CN201562391U - Blowout preventer console of drilling simulator - Google Patents

Blowout preventer console of drilling simulator Download PDF

Info

Publication number
CN201562391U
CN201562391U CN2009202429529U CN200920242952U CN201562391U CN 201562391 U CN201562391 U CN 201562391U CN 2009202429529 U CN2009202429529 U CN 2009202429529U CN 200920242952 U CN200920242952 U CN 200920242952U CN 201562391 U CN201562391 U CN 201562391U
Authority
CN
China
Prior art keywords
pilot lamp
switch
opened
flashboard
annular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202429529U
Other languages
Chinese (zh)
Inventor
陈利学
梅大成
龚捷
胡卫东
郑巧
赵刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Esimtech Petroleum Equipment Simulation Technology Exploitation Co Ltd
Original Assignee
Chengdu Esimtech Petroleum Equipment Simulation Technology Exploitation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Esimtech Petroleum Equipment Simulation Technology Exploitation Co Ltd filed Critical Chengdu Esimtech Petroleum Equipment Simulation Technology Exploitation Co Ltd
Priority to CN2009202429529U priority Critical patent/CN201562391U/en
Priority to PCT/CN2010/074711 priority patent/WO2011054209A1/en
Application granted granted Critical
Publication of CN201562391U publication Critical patent/CN201562391U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/16Control means therefor being outside the borehole
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B23/00Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
    • G09B23/40Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for geology
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/02Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of industrial processes; of machinery
    • G09B25/025Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of industrial processes; of machinery hydraulic; pneumatic

Abstract

The utility model discloses a blowout preventer console of a drilling simulator, which comprises a chassis and an internal control panel. The front face of the chassis is provided with a control panel (1), and the control panel (1) is provided with a power accumulator pressure gauge (2), an annular blowout preventer oil-pressure gauge (3), a gas source pressure gauge (4), a manifold pressure gauge (5), an annular gate switch (6), a gas source switch (9), a bypass gate switch (13), an upper semi-sealed gate switch (10), a fully-sealed gate switch (14), a well control manifold gate switch (17), a blow valve switch (20), a lower semi-sealed gate switch (23) and an indicating lamp group. The utility model has the advantages of realizing the vivid simulation of the blowout preventer console applied on the drilling site, enhancing the onsite feeling in teaching and training, shortening the training period, improving the training effect and reducing the training cost.

