electric power construction area rapid defense setting safety monitoring system
CN214692750U (en) Construction elevator integrated monitoring system
CN218261653U (en) Tower crane lifting hook hangs thing collision device
CN213268826U (en) Control system for attached lifting scaffold
CN203012910U (en) Real-time safety monitoring and alarming system for overload of old structures
CN201689315U (en) Guide rail type adhered lifting scaffold monitoring system
CN108460956A (en) The anti-error climbing system for prompting of shaft tower
CN216285030U (en) Intelligent safety net detecting system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100915

Termination date: 20150118

EXPY Termination of patent right or utility model