CN201581904U - Porous parallel connection grouting device for reinforcing laneway soft wall rock - Google Patents

Porous parallel connection grouting device for reinforcing laneway soft wall rock Download PDF

Info

Publication number
CN201581904U
CN201581904U CN2009202987402U CN200920298740U CN201581904U CN 201581904 U CN201581904 U CN 201581904U CN 2009202987402 U CN2009202987402 U CN 2009202987402U CN 200920298740 U CN200920298740 U CN 200920298740U CN 201581904 U CN201581904 U CN 201581904U
Authority
CN
China
Prior art keywords
grouting
pipelines
pump
controller
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202987402U
Other languages
Chinese (zh)
Inventor
张农
倪建明
韩昌良
丁允杰
李桂臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN2009202987402U priority Critical patent/CN201581904U/en
Application granted granted Critical
Publication of CN201581904U publication Critical patent/CN201581904U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A porous parallel connection grouting device for reinforcing a laneway soft wall rock comprises a mixing machine, a liquid storage mixing machine, a grouting pump and grouting pipelines, wherein the flow capacity of the grouting pump is bigger than or equal to 52L/min, the grouting pump is connected with a multi-stage grouting controller for controlling a plurality of grouting pipelines through a grouting pipe with big diameter, and the multi-stage grouting controller is composed of a current divider, control valves which are respectively arranged on a plurality of grouting pipelines in turn, a pressure gauge and a flowmeter. The grouting pipe with big diameter is connected with three to nine grouting pipelines through a multi-stage flow dividing controller, a plurality of grouting holes are constructed on the same positions with similar damage or crack development degrees on a bottom board, side portions and a top plate in one zone of a laneway, grouting anchor rods are installed, a plurality of grouting anchor rods are connected through a plurality of grouting pipelines, grouting to a plurality of grouting holes simultaneously can be realized, the grouting speed can be increased by more than three to nine times, and the wall rock self-bearing ability can be greatly improved.