Description

Drilling simulator preventer control desk
Technical field
The utility model relates to a kind of drilling simulation device, particularly relates to a kind of drilling simulator preventer control desk.
Background technology
Petroleum industry is a kind of technology-intensive industry, and drilling operation is that petroleum industry is taken reserves, gone up one of important means of production capacity.Because the restriction of petroleum drilling working condition and the complicacy of down-hole situation make petroleum drilling operation face great risk.In order to obtain better production efficiency and economic benefit, reduce the generation of human accident, situ of drilling well operating personnel and engineering technical personnel's technical skill training is just seemed very important.
At present, the drill-well operation training is mainly carried out in the production scene, because the restriction of various conditions and factor makes training contents be subjected to great restriction, the systematicness of training, result of training and start-up's quantity etc. all are subjected to great influence.
The utility model content
The purpose of this utility model is to overcome the deficiency of existing petroleum drilling operation training technique, a kind of drilling simulator preventer control desk based on computer simulation technique is provided, this preventer control desk is with reference to the practical operation flow process at drilling operation scene, realistic simulation is carried out in operation to preventer, strengthen the presence of teaching, training, shortening training cycle, enhancement training effect, the training cost that reduces.
Goal of the invention of the present utility model is to be achieved through the following technical solutions: drilling simulator preventer control desk, it comprises cabinet and internal control plate, the front of described cabinet comprises a control panel, control panel is provided with the accumulator pressure table, the annular preventer oil pressure gauge, the bleed pressure table, the manifold pressure table, the annular damper switch, annular damper ON/OFF pilot lamp, gas source switch, bypass flashboard switch, first envelope flashboard switch, first envelope shutter opening/closing pilot lamp, the blind rams switch, blind rams ON/OFF pilot lamp, kill manifold flashboard switch, kill manifold ON/OFF pilot lamp, the open flow threshold switch, the open flow valve closes/opens pilot lamp, second envelope flashboard switch and second envelope shutter opening/closing pilot lamp, described internal control plate comprises a Programmable Logic Controller PLC, the CPU module of Programmable Logic Controller PLC is connected with the annular preventer oil pressure gauge with the accumulator pressure table by DA module 1 respectively, be connected with the manifold pressure table with the bleed pressure table by DA module 2, the CPU module of Programmable Logic Controller PLC is also respectively by its switching value input port and annular damper switch, gas source switch, bypass flashboard switch, first envelope flashboard switch, the blind rams switch, kill manifold flashboard switch, the open flow threshold switch is connected with second envelope flashboard switch, opens the pilot lamp annular damper by its switching value output port and annular damper and closes pilot lamp, first envelope flashboard is opened pilot lamp, first envelope flashboard closes pilot lamp, blind rams is opened the pilot lamp blind rams and is closed pilot lamp, kill manifold is opened pilot lamp, kill manifold closes pilot lamp, the open flow valve closes pilot lamp, the open flow valve is opened pilot lamp, second envelope flashboard is opened pilot lamp and is connected with second envelope flashboard pass pilot lamp.
Wherein, the accumulator pressure table is used to show the accumulator pressure value, the annular preventer oil pressure gauge is used to show the annular preventer oil pressure value, the bleed pressure table shows the bleed pressure value, the manifold pressure table shows the manifold tensimeter, the annular damper switch is used to open or close annular damper, and annular damper is opened/opened pilot lamp and is used to indicate the annular damper opening/closing.
Blowout prevention control program workflow roughly can be described as: when control program starts, the initialization port carries out initialization to the port Port1 of PLC, to realize and control platform point-to-point communication far away, pilot lamp and Displaying Meter all show initialization simultaneously, read in switching value then and be deposited into internal buffer, directly read for PC, call NET_RW and remote console transceive data again, call annular, half envelope, open flow, shear control subprogram, they are according to the preventer operating grip and control pilot lamp switching time, whether switch puts in place to show each preventer, deposit led status (being used to indicate the open/close state of preventer) in the transmission buffer zone then, read the alarm control criterion from send buffer again, if select to report to the police and then connect alarm, as selecting not report to the police then breakage alert, all return at last and read in switching value and deposit the transmission buffer zone in, circulate with this.
Annular preventer control subprogram workflow roughly can be stated as: subroutine brings into operation, read on off state and comprise the operating grip state of preventer and the operating grip state of control platform far away, as be connected with remote station, select on the preventer source of the gas to open and annular is opened or far control on the platform annular opens, judge whether that more regularly 8 second time arrived, if then annular preventer to open pilot lamp bright, annular preventer closes pilot lamp and goes out, subroutine is returned then, otherwise subroutine is returned; If source of the gas is opened and annular is closed or far controlled on the platform annular and closes then regularly arrived in 8 seconds on the selection preventer, annular preventer closes that pilot lamp is bright, and annular preventer leaves pilot lamp and goes out, and subroutine is returned then, otherwise subroutine is returned; If do not connect remote station, source of the gas is opened and annular is opened on the preventer, and then regularly 8 second time arrived, and it is bright that pilot lamp left by annular preventer, and annular preventer closes pilot lamp and goes out, and subroutine is returned then, if regularly 8 second time was not returned to being still subroutine; Source of the gas is opened and annular is closed on the preventer, if then regularly 8 second time arrive, annular preventer closes that pilot lamp is bright, annular preventer leaves pilot lamp and goes out, subroutine is returned then, otherwise subroutine is returned.
