CN201574054U - Device for steering suspension arm of crane on route drilling machine - Google Patents

Device for steering suspension arm of crane on route drilling machine Download PDF

Info

Publication number
CN201574054U
CN201574054U CN2009203188892U CN200920318889U CN201574054U CN 201574054 U CN201574054 U CN 201574054U CN 2009203188892 U CN2009203188892 U CN 2009203188892U CN 200920318889 U CN200920318889 U CN 200920318889U CN 201574054 U CN201574054 U CN 201574054U
Authority
CN
China
Prior art keywords
pulley
arm
suspension arm
center shaft
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203188892U
Other languages
Chinese (zh)
Inventor
赵宏强
何清华
高淑蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Sunward Intelligent Machinery Co Ltd
Original Assignee
Hunan Sunward Intelligent Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Sunward Intelligent Machinery Co Ltd filed Critical Hunan Sunward Intelligent Machinery Co Ltd
Priority to CN2009203188892U priority Critical patent/CN201574054U/en
Application granted granted Critical
Publication of CN201574054U publication Critical patent/CN201574054U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)
  • Earth Drilling (AREA)

Abstract

The utility model discloses a device for steering a suspension arm of a crane on a route drilling machine The device is characterized in that two central shafts (2) are axially and vertically fixed on a suspension arm seat (1); a through hole (14) is formed in the axial center of each central shaft (2); a suspension arm (6) is rotationally arranged on each central shaft (2) through a sliding bearing (3) and a pressure plate (5); a first pulley (7) is arranged at the end of the suspension arm (6), which keeps away from the central shafts (2); a second pulley (11) is arranged in the position close to the centeral shafts (2) on the suspension arm (6) ; a third pulley (12) and a fourth pulley (13) are arranged on the suspension arm seat (1); a steel wire rope (9) passes through the fourth pulley (13), the third pulley (12), the through hole (14), the second pulley (11) and the first pulley (7); and a bolt (8) used for warding off the rope is arranged besides each guide pulley. The device has the advantages that the steel wire rope has low possibility of winding and bouncing out; the suspension arm is capable of rotating; the operation range is wide; and the hoisting operation is convenient.

