CN201583648U - Clock remote timing device of electric energy meter - Google Patents

Clock remote timing device of electric energy meter Download PDF

Info

Publication number
CN201583648U
CN201583648U CN2009202767811U CN200920276781U CN201583648U CN 201583648 U CN201583648 U CN 201583648U CN 2009202767811 U CN2009202767811 U CN 2009202767811U CN 200920276781 U CN200920276781 U CN 200920276781U CN 201583648 U CN201583648 U CN 201583648U
Authority
CN
China
Prior art keywords
clock
communication interface
gprs
circuit
chip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202767811U
Other languages
Chinese (zh)
Inventor
刘发展
刘可迎
张鸿雁
徐东升
王峻
孙卉
行明涛
张海鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Zhengzhou Huali Information Technology Co Ltd
Original Assignee
Zhengzhou Power Supply Co of Henan Electric Power Co
Zhengzhou Huali Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Power Supply Co of Henan Electric Power Co, Zhengzhou Huali Information Technology Co Ltd filed Critical Zhengzhou Power Supply Co of Henan Electric Power Co
Priority to CN2009202767811U priority Critical patent/CN201583648U/en
Application granted granted Critical
Publication of CN201583648U publication Critical patent/CN201583648U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Clocks (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The utility model discloses a clock remote timing device of an electric energy meter, comprising a storage module, a power supply management module and a resetting circuit which are connected with a main control circuit, and also comprising a clock circuit, a local communication interface and a remote communication interface which are connected with the main control circuit, wherein the remote communication interface is connected with a main station control platform by a GPRS receiving and transmitting module in a wireless manner; the clock circuit provides clock information for the main control circuit, the local communication interface carries out local communication with the electrical energy meter, and the remote communication interface carries out communication with the GPRS receiving and transmitting module; and the GPRS receiving and transmitting module adopts a GPRS wireless communication mode to report information to the main station control platform or transmit instructions to the main control circuit by the remote communication interface. The clock remote timing device utilizes a remote wireless GPRS technology to lead the clock timing and meter reading of the electric energy meter to be more convenient and automatic, thus solving the problem that the original timing can be carried out by needing to carry more equipment to a site, and improving the automatic management level of a power grid.