The beneficial effects of the utility model are: realized the realistic simulation to situ of drilling well preventer control desk, strengthened the presence of teaching, training, shortened the training cycle, improved result of training, reduced training cost.
Description of drawings
The structural representation of Fig. 1 preventer control panel
The annexation figure of critical piece on Fig. 2 internal control plate and the control panel
Fig. 3 preventer primary control program process flow diagram
Fig. 4 annular preventer control subprogram process flow diagram
Among the figure, 1-chain of command, 2-accumulator pressure table, 3-annular preventer oil pressure gauge, 4-bleed pressure table, 5-manifold pressure table, 6-annular damper switch, the 7-annular damper is opened pilot lamp, and the 8-annular damper closes pilot lamp, 9-gas source switch, first envelope flashboard switch of 10-, first envelope flashboard of 11-is opened pilot lamp, and first envelope flashboard of 12-closes pilot lamp 13-bypass flashboard switch, 14-blind rams switch, the 15-blind rams is opened pilot lamp, and the 16-blind rams closes pilot lamp, 17-kill manifold flashboard switch, the 18-kill manifold is opened pilot lamp, the 19-kill manifold closes pilot lamp, 20-open flow threshold switch, and 21-open flow valve closes pilot lamp, 22-open flow valve is opened pilot lamp, second envelope flashboard switch of 23-, second envelope flashboard of 24-is opened pilot lamp, and second envelope flashboard of 25-closes pilot lamp.
Embodiment
Further describe the technical solution of the utility model below in conjunction with accompanying drawing: as shown in Figure 1, drilling simulator preventer control desk, it is characterized in that it comprises cabinet and internal control plate, the front of described cabinet comprises a control panel 1, control panel 1 is provided with accumulator pressure table 2, annular preventer oil pressure gauge 3, bleed pressure table 4, manifold pressure table 5, annular damper switch 6, annular damper is opened pilot lamp 7, annular damper closes pilot lamp 8, gas source switch 9, bypass flashboard switch 13, first envelope flashboard switch 10, first envelope flashboard is opened pilot lamp 11, first envelope flashboard closes pilot lamp 12, blind rams switch 14, blind rams is opened pilot lamp 15, blind rams closes pilot lamp 16, kill manifold flashboard switch 17, kill manifold is opened pilot lamp 18, kill manifold closes pilot lamp 19, open flow threshold switch 20, the open flow valve closes pilot lamp 21, the open flow valve is opened pilot lamp 22, second envelope flashboard switch 23, pilot lamp 24 opened by second envelope flashboard and second envelope flashboard closes pilot lamp 25, described internal control plate comprises a Programmable Logic Controller PLC, as shown in Figure 2, the CPU module of Programmable Logic Controller PLC is connected with annular preventer oil pressure gauge 3 with accumulator pressure table 2 by DA module 1 respectively, be connected with manifold pressure table 5 with bleed pressure table 4 by DA module 2, the CPU module of Programmable Logic Controller PLC is also respectively by its switching value input port and annular damper switch 6, gas source switch 9, bypass flashboard switch 13, first envelope flashboard switch 10, blind rams switch 14, kill manifold flashboard switch 17, open flow threshold switch 20 is connected with second envelope flashboard switch 23, opens pilot lamp 7 by its switching value output port and annular damper, annular damper closes pilot lamp 8, first envelope flashboard is opened pilot lamp 11, first envelope flashboard closes pilot lamp 12, blind rams is opened pilot lamp 15 blind rams and is closed pilot lamp 16, kill manifold is opened pilot lamp 18, kill manifold closes pilot lamp 19, the open flow valve closes pilot lamp 21, the open flow valve is opened pilot lamp 22, second envelope flashboard is opened pilot lamp 24 and is connected with second envelope flashboard pass pilot lamp 25.
Fig. 3 is the preventer control flow chart, its workflow roughly can be described as: when control program starts, the initialization port carries out initialization to the port Port1 of PLC, to realize and control platform point-to-point communication far away, pilot lamp and Displaying Meter all show initialization simultaneously, read in switching value then and be deposited into internal buffer, directly read for PC, call NET_RW and remote console transceive data again, call annular, half envelope, open flow, shear control subprogram, they are according to the preventer operating grip and control pilot lamp switching time, whether switch puts in place to show each preventer, deposit led status (being used to indicate the open/close state of preventer) in the transmission buffer zone then, read the alarm control criterion from send buffer again, then connect alarm, as selecting not report to the police then breakage alert if select to report to the police, all return at last and read in switching value and deposit the transmission buffer zone in, circulate with this.
Fig. 4 is an annular preventer control subprogram process flow diagram, its workflow roughly can be stated as: subroutine brings into operation, read on off state and comprise the operating grip state of preventer and the operating grip state of control platform far away, as be connected with remote station, and select on the preventer source of the gas to open and annular is opened or far control on the platform annular opens, judge whether that more regularly 8 second time arrived, if then to open pilot lamp bright for annular preventer, annular preventer closes pilot lamp and goes out, and subroutine is returned then, otherwise subroutine is returned; If source of the gas is opened and annular is closed or far controlled on the platform annular and closes then regularly arrived in 8 seconds on the selection preventer, annular preventer closes that pilot lamp is bright, and annular preventer leaves pilot lamp and goes out, and subroutine is returned then, otherwise subroutine is returned; If do not connect remote station, source of the gas is opened and annular is opened on the preventer, and then regularly 8 second time arrived, and it is bright that pilot lamp left by annular preventer, and annular preventer closes pilot lamp and goes out, and subroutine is returned then, if regularly 8 second time was not returned to being still subroutine; Source of the gas is opened and annular is closed on the preventer, if then regularly 8 second time arrive, annular preventer closes that pilot lamp is bright, annular preventer leaves pilot lamp and goes out, subroutine is returned then, otherwise subroutine is returned.

