CN201568643U - Cable bridge frame with openings on side wall - Google Patents

Cable bridge frame with openings on side wall Download PDF

Info

Publication number
CN201568643U
CN201568643U CN2009201799726U CN200920179972U CN201568643U CN 201568643 U CN201568643 U CN 201568643U CN 2009201799726 U CN2009201799726 U CN 2009201799726U CN 200920179972 U CN200920179972 U CN 200920179972U CN 201568643 U CN201568643 U CN 201568643U
Authority
CN
China
Prior art keywords
perforate
testing bridge
cable testing
cable
wall hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201799726U
Other languages
Chinese (zh)
Inventor
刘良军
关金锁
宋明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DC CONSTRUCTION BRANCH STATE GRID CORP OF CHINA
Original Assignee
DC CONSTRUCTION BRANCH STATE GRID CORP OF CHINA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DC CONSTRUCTION BRANCH STATE GRID CORP OF CHINA filed Critical DC CONSTRUCTION BRANCH STATE GRID CORP OF CHINA
Priority to CN2009201799726U priority Critical patent/CN201568643U/en
Application granted granted Critical
Publication of CN201568643U publication Critical patent/CN201568643U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a cable bridge frame with openings on side wall, comprising a side wall beam. The cable bridge frame is characterized in that a supporting cross beam is arranged between the two groups of side wall beams; and openings that are used for leading out the cables are distributed on the side wall beams of the cable bridge frame. The cable bridge frame with the openings on the side wall has reasonable structure design, can conveniently lead out the cables from the lateral direction, effectively lightens the weight, reduces the using amount of the material, is more beneficial to the paving of the cables, and is especially beneficial to the arrangement of the cables between various control equipments that have multiple cables, are arranged under a movable floor and adopt the ladder-type cable bridge frame.