Description

The arm steering hardware of hoisting crane on the sailing course drill
Technical field
The utility model relates to a kind of arm steering hardware of hoisting crane, particularly relates to the arm steering hardware of hoisting crane on a kind of sailing course drill.
Background technology
Sailing course drill is widely used in the blast hole Drilling of underwater engineering reefs such as rivers navigation channel, coastal waterway and port and pier construction.In the work progress of sailing course drill boring, in order to reach the requirement of drilling depth, usually need to carry out work such as repetition connecting and disconnecting drill rod and sleeve pipe, because of drilling rod with sleeve pipe is all long and heavy, so generally all dispose lifting and other the auxiliary hoisting operation that two hoisting cranes carry out drilling rod and sleeve pipe on the sailing course drill.The arm of two hoisting cranes is installed on the drilling cramp top, and aspect ratio is higher, requires steel rope to be difficult for twining and jumping out, and arm can rotate, and enlarges scope of work, and lifting is convenient.
The utility model content
Technical problem to be solved in the utility model provides a kind of steel rope and be difficult for to twine and jump out, and arm can rotate, and scope of work is big, lifts the arm steering hardware of hoisting crane on the sailing course drill easily.
In order to solve the problems of the technologies described above, the arm steering hardware of hoisting crane on the sailing course drill that the utility model provides, axial vertical fixing is provided with two center shafts on the arm seat, the axial centre of each described center shaft has a through hole, on each described center shaft, be rotatablely equipped with an arm by plain bearing and pressing plate, the other end away from described center shaft on the described arm is provided with first pulley, close on described center shaft on the described arm and be provided with second pulley, close on each described center shaft on the described arm seat and be provided with the 3rd pulley, the edge that closes on drilling cramp on the described arm seat is provided with the 4th pulley that cooperates with described the 3rd pulley, steel rope is through described the 4th pulley, the 3rd pulley, through hole, on second pulley and first pulley, retaining rope bolt all is equipped with on each leading sheave next door.
Each described arm is provided with the alemite that is communicated with described plain bearing.
The arm steering hardware of hoisting crane on the sailing course drill of employing technique scheme, the arm seat is installed on the top of sailing course drill drilling cramp by bolt, the center shaft that arm rotates is weldingly fixed on the arm seat, in the middle of the center shaft through hole is arranged, and is convenient to steel rope and passes through in center shaft.Between center shaft and the arm plain bearing is installed, and alemite is installed, by injecting lubricating oil, arm can rotate like a cork around center shaft.Pressing plate is by being bolted on the center shaft, can prevent that arm from deviating from center shaft.The arm steering hardware is equipped with eight leading sheaves altogether, and retaining rope bolt all is equipped with on each leading sheave next door, can prevent that steel rope from jumping out pulley, makes steel rope be difficult for twining or blocking.
The utlity model has following tangible advantage: a through hole is arranged in the middle of (1), the design center axle, be convenient to steel rope and pass through, arm can easily turn to, slewing area is wide during operation.(2), the arm steering hardware is equipped with a plurality of leading sheaves, retaining rope bolt all is equipped with on each leading sheave next door, can prevent that steel rope from jumping out pulley, makes steel rope be difficult for twining or blocking.
In sum, the utility model is that a kind of steel rope be difficult for to twine and jumps out, and arm can rotate, and scope of work is big, lifts the arm steering hardware of hoisting crane on the sailing course drill easily.
Description of drawings
Fig. 1 is the arm scheme of installation;
Fig. 2 is that A of the present utility model is to view.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Referring to Fig. 1 and Fig. 2, axial vertical fixing is provided with two center shafts 2 on the arm seat 1, the axial centre of each center shaft 2 has a through hole 14, on each center shaft 2, be rotatablely equipped with an arm 6 by plain bearing 3 and pressing plate 5, the other end away from center shaft 2 on the arm 6 is provided with first pulley 7, close on center shaft 2 on the arm 6 and be provided with second pulley 11, close on each center shaft 2 on the arm seat 1 and be provided with the 3rd pulley 12, the edge that closes on drilling cramp on the arm seat 1 is provided with the 4th pulley 13 that cooperates with the 3rd pulley 12, steel rope 9 is through the 4th pulley 13, the 3rd pulley 12, through hole 14, on second pulley 11 and first pulley 7, steel rope 9 one ends are connected with winding plant, the other end is connected with suspension hook 10, retaining rope bolt 8 all is equipped with on each leading sheave next door, and each arm 6 is provided with the alemite 4 that is communicated with plain bearing 3.
Arm seat 1 of the present utility model is installed in by bolt on the top of sailing course drill drilling cramp, and the center shaft 2 that arm 6 rotates is weldingly fixed on the arm seat 1, in the middle of the center shaft through hole 14 is arranged, and is convenient to steel rope 9 and passes through in center shaft 14.Between center shaft 2 and the arm 6 plain bearing 3 is installed, and alemite 4 is installed, by injecting lubricating oil, arm 6 can rotate like a cork around center shaft 2.Pressing plate 5 is by being bolted on the center shaft 2, can prevent that arm 6 from deviating from center shaft 2.The arm steering hardware is equipped with eight leading sheaves altogether, and retaining rope bolt 8 all is equipped with on each leading sheave next door, can prevent that steel rope 9 from jumping out pulley, makes steel rope 9 be difficult for twining or blocking.
The utlity model has following obvious advantage:
(1), a through hole 14 is arranged in the middle of the axle of design centre, be convenient to steel wire rope 9 and pass through, arm 6 can easily turn to, slewing area is wide during operation.
(2), device for steering suspension arm is equipped with eight leading blocks altogether, gear rope bolt 8 is equipped with on each leading block next door, can prevent that steel wire rope 9 from jumping out pulley, makes steel wire rope 9 be difficult for twining or blocking.