Claims (1)

1. drilling simulator preventer control desk, it is characterized in that it comprises cabinet and internal control plate, the front of described cabinet comprises a control panel (1), control panel (1) is provided with accumulator pressure table (2), annular preventer oil pressure gauge (3), bleed pressure table (4), manifold pressure table (5), annular damper switch (6), annular damper is opened pilot lamp (7), annular damper closes pilot lamp (8), gas source switch (9), bypass flashboard switch (13), first envelope flashboard switch (10), first envelope flashboard is opened pilot lamp (11), first envelope flashboard closes pilot lamp (12), blind rams switch (14), blind rams is opened pilot lamp (15), blind rams closes pilot lamp (16), kill manifold flashboard switch (17), kill manifold is opened pilot lamp (18), kill manifold closes pilot lamp (19), open flow threshold switch (20), the open flow valve closes pilot lamp (21), the open flow valve is opened pilot lamp (22), second envelope flashboard switch (23), pilot lamp (24) opened by second envelope flashboard and second envelope flashboard closes pilot lamp (25), described internal control plate comprises a Programmable Logic Controller PLC, the CPU module of Programmable Logic Controller PLC is connected with annular preventer oil pressure gauge (3) with accumulator pressure table (2) by DA module 1 respectively, be connected with manifold pressure table (5) with bleed pressure table (4) by DA module 2, the CPU module of Programmable Logic Controller PLC is also respectively by its switching value input port and annular damper switch (6), gas source switch (9), bypass flashboard switch (13), first envelope flashboard switch (10), blind rams switch (14), kill manifold flashboard switch (17), open flow threshold switch (20) is connected with second envelope flashboard switch (23), opens pilot lamp (7) by its switching value output port and annular damper, annular damper closes pilot lamp (8), first envelope flashboard is opened pilot lamp (11), first envelope flashboard closes pilot lamp (12), blind rams is opened pilot lamp (15) blind rams and is closed pilot lamp (16), kill manifold is opened pilot lamp (18), kill manifold closes pilot lamp (19), the open flow valve closes pilot lamp (21), the open flow valve is opened pilot lamp (22), second envelope flashboard is opened pilot lamp (24) and is connected with second envelope flashboard pass pilot lamp (25).
CN2009202429529U 2009-11-03 2009-11-03 Blowout preventer console of drilling simulator Expired - Lifetime CN201562391U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2009202429529U CN201562391U (en) 2009-11-03 2009-11-03 Blowout preventer console of drilling simulator
PCT/CN2010/074711 WO2011054209A1 (en) 2009-11-03 2010-06-29 Bop console of drilling simulator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202429529U CN201562391U (en) 2009-11-03 2009-11-03 Blowout preventer console of drilling simulator

Publications (1)

Publication Number Publication Date
CN201562391U true CN201562391U (en) 2010-08-25

Family

ID=42627539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202429529U Expired - Lifetime CN201562391U (en) 2009-11-03 2009-11-03 Blowout preventer console of drilling simulator

Country Status (2)

Country Link
CN (1) CN201562391U (en)
WO (1) WO2011054209A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016090334A1 (en) * 2014-12-05 2016-06-09 National Oilwell Varco, L.P. Method of closing a blowout preventer seal based on seal erosion
CN113187468A (en) * 2021-04-01 2021-07-30 东北石油大学 Wellhead sealing simulation device for high-pressure gas well

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3971926A (en) * 1975-05-28 1976-07-27 Halliburton Company Simulator for an oil well circulation system
CN2857140Y (en) * 2005-12-30 2007-01-10 长庆石油勘探局 Well controol training simulation operator for well working
CN201057015Y (en) * 2007-04-24 2008-05-07 中国石油天然气集团公司 Control device of electric-controlled ground blowout preventer
CN101100939B (en) * 2007-08-03 2010-06-02 中国海洋石油总公司 Depth tracking device for logging while drilling
NO20081293L (en) * 2008-03-11 2009-09-14 Aker Mh As Simulator system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016090334A1 (en) * 2014-12-05 2016-06-09 National Oilwell Varco, L.P. Method of closing a blowout preventer seal based on seal erosion
US10132133B2 (en) 2014-12-05 2018-11-20 National Oilwell Varco, L.