Description

The side-wall hole cable testing bridge
Technical field
The utility model belongs to the erection unit that is used for cable laying, and it is more and be applicable to side-wall hole cable testing bridge under the movable floor to be specifically related to a kind of cable that is used for.
Background technique
Cable testing bridge is to be used for the regular critical facility that sets up of cable, in the prior art, cable testing bridge is the pallet for having bathtub construction on one side, its two ends can be realized the connection of length direction by connecting sheet, in order to guarantee preferable bearing capacity, this cable testing bridge adopts rigidity sheet materials such as cold drawn steel plate of carbon element or aluminium alloy plate to make, and its deadweight is bigger, and cost is higher.
The sidewall beam of existing cable testing bridge adopts pressed sheet in addition, and cable need be drawn from the top or the bottom of cable testing bridge when drawing, and makes that drawing of cable is comparatively in disorder.
The model utility content
The utility model provides a kind of reasonable in design, the side-wall hole cable testing bridge that can easily cable be drawn from this cable testing bridge side direction, it has not only effectively alleviated the weight of cable testing bridge, reduce the material use amount, be more conducive to laying of elastic cable paper, particularly be that to set up cable more, and be positioned at the erecting cable between the various control apparatuss that adopt the ladder-type cable testing bridge under the movable floor.
The technological scheme that the utility model adopted is as follows:
A kind of side-wall hole cable testing bridge comprises the sidewall beam, it is characterized in that being provided with supporting traverse between two groups of sidewall beams, and distributing on the sidewall beam of this cable testing bridge is provided for the perforate of outgoing cable.
Concretely, described sidewall beam is a strip boards, and the two end part of its length direction are provided with joint, the through hole of this joint for wearing for bolt.
Described perforate is a chamfering rectangular opening, perhaps a plurality of rectangular openings of perforate for distributing and being provided with, the perhaps circular hole of perforate for distributing and being provided with.
Described supporting traverse is along the setting spaced apart of the length direction of two groups of sidewall beams, and described supporting traverse connects the underpart that two groups of sidewall beams are set.
Described sidewall beam and described supporting traverse spiral-lock are provided with, and described sidewall beam and described supporting traverse are welded to connect.
Described cable testing bridge further includes perforate edge sealing circle, and this perforate edge sealing circle spiral-lock is arranged on the edge of described perforate.
Described cable testing bridge further comprises shrouding, and this shrouding has a protuberance, and the protuberance spiral-lock of this shrouding is arranged on this perforate setting of sealing in the described perforate.
This side-wall hole cable testing bridge adopts the sidewall beam to be provided with the structure of perforate, makes the cable that lays in cable testing bridge to draw from this perforate easily, improves the regularity of erecting cable, and is beneficial to the setting of drawing of cable.This perforate can be adopted multiple structure; both can draw distribution circular hole single or minority root cable for each perforate; also can adopt a rectangular opening with chamfering structure; satisfy the needs that many cables are together drawn; in order to protect cable; more can be in the perforate that needs outgoing cable, the perforate edge sealing circle that the flexible plastic material of employing is made carries out edge sealing to the edge of this perforate.For the not perforate of outgoing cable, more can seal setting by the form of spiral-lock plastic cement shrouding.
By on the sidewall beam, perforate being set, can under the prerequisite that guarantees sidewall load bearing beam performance, effectively reduce the weight of sidewall beam, the use of saving steel or alloy material reduces fabricating cost, improves the construction convenience.This cable testing bridge more can effectively reduce the consumption of materials of bottom support crossbeam by the mode of supporting traverse is set at interval, further reduces the weight of this cable testing bridge.
The beneficial effects of the utility model are, this side-wall hole cable testing bridge reasonable in design, can easily cable be drawn from this cable testing bridge side direction, it has not only effectively alleviated the weight of cable testing bridge, reduce the material use amount, being more conducive to laying of elastic cable paper, particularly is that deposited cable is more, and is positioned at the erecting cable between the various control apparatuss that adopt the ladder-type cable testing bridge under the movable floor.
Below in conjunction with the drawings and specific embodiments the utility model is further elaborated.
Description of drawings
Fig. 1 is the structural representation of the utility model one embodiment;
Fig. 2 is the structural representation of another embodiment of the utility model;
Fig. 3 is the utility model structural representation of an embodiment again.
Embodiment
This side-wall hole cable testing bridge is mainly formed by connecting the supporting traverse that is provided with between two groups of sidewall beams and the two groups of sidewall beams, and Fig. 1, Fig. 2 and Fig. 3 show the structural representation of side-wall hole cable testing bridge respectively.Sidewall beam 11 and 12 is a strip boards, and the two end part of its length direction are provided with joint 16, has the through hole 15 that wears for bolt on this joint.The joint of two groups of cable testing bridges can achieve a fixed connection by link and bolt.Distribute on the sidewall beam of this cable testing bridge and be provided for the perforate 13 of outgoing cable.As shown in Figure 1, in this embodiment, this perforate 13 is the single rectangle opening with chamfering structure; Can draw together for many cables.As shown in Figure 2, in this embodiment, this perforate 13 is a plurality of rectangle openings of regular distribution.As shown in Figure 3, this perforate 13 is a plurality of circular holes that regular distribution is provided with.
In the respective embodiments described above, supporting traverse 14 can be along the setting spaced apart of the length direction of two groups of sidewall beams, and supporting traverse connects the underpart that two groups of sidewall beams are set.In concrete the application, sidewall beam and supporting traverse adopt welding manner can realize three's firm assembling.
In actual applications; more perforate edge sealing circle can be installed in the perforate 13 that needs outgoing cable; this perforate edge sealing circle spiral-lock is arranged on the edge of perforate; play the effect of effective protection cable; for the perforate that does not need outgoing cable; can be temporarily in perforate spiral-lock the shrouding of plastic material is set, with this perforate sealing.
The sidewall beam of this side-wall hole cable testing bridge and supporting traverse can be by the cold drawn steel plate of carbon element, aluminium alloy plate or other made.Practical, simple in structure, beautiful shape, in light weight, characteristics that cost is low, particularly give technological improvement, expand cable, maintenance, maintenance cable bring convenience, and is specially adapted to that cable is more, between the various control apparatuss that adopt the ladder-type cable testing bridge under movable floor/erecting cable of chamber.

