CN201579718U - Tool for positioning and mounting inner and outer cones of through-flow turbine - Google Patents

Tool for positioning and mounting inner and outer cones of through-flow turbine Download PDF

Info

Publication number
CN201579718U
CN201579718U CN2009202502740U CN200920250274U CN201579718U CN 201579718 U CN201579718 U CN 201579718U CN 2009202502740 U CN2009202502740 U CN 2009202502740U CN 200920250274 U CN200920250274 U CN 200920250274U CN 201579718 U CN201579718 U CN 201579718U
Authority
CN
China
Prior art keywords
outer cone
positioning
plate
tool
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202502740U
Other languages
Chinese (zh)
Inventor
陈红
周学均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Tianfa Heavy Hydropower Equipment Manufacturing Co Ltd
Original Assignee
Tianjin Tianfa Heavy Hydropower Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Tianfa Heavy Hydropower Equipment Manufacturing Co Ltd filed Critical Tianjin Tianfa Heavy Hydropower Equipment Manufacturing Co Ltd
Priority to CN2009202502740U priority Critical patent/CN201579718U/en
Application granted granted Critical
Publication of CN201579718U publication Critical patent/CN201579718U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a tool for positioning and mounting inner and outer cones of a through-flow turbine. The tool is characterized in that a bracket formed by longitudinal beams and crossbeams is included, wherein the longitudinal beams and the crossbeams adopt steel plate-welding structures; and an outer cone positioning and connecting plate is fixedly mounted at one end of the bracket, an inner cone positioning and connecting plate is fixedly mounted at the other end, and thread holes for positioning and mounting are formed at the lower parts of the outer cone positioning and connecting plate and the inner cone positioning and connecting plate. The utility model has advantages of reducing the whole weight by 50%, lowering the manufacturing cost, improving the inner and outer cone positioning precision of the through-flow turbine and meeting the requirements on the design dimensions of the channel.

Description

Outer cone location and installation instrument in the tubular turbine
Technical field
The utility model belongs to hydraulic turbine manufacturing technology field, particularly relates to outer cone location and installation instrument in a kind of tubular turbine.
Background technology
Outer cone and inner cone are one of very important parts of tubular turbine, it must can be finished by the location and installation instrument in installation process at the scene, and all there is confidential relation the installation site of outer cone and inner cone with runner, so the position dimension required precision of outer cone and inner cone is very high in installation process.At present, outer cone location and installation instrument is the intermediate support that is welded by a steel plate and three vertical gussets in the tubular turbine relatively commonly used, the connecting plate that is packed in the intermediate support two ends respectively constitutes.The location and installation instrument of said structure is not only heavy, a large amount of steel of consumption, the cost height, and also the location and installation precision is difficult to reach designing requirement.Because this instrument overall weight is overweight, in the power station during on-the-spot the installation, very inconvenience, and then influenced the installation progress in whole power station.
Summary of the invention
The utility model for solve the technical problem that exists in the known technology provide a kind of structure light, save material, reduce outer cone location and installation instrument in the high tubular turbine of manufacturing cost and location and installation precision.
The technical scheme that the utility model is taked for the technical problem that exists in the solution known technology is:
Outer cone location and installation instrument in the tubular turbine, it is characterized in that: comprise the support that is made of longitudinal and cross beam, described longitudinal and cross beam is welded-steel plate construction; Be fixed with the outer cone plate that is located by connecting at support one end, the other end is fixed with the inner cone plate that is located by connecting, and described outer cone plate and the inner cone plate bottom that is located by connecting that is located by connecting all is shaped on the location and installation screwed hole.
The utility model can also adopt following technical scheme:
Described outer cone plate and the inner cone plate that is located by connecting that is located by connecting all is welded to connect with support.
Advantage and the good effect that the utlity model has are: because that the utility model adopts technique scheme, the integral body that can make tool to alleviate is nearly 50%, reduce manufacturing cost; Also can improve the interior outer cone positioning accuracy of the hydraulic turbine simultaneously, and guarantee the design size requirement of runner.In addition, the utility model also have simple in structure, be easy to make, advantage easy to install.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the C-C cutaway view of Fig. 1;
Fig. 3 is the utility model user mode schematic diagram.
Among the figure: 1, longeron; 2, crossbeam; 3, the outer cone plate that is located by connecting; 4, the inner cone plate that is located by connecting; 5, flange piece; 6, erecting tools; 7, hydraulic turbine outer cone; 8, bolt; 9, nut; 10, hydraulic turbine inner cone.
The specific embodiment
For further understanding summary of the invention of the present utility model, characteristics and effect, exemplify following examples now, and conjunction with figs. is described in detail as follows:
See also Fig. 1-Fig. 3, outer cone location and installation instrument in the tubular turbine comprises the support that is made of longeron 1 and crossbeam 2, and described longitudinal and cross beam all adopts the steel plate welding to make, and so not only can alleviate the weight of instrument itself, and be easy to process, cost is low.Be welded with the outer cone plate 3 that is located by connecting at the support right-hand member, the support left end is welded with the inner cone plate 4 that is located by connecting, and described outer cone plate 3 and inner cone plate 4 bottoms that are located by connecting that are located by connecting all are shaped on the location and installation screwed hole.When installing at the scene, the outer cone of this location and installation instrument 6 plate 3 that is located by connecting is fastening with the screwed hole of hydraulic turbine outer cone 7 by bolt 8, nut 9, be located by connecting flange piece 5 screwed holes and hydraulic turbine inner cone 10 that plate 4 reserves on the fixed guide vane up and down by bolt and the hydraulic turbine of inner cone is fastening, can improve the interior outer cone positioning accuracy of the hydraulic turbine like this, and guarantee the design size requirement of runner.After interior outer cone is in place, again this instrument is removed.