Description

The porous parallel-connected grouting device that is used for reinforcing roadway weak surrounding rock
Technical field
The utility model relates to a kind of porous grouting device, and especially a kind of porous parallel-connected grouting device that is applicable to reinforcing roadway weak surrounding rock belongs to roadway weak broken wall rock support engineering field.
Background technology
The weak surrounding rock grouting process in recent years at home and abroad the colliery tunnel support field obtain to a certain degree application, its objective is by the grouting filling wall-rock crack, broken sillar gluing is reinforced whole, fully improve the self-bearing capacity of country rock, improve supporting effect, in the big tunnel of water yield, also can play the effect of water blockoff antiseepage.But there is following problem in the existing grouting process in colliery: 1. injected hole adopts single rectangular arrangement mode, and slurries at first to the crack infiltration of comparatively growing, have stoped the reinforcing to the hypotonicity argillaceous soft rock; 2. adopt the construction of low discharge grouting pump single hole, speed is slow, efficient is low, has become the bottleneck of tunnel speedy drivage; 3. owing to lack the control method of slip casting process, often cause in the operation to lack and annotate, leak and annotate, do not reach the grouting quality requirement; 4. some mine is arranged the operation simultaneously of a large amount of personnel and equipment for satisfying schedule requirement, causes personnel and hold facility, and normal tunneling construction is produced bigger influence.
Summary of the invention
Technical problem: the purpose of this utility model provides a kind of simple in structure, and injection speed is fast, efficient height, the effective porous parallel-connected grouting device that is used for reinforcing roadway weak surrounding rock.
Technical scheme: the utility model is used for the porous parallel-connected grouting device of reinforcing roadway weak surrounding rock, comprise mixer, liquid storage mixer, grouting pump, grouting pipeline, flow 〉=the 52L/min of described grouting pump, grouting pump is connected with the multistage slip casting controller of controlling many grouting pipelines through large diameter Grouting Pipe, and control valve, pressure meter, flowmeter that multistage slip casting controller is located on many grouting pipelines by current divider, are respectively successively formed.
Described many grouting pipelines are 3~9; The internal diameter of described large diameter Grouting Pipe is about 50mm.
Beneficial effect: the utility model adopts the electronic grouting pump of big flow, substitutes the pneumatic grouting pump of former low discharge, and flow rate of grouting is more than 4~5 times of original technology; Adopt multistage slip casting controller, simultaneously 3~9 Grouting Pipe are implemented continuous slip casting, the slip casting simultaneously of the big flow of realization-pump porous by current divider; Pressure meter, flowmeter and control valve all are housed on every grouting pipeline, each bar grouting pipeline is controlled respectively, respectively each grouting pipeline of finishing slip casting in the different time is carried out the slip casting of next circulation, improved the speed and the effect of slip casting greatly.The utility model one pump porous slip casting simultaneously and working continuously improves injection speed more than 3~9 times, and each grouting pipeline is realized instant control, improves the arrangement of injected hole, improves grouting quality, guarantees the roadway grouting supporting effect.Full advance moon progress 80m, than former U shaped steel totally-enclosed supporting moon progress raising 20m, supporting effect is good, and the tunnel does not have distortion substantially.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is a multistage slip casting controller architecture schematic diagram of the present utility model.
Among the figure: 1-mixer, 2-liquid storage mixer, 3-grouting pump, 4-major diameter footpath Grouting Pipe, the multistage slip casting controller of 5-, 6-grouting pipeline, 7-grouted anchor bar, 5-1-current divider, 5-2-control valve, 5-3-pressure meter, 5-4-flowmeter.
The specific embodiment
Porous parallel-connected grouting device of the present utility model, mainly constitute by mixer 1, liquid storage mixer 2, grouting pump 3, large diameter Grouting Pipe 4, multistage slip casting controller 5 and many grouting pipelines 6, wherein mixer 1 links to each other with liquid storage mixer 2, and grouting pump 3 links to each other with liquid storage mixer 2; Adopting the flow 〉=52L/min of grouting pump 3 is big flow grouting pump; Many grouting pipeline 6 is 3~9; The internal diameter of major diameter Grouting Pipe 4 is about 50mm.The grouting pump 6 of big flow is connected with the multistage slip casting controller 5 of controlling many grouting pipelines 6 through large diameter Grouting Pipe 4, and control valve 5-2, pressure meter 5-3, flowmeter 5-4 that multistage slip casting controller 5 is located on many grouting pipelines 6 by current divider 5-1, respectively successively form.Major diameter grouting pipeline 4 is divided into many grouting pipelines 6 through multistage slip casting controller 5 provides slurries, multistage slip casting controller 5 can monitor in real time and control each bar grouting pipeline 6 respectively, connect the grouted anchor bar 7 that the quincunx cloth of array pitch hole is provided with between a plurality of pressing respectively by many grouting pipelines 6, simultaneously a plurality of injected holes are implemented slip casting.
During work, in the good a plurality of injected holes of construction, grouted anchor bar 7 is installed respectively, then with rapid setting cement or hole packer sealing of hole, the degree of depth 〉=300mm of sealing of hole; Afterwards, select the electronic grouting pump 3 of flow 〉=52L/min for use, major diameter Grouting Pipe 4 by connecting electronic grouting pump 3, through multistage slip casting controller 5 with the slurries that prepare simultaneously via many grouting pipelines 6 and each grouted anchor bar 7 injection hole that links to each other with many grouting pipelines 6 respectively of connecting thereon in, the enforcement porous parallel-connected grouting; In the process of implementing slip casting, by observing flow rate of grouting table 5-4 on the multistage slip casting controller 5 and the data of pressure meter 5-3, flow and the pressure that each grouting pipeline 6 injects slurries is held in support respectively, when wherein hole slurries no longer flow, and the grouting pressure that pressure meter 5-3 shows reaches 2MPa when above, close the control valve 5-2 of this pipeline, this grouting pipeline 6 taken off be connected on the next grouted anchor bar, implement the slip casting of next injected hole, circulation successively, switch each grouting pipeline 6 respectively, realize porous parallel-connected grouting.

Claims (3)

1. device that is used for the porous parallel-connected grouting method of reinforcing roadway weak surrounding rock, comprise mixer (1), liquid storage mixer (2), grouting pump (3), grouting pipeline (6), it is characterized in that: the flow 〉=52L/min of described grouting pump (3), grouting pump (3) is connected with the multistage slip casting controller (5) of controlling many grouting pipelines (6) through large diameter Grouting Pipe (4), and control valve (5-2), pressure meter (5-3), flowmeter (5-4) that multistage slip casting controller (5) is located on many grouting pipelines (6) by current divider (5-1), are respectively successively formed.
2. the porous parallel-connected grouting device that is used for reinforcing roadway weak surrounding rock according to claim 1 is characterized in that: described many grouting pipelines (6) are 3~9.
3. the porous parallel-connected grouting device that is used for reinforcing roadway weak surrounding rock according to claim 1 is characterized in that: the internal diameter of described large diameter Grouting Pipe (4) is about 50mm.
CN2009202987402U 2009-12-29 2009-12-29 Porous parallel connection grouting device for reinforcing laneway soft wall rock Expired - Fee Related CN201581904U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202987402U CN201581904U (en) 2009-12-29 2009-12-29 Porous parallel connection grouting device for reinforcing laneway soft wall rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202987402U CN201581904U (en) 2009-12-29 2009-12-29 Porous parallel connection grouting device for reinforcing laneway soft wall rock