Claims (7)

1. a side-wall hole cable testing bridge comprises the sidewall beam, it is characterized in that being provided with supporting traverse between two groups of sidewall beams, and distributing on the sidewall beam of this cable testing bridge is provided for the perforate of outgoing cable.
2. side-wall hole cable testing bridge according to claim 1 is characterized in that described sidewall beam is a strip boards, and the two end part of its length direction are provided with joint, the through hole of this joint for wearing for bolt.
3. side-wall hole cable testing bridge according to claim 1 is characterized in that described perforate is a chamfering rectangular opening, perhaps a plurality of rectangular openings of perforate for distributing and being provided with, the perhaps circular hole of perforate for distributing and being provided with.
4. side-wall hole cable testing bridge according to claim 1 is characterized in that described supporting traverse along the setting spaced apart of the length direction of two groups of sidewall beams, and described supporting traverse connects the underpart that two groups of sidewall beams are set.
5. side-wall hole cable testing bridge according to claim 1 is characterized in that described sidewall beam and described supporting traverse are welded to connect.
6. side-wall hole cable testing bridge according to claim 1 is characterized in that described cable testing bridge further includes perforate edge sealing circle, and this perforate edge sealing circle spiral-lock is arranged on the edge of described perforate.
7. side-wall hole cable testing bridge according to claim 1 is characterized in that described cable testing bridge further comprises shrouding, and this shrouding has a protuberance, and the protuberance spiral-lock of this shrouding is arranged on this perforate setting of sealing in the described perforate.
CN2009201799726U 2009-12-09 2009-12-09 Cable bridge frame with openings on side wall Expired - Fee Related CN201568643U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201799726U CN201568643U (en) 2009-12-09 2009-12-09 Cable bridge frame with openings on side wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201799726U CN201568643U (en) 2009-12-09 2009-12-09 Cable bridge frame with openings on side wall

Publications (1)

Publication Number Publication Date
CN201568643U true CN201568643U (en) 2010-09-01

Family

ID=42660930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201799726U Expired - Fee Related CN201568643U (en) 2009-12-09 2009-12-09 Cable bridge frame with openings on side wall

Country Status (1)

Country Link
CN (1) CN201568643U (en)

Similar Documents

Publication Publication Date Title
CN201494995U (en) Elevator shaft door protection device
CN108330805B (en) Structure for improving performance of composite beam
CN203787887U (en) Cable tray
CN102140774A (en) Lateral stiffening construction of concrete cable-stayed bridge box girder
CN201568643U (en) Cable bridge frame with openings on side wall
CN201496664U (en) Light high-strength trough type cable bridge trestle
CN201834967U (en) Graphite frame for silicon solar battery plates
CN203223637U (en) Novel cable bridge
CN203347100U (en) Composite wallboard, hanging connection unit between composite wallboard and cross beam and connecting structure between composite wallboard and cross beam
CN204847031U (en) Former material of assembled reinforcing bar divides storehouse support
CN205275070U (en) Wedge type adheres to frame bracing structure
CN201742062U (en) Cable channel dustproof plate
CN203160612U (en) CZ-shaped T-bar outer wall plate installing structure
CN201413959Y (en) Cable bridge
CN209924421U (en) Formula cantilever template moves backward
CN211850269U (en) High-strength floor support plate with reinforced stiffening ribs
CN209523352U (en) Exterior wall prefabricated components with ribbing
CN203487703U (en) Light rectangular steel tube-concrete combination compression flange and corrugated web combination box girder
CN203487691U (en) H-shaped corrugated web steel convenient for top installation and fixation
CN215211885U (en) Novel material-saving and environment-friendly I-beam
CN203160619U (en) TL-shaped keel type wall space system for outer wall
CN203160462U (en) Top and bottom installation structure of composite partition wall
CN209994703U (en) Hardening of SMC railway outdoor box equipment foundation
CN214061970U (en) H shaped steel roof beam and H shaped steel roof beam unilateral rigid coupling node structure
CN103266691A (en) Widened and heightened structure for compound partition wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100901

Termination date: 20111209