Description

The long-range correction device of clock of power meter
Technical field:
The utility model relates to the measurement of electric system electric variable, particularly the long-range correction device of electric energy meter.
Background technology:
Along with increasing sharply of high development of social economy and electricity needs, multiple electricity prices such as point, peak, flat, paddy have begun to implement in full as a kind of control measures of electric load.The application of multi-rate meter also thereupon more and more widely, but present electric energy meter all has clock jitter, and As time goes on, error is increasing, and the deviation of each electric energy meter also has nothing in common with each other, if untimely is like this calibrated, just make each tariff period energy data out of true of each electric energy meter statistics, and it is also asynchronous with the data of other electric energy meter, carrying out at power department like this can producing a lot of inaccurate factors in the statisticss such as transmission line of electricity bus balanced ratio, line loss per unit.So the accuracy of electric energy clock is related to management and the examination of power department to electric energy, more involves the economic interests between user and enterprise and the enterprise.Therefore the clock accuracy that improves electric energy meter becomes our task of top priority
The utility model content:
Technical problem to be solved in the utility model provides a kind of clock of power meter long-range correction device at above deficiency exactly, during by the remote server school and this locality self clock automatic correcting time dual mode, guaranteed the accuracy of clock of power meter, also increased the function of remote automatic meter reading simultaneously, promptly solved manual metering time-consuming, the effort problem.
Technical solution adopted in the utility model is:
The long-range correction device of a kind of clock of power meter, include the memory module that is connected with governor circuit, power management module, reset circuit, also comprise with governor circuit and be connected clock circuit, local communication interface, remote communication interface, remote communication interface is by GPRS reception and sending module and main website control platform wireless connections, clock circuit, local communication interface, remote communication interface is respectively governor circuit clock information is provided, carry out local communication with electric energy meter and receive with GPRS and sending module communicates, the GPRS mould receives and sending module adopts the GPRS communication to instruct to governor circuit reception and registration to main website control platform reporting information or by remote communication interface.
Governor circuit also is connected with indicator light circuit, indication power supply, communication, fault and GPRS online information.
Governor circuit includes main control chip U1, main control chip U1 adopts W77E58 as microcontroller, its inner integrated Flash memory under program of 32KB, the RAM of 256B and the external RAM of 1K, has low power mode of operation, main is that it has the dual serial interface, has satisfied the communication between GPRS reception and sending module and the local electric energy meter simultaneously.
Clock circuit includes high precision clock chip U7, clock chip U7 adopts SD2300CPI, its inner embedding has 32.768K crystal oscillator and 3.6V button cell and stores the SRAM that data are used, and clock accuracy is ± 5ppm (under 25 ± 1 ℃) that promptly year error was less than 2.5 minutes.
Reset circuit includes the chip U8 that resets, the DS1232LPS-2 chip that the chip U8 that resets adopts DALLAS to produce, and power on and off resets and supports external key to reset and watchdog reset, has improved operational reliability greatly.
The beneficial effect that the utility model can reach is:
When 1, the utility model is by the remote server school and local self clock automatic correcting time dual mode, guaranteed the accuracy of clock of power meter, the accuracy of segment data when having guaranteed electric energy meter.
2, the utility model has increased the function of remote concentrated ammeter reading simultaneously, human and material resources have promptly been saved, also improved simultaneously the automatization level of system, the more important thing is the rationality and the intelligent level that have improved State Grid's energy control in some respects and used, accelerated the pace of construction of national intelligent grid.
Description of drawings:
Fig. 1 is a logical organization block diagram of the present utility model.
Fig. 2 is circuit theory diagrams of the present utility model.
Embodiment:
The utility model will be further described below in conjunction with accompanying drawing:
As shown in Figure 1 and Figure 2, the long-range correction device of this clock of power meter, by the memory module 2 that is connected with governor circuit 1, power management module 3, reset circuit 4, local communication interface 5, indicator light circuit 6, clock circuit 7 and remote communication interface 8, remote communication interface 8 receives by GPRS and sending module 9 and main website control platform 10 wireless connections.Wherein: governor circuit 1 includes main control chip U1, main control chip U1 adopts W77E58 as microcontroller, its inner integrated Flash memory under program of 32KB, the RAM of 256B and the external RAM of 1K, has low power mode of operation, main is that it has the dual serial interface, has satisfied the communication between GPRS reception and sending module 9 and the local electric energy meter simultaneously.Clock circuit 7 includes high precision clock chip U7, clock chip U7 adopts SD2300CPI, its inner embedding has 32.768K crystal oscillator and 3.6V button cell and stores the SRAM that data are used, clock accuracy is ± 5ppm (under 25 ± 1 ℃), promptly year error was less than 2.5 minutes, the P15 of clock chip U7, P20 pin and P13, P21 pin are connected with P14, the P15 pin of main control chip U1 respectively, and U1 provides temporal information for main control chip, and are provided with and change according to the order of main control chip U1.Reset circuit 4 includes the chip U8 that resets, the DS1232LPS-2 chip that the chip U8 that resets adopts DALLAS to produce, P5, the P7 pin of chip U8 of resetting is connected with P9, the P35 pin of main control chip U1 respectively, the realization power on and off resets and supports external key to reset and watchdog reset, has improved operational reliability greatly.Memory module 2 adopts the FLASH storer AT45DB041D with 512KBYTE, and the P1 of memory module 2, P2, P4, P8 pin are connected with P35, P34, P33, the P36 pin of main control chip U1 respectively, store clock parameter information and electric energy meter information.Indicator light circuit 6 comprises P39, P38, LED4, the LED3 of P37 pin, the LED2 that is connected main control chip U1, wherein: LED2 communication pilot lamp, LED3 malfunction indicator lamp, the online pilot lamp of LED3 GPRS, LED1 is connected between the high-low level of power management module 3, is power light.Local communication interface 5 and remote communication interface 8 all adopt the MAX485 chip, and wherein: telecommunication chip U10 receives with GPRS by interface P4 and is connected with sending module 9, and local communication chip U9 is connected with electric energy meter by interface P2.
When main website control platform 10 transmitting order to lower levels, this device receives level data by interface P4, be converted to Transistor-Transistor Logic level by telecommunication chip U10 again and send to main control chip U1, whether the order data that main control chip U1 verification receives orders during for the school, if order during the school, just propose temporal information according to communication protocol from this order data, main control chip U1 and clock chip U7 pass through I then 2The C interface communication, the system clock of refresh clock chip U7, process when starting the broadcasting school is then upgraded every electric energy meter time by local communication chip U9 in order; If main control chip U1 receives is that other parameter is provided with order, and main control chip U1 just stores the interface modes of supplemental characteristic by SPI in the memory module 2 into.During operate as normal, interval time and checking meter interval time when whether the cycle criterion of this device has arrived the school, if interval time when having arrived the school, process when just starting the school, reading the clock of every electric energy meter compares with the clock of self, if difference greater than 5 seconds, to main website control platform 10, informs that main website control platform 10 these clock of power meter are overproof with regard to the overproof incident of last time signal clock; If setup time to the interlude of checking meter just start the process of checking meter.Copy and accept electric energy meter electric energy data by local communication interface 5 in order, copy and accept the back that finishes and issue main website control platform 10 by reporting automatically.In a word, this device utilizes long distance wireless GPRS technology, when making the clock of power meter school and check meter more facility and robotization, solved original needs and gone on-the-spot problem could the school time with a lot of equipment, improved the automatic management level of electrical network, responded and strengthened the call that national intelligent grid is built.