Publications (1)

Publication Number Publication Date
CN201581904U true CN201581904U (en) 2010-09-15

Family

ID=42723901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202987402U Expired - Fee Related CN201581904U (en) 2009-12-29 2009-12-29 Porous parallel connection grouting device for reinforcing laneway soft wall rock

Country Status (1)

Country Link
CN (1) CN201581904U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287205A (en) * 2011-05-08 2011-12-21 太原理工大学 Method for improving stability of roadway surrounding rock
CN101749030B (en) * 2009-12-29 2013-04-24 中国矿业大学 Porous parallel-connected grouting method and device for reinforcing roadway weak surrounding rock
CN108035738A (en) * 2017-12-08 2018-05-15 中国矿业大学 The anchoring process of more anchor pole simultaneous quantitative slip castings
CN108340495A (en) * 2018-03-27 2018-07-31 东北大学 A kind of Rock And Soil slip casting flow-dividing control converting system and its application method
CN113513349A (en) * 2021-07-20 2021-10-19 淮北市平远软岩支护工程技术有限公司 Slip casting stock voltage stabilizer suitable for rock burst tunnel steady voltage is consolidated

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101749030B (en) * 2009-12-29 2013-04-24 中国矿业大学 Porous parallel-connected grouting method and device for reinforcing roadway weak surrounding rock
CN102287205A (en) * 2011-05-08 2011-12-21 太原理工大学 Method for improving stability of roadway surrounding rock
CN102287205B (en) * 2011-05-08 2013-07-10 太原理工大学 Method for improving stability of roadway surrounding rock
CN108035738A (en) * 2017-12-08 2018-05-15 中国矿业大学 The anchoring process of more anchor pole simultaneous quantitative slip castings
CN108340495A (en) * 2018-03-27 2018-07-31 东北大学 A kind of Rock And Soil slip casting flow-dividing control converting system and its application method
CN108340495B (en) * 2018-03-27 2023-05-05 东北大学 Rock-soil mass grouting diversion control conversion system and application method thereof
CN113513349A (en) * 2021-07-20 2021-10-19 淮北市平远软岩支护工程技术有限公司 Slip casting stock voltage stabilizer suitable for rock burst tunnel steady voltage is consolidated

Similar Documents

Publication Publication Date Title
CN101749030B (en) Porous parallel-connected grouting method and device for reinforcing roadway weak surrounding rock
CN102121395B (en) Method for integrated comprehensive management of gas in low-permeability single coal bed
CN105507232B (en) A kind of microorganism flat board grouting device and method for reinforcing Liquefaction Foundation
CN201581904U (en) Porous parallel connection grouting device for reinforcing laneway soft wall rock
CN102644469B (en) Ultra-deep hole pre-grouting pipe for crack-developed surrounding rock and grouting method
CN104805842B (en) Steel flower pipe segmented grouting system and construction method thereof
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN202544883U (en) Self-boring full thread hollow grouting anchor rod
CN104895583B (en) Tunnel surrounding rock control method combining pressure relief and slip-casting reinforcement
CN104453930B (en) Tunnel initial lining construction device and method
CN113107489A (en) High-ground-pressure three-soft coal seam along-empty crossheading advanced grouting reinforcement method
CN103215922A (en) High-pressure high-flow centralized leakage grouting leaking stoppage method
CN208267862U (en) A kind of bracing means at tunnel road surface crack
CN201486566U (en) Device for pouring concrete continuous wall through gob-side entry retaining of mining working surface
CN107060876B (en) Steel pipe concrete pier column gob-side entry retaining active supporting structure and construction method thereof
CN102094421B (en) Prestressed anchor bar and construction method using same
CN104947723A (en) Presplitting grouting method for pile bottom of rock-socketed grouting pile
CN103498478A (en) Curtain grouting construction method for rock dam foundation
CN203584445U (en) Staged controllable anchor rod grouting support surrounding rock consolidation integrated system
CN202247938U (en) Wedge-shaped foundation bolt preformed hole core formwork device
CN207944465U (en) The support system ruggedized construction for deepening to backbreak for Soft Deep Foundation Pit
CN114814168A (en) Testing device for reinforcing fractured rock test piece through microbial grouting
CN201687512U (en) Forced air grouting device
CN102242639A (en) Compressed air grouting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100915

Termination date: 20121229