Claims (2)

1. outer cone location and installation instrument in the tubular turbine, it is characterized in that: comprise the support that is made of longitudinal and cross beam, described longitudinal and cross beam is welded-steel plate construction; Be fixed with the outer cone plate that is located by connecting at support one end, the other end is fixed with the inner cone plate that is located by connecting, and described outer cone plate and the inner cone plate bottom that is located by connecting that is located by connecting all is shaped on the location and installation screwed hole.
2. outer cone location and installation instrument in the tubular turbine according to claim 1 is characterized in that: described outer cone plate and the inner cone plate that is located by connecting that is located by connecting all is welded to connect with support.
CN2009202502740U 2009-11-13 2009-11-13 Tool for positioning and mounting inner and outer cones of through-flow turbine Expired - Fee Related CN201579718U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202502740U CN201579718U (en) 2009-11-13 2009-11-13 Tool for positioning and mounting inner and outer cones of through-flow turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202502740U CN201579718U (en) 2009-11-13 2009-11-13 Tool for positioning and mounting inner and outer cones of through-flow turbine

Publications (1)

Publication Number Publication Date
CN201579718U true CN201579718U (en) 2010-09-15

Family

ID=42721711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202502740U Expired - Fee Related CN201579718U (en) 2009-11-13 2009-11-13 Tool for positioning and mounting inner and outer cones of through-flow turbine

Country Status (1)

Country Link
CN (1) CN201579718U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102794723A (en) * 2011-05-25 2012-11-28 迪皮埃复材构件(太仓)有限公司 Main beam positioning tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102794723A (en) * 2011-05-25 2012-11-28 迪皮埃复材构件(太仓)有限公司 Main beam positioning tool

Similar Documents

Publication Publication Date Title
CN201723388U (en) Foundation ring fixing support for connecting foundation and tower of wind-driven generator
CN201579718U (en) Tool for positioning and mounting inner and outer cones of through-flow turbine
CN201567684U (en) Transition lug for connecting box-type steel reinforced concrete column
CN201086346Y (en) Hydraulic internal mold for box girder prefabrication
CN201486156U (en) Accurate adjustment device for adjusting gap between large-sized steel members
CN201604013U (en) Drilling tooling for wind deflector fixing ring of wind driven generator
CN102380643A (en) Novel guide cover fixed collar drilling tooling of wind driven generator
CN201712670U (en) Heavy-duty forklift chassis and left and right oil tanks
CN202028915U (en) Positioning device for assembling rod body of steel pipe rod and connecting flange
CN202955437U (en) Adjustable combined support with high structural strength
CN202467170U (en) Aluminum alloy rising template system
CN201405926Y (en) Tie rod of hollow steel tube
CN202732238U (en) Supporting base seat of wind generating set
CN201058415Y (en) Tool for locating inside and outside wimble of through-flow turbine
CN202793790U (en) Base of gear box test bed of wind generating set
CN201439640U (en) Multifunction base for steel pipe scaffold
CN203092011U (en) Special assembly jig for spud leg structure of 300-foot self-elevating drilling platform
CN202411714U (en) Adhesion type car door mounting tool
CN201598576U (en) Internal/external stiffening cylinder mechanism for cross rod of traffic sign
CN201626803U (en) Supporting tool for process trolley
CN201512354U (en) Connecting structure of floor beam and support leg of crane
CN206242852U (en) The fixed structure of mount point under a kind of condenser
CN219134305U (en) Integrated form frame assembly
CN103601081A (en) Tower crane internal-climbing support system
CN202444189U (en) Movable operation platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100915

Termination date: 20121113