Claims (5)

1. long-range correction device of clock of power meter, include the memory module that is connected with governor circuit, power management module, reset circuit, it is characterized in that: also comprise with governor circuit being connected clock circuit, local communication interface, remote communication interface, remote communication interface is by GPRS reception and sending module and main website control platform wireless connections, clock circuit, local communication interface, remote communication interface is respectively governor circuit clock information is provided, carry out local communication with electric energy meter and receive with GPRS and sending module communicates, the GPRS mould receives and sending module adopts the GPRS communication to instruct to governor circuit reception and registration to main website control platform reporting information or by remote communication interface.
2. the long-range correction device of clock of power meter as claimed in claim 1, it is characterized in that: governor circuit also is connected with indicator light circuit, indication power supply, communication, fault and GPRS online information.
3. the long-range correction device of clock of power meter as claimed in claim 1 or 2 is characterized in that: governor circuit includes main control chip (U1), and main control chip (U1) adopts W77E58 as microcontroller.
4. the long-range correction device of clock of power meter as claimed in claim 1 or 2 is characterized in that: clock circuit includes high precision clock chip (U7), and clock chip (U7) adopts SD2300CPI.
5. the long-range correction device of clock of power meter as claimed in claim 1 or 2 is characterized in that: reset circuit includes the chip that resets (U8), and the chip that resets (U8) adopts the DS1232LPS-2 chip.
CN2009202767811U 2009-12-10 2009-12-10 Clock remote timing device of electric energy meter Expired - Fee Related CN201583648U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202767811U CN201583648U (en) 2009-12-10 2009-12-10 Clock remote timing device of electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202767811U CN201583648U (en) 2009-12-10 2009-12-10 Clock remote timing device of electric energy meter

Publications (1)

Publication Number Publication Date
CN201583648U true CN201583648U (en) 2010-09-15

Family

ID=42725655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202767811U Expired - Fee Related CN201583648U (en) 2009-12-10 2009-12-10 Clock remote timing device of electric energy meter

Country Status (1)