Claims (2)

1. the arm steering hardware of hoisting crane on the sailing course drill, it is characterized in that: arm seat (1) is gone up axial vertical fixing and is provided with two center shafts (2), the axial centre of each described center shaft (2) has a through hole (14), upward be rotatablely equipped with an arm (6) at each described center shaft (2) by plain bearing (3) and pressing plate (5), the other end that described arm (6) is gone up away from described center shaft (2) is provided with first pulley (7), close on described center shaft (2) on the described arm (6) and be provided with second pulley (11), close on each described center shaft (2) on the described arm seat (1) and be provided with the 3rd pulley (12), the edge that closes on drilling cramp on the described arm seat (1) is provided with the 4th pulley (13) that cooperates with described the 3rd pulley (12), steel rope (9) is through described the 4th pulley (13), the 3rd pulley (12), through hole (14), on second pulley (11) and first pulley (7), retaining rope bolt (8) all is equipped with on each leading sheave next door.
2. the arm steering hardware of hoisting crane on the sailing course drill according to claim 1 is characterized in that: each described arm (6) is provided with the alemite (4) that is communicated with described plain bearing (3).
CN2009203188892U 2009-12-29 2009-12-29 Device for steering suspension arm of crane on route drilling machine Expired - Fee Related CN201574054U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203188892U CN201574054U (en) 2009-12-29 2009-12-29 Device for steering suspension arm of crane on route drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203188892U CN201574054U (en) 2009-12-29 2009-12-29 Device for steering suspension arm of crane on route drilling machine

Publications (1)

Publication Number Publication Date
CN201574054U true CN201574054U (en) 2010-09-08

Family

ID=42693930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203188892U Expired - Fee Related CN201574054U (en) 2009-12-29 2009-12-29 Device for steering suspension arm of crane on route drilling machine

Country Status (1)

Country Link
CN (1) CN201574054U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012167504A1 (en) * 2011-06-10 2012-12-13 长沙中联重工科技发展股份有限公司 Rope-restraining device and engineering machinery having same
CN103663198A (en) * 2013-11-25 2014-03-26 无锡起岸重工机械有限公司 Suspension arm supporting structure for marine crane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012167504A1 (en) * 2011-06-10 2012-12-13 长沙中联重工科技发展股份有限公司 Rope-restraining device and engineering machinery having same
CN103663198A (en) * 2013-11-25 2014-03-26 无锡起岸重工机械有限公司 Suspension arm supporting structure for marine crane

Similar Documents

Publication Publication Date Title
CN201934087U (en) Driving control device for rotary drilling rig and rotary drilling rig
US7641421B2 (en) Offshore vessel
CN101343021B (en) Large-scale full-turning offshore platform crane
CN2926478Y (en) Rotary-dug driller
CN100506634C (en) Towing pin
CN101781970A (en) Steel wire rope guide device used for rotary drilling rig and rotary drilling rig
CN201165452Y (en) Novel overhead traveling crane anti-groove jumping rope stopping device
CN201999626U (en) Hoisting device for overturning super-large type rotating-disk bearing
CN201574054U (en) Device for steering suspension arm of crane on route drilling machine
CN203333189U (en) Hoisting device for ships
CN202296952U (en) Steel wire rope guide device of winding engine
CN202415025U (en) Oscillating pulley system
CN202321978U (en) Combined lifting appliance for metallurgical environment
CN201261694Y (en) Large-scale full-turning offshore platform crane
CN203715118U (en) Wheel crane and steel wire rope guide mechanism thereof
CN202169995U (en) Hydraulic dredger with positioning piles
CN103130121A (en) Hydraulic rope guiding system applicable to drill well winch and hydraulic rope guiding method applicable to drill well winch
CN202390116U (en) High-intensity small-tonnage hoist
CN202401981U (en) Drilling machine
CN202322116U (en) Inverted triangular arm and moving balancing weight hoisting machinery
CN202866653U (en) Drilling machine double-main-rod guide rail type hydraulic lifting mechanism
CN201587827U (en) Main and auxiliary hoisting height position-limiting control device of straight boom portal crane
CN204588545U (en) Fixed type hawser mast crane
CN103174381A (en) Rotary excavating drilling machine
CN202296698U (en) Rotatable flat-tail rope suspending device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100908

Termination date: 20141229

EXPY Termination of patent right or utility model