Country Link
CN (1) CN201583648U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102044912A (en) * 2010-11-25 2011-05-04 深圳市科陆电子科技股份有限公司 Method for concurrently surveying terminal time in batch
CN102636692A (en) * 2012-04-13 2012-08-15 上海大亚科技有限公司 Method for acquiring real-time time of data acquisition module of an intelligent electric meter based on master station time
CN106054106A (en) * 2016-05-25 2016-10-26 宁波三星医疗电气股份有限公司 Watt-hour meter clock abnormality automatic detection method based on power line carrier
CN106940434A (en) * 2017-04-05 2017-07-11 贵州电网有限责任公司电力科学研究院 A kind of long-range calibrating installation of electric energy meter platform and automatic calibrating method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102044912A (en) * 2010-11-25 2011-05-04 深圳市科陆电子科技股份有限公司 Method for concurrently surveying terminal time in batch
CN102044912B (en) * 2010-11-25 2014-03-12 深圳市科陆电子科技股份有限公司 Method for concurrently surveying terminal time in batch
CN102636692A (en) * 2012-04-13 2012-08-15 上海大亚科技有限公司 Method for acquiring real-time time of data acquisition module of an intelligent electric meter based on master station time
CN106054106A (en) * 2016-05-25 2016-10-26 宁波三星医疗电气股份有限公司 Watt-hour meter clock abnormality automatic detection method based on power line carrier
CN106054106B (en) * 2016-05-25 2018-08-31 宁波三星医疗电气股份有限公司 A kind of clock of power meter exception automatic testing method based on power line carrier
CN106940434A (en) * 2017-04-05 2017-07-11 贵州电网有限责任公司电力科学研究院 A kind of long-range calibrating installation of electric energy meter platform and automatic calibrating method

Similar Documents

Publication Publication Date Title
CN202693653U (en) Single-phase fee control intelligent electric energy meter
CN202453481U (en) On-line monitoring system for storage battery capacity
CN201583648U (en) Clock remote timing device of electric energy meter
CN104732751A (en) Automatic meter reading system and automatic meter reading method based on RF (radio frequency) and GPRS (general packet radio service)/3G (the 3rd generation telecommunication)
CN103312563A (en) Automatic information collection method and system based on power line carrier communication
CN202075341U (en) Household electricity parameter recording equipment
CN109374075A (en) Matrix form NB-IoT remote transmission intelligent water meter
CN103439554B (en) A kind of data readback and storage device and system thereof
CN104699553A (en) Clock self-recovery method after failure in acquiring terminal clock battery with electrical information
CN203502453U (en) Wireless public network communication module for three-phase intelligent electric energy meter
CN101592683A (en) Three-phase electronic multi-rate electric energy meter
CN204241616U (en) Based on the smart power grid fault monitoring system of Zigbee-technology
Lu et al. Design and implementation of power information visualization platform based on smart meter
CN102446410B (en) Remote control telecommand box for on-site test of power load management terminal and control method
CN204964593U (en) Settlement electric quantity collection system of new forms of energy power plant
CN107748288A (en) Radio energy table based on radio communication
CN203705945U (en) Measurement data checking terminal for electric power scheduling system
CN204575780U (en) A kind of photovoltaic generation electrical quantity acquisition and analysis device
CN209803235U (en) Electric quantity data extraction device of single-phase intelligent electric energy meter damaged on site
KR102097260B1 (en) Data transmission method for electronic watt-hour meter system
CN210323191U (en) One-way smart electric meter of high in clouds management
CN202339379U (en) Single-phase kilowatt-hour meter with multiple meter-reading modes
CN201555627U (en) Common water meter reading terminal based on 3G network
CN201247284Y (en) Electro-on-site service terminal
CN203465334U (en) Data backward-reading and storing device and system thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHENGZHOU HUALI INFORMATION TECHNOLOGY CO., LTD. H

Free format text: FORMER OWNER: ZHENGZHOU HUALI INFORMATION TECHNOLOGY CO., LTD.

Effective date: 20131029

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY BRANCH

Effective date: 20131029

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 450006 ZHENGZHOU, HENAN PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20131029

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Zhengzhou Huali Information Technology Co., Ltd.

Patentee after: Henan Electric Power Company Zhengzhou Power Supply Branch

Address before: 450006 Huaihe Road, Henan, China, No. 9, No.

Patentee before: Henan Electric Power Company Zhengzhou Power Supply Branch

Patentee before: Zhengzhou Huali Information Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100915

Termination date: 20161210

CF01 Termination of patent right due to non-payment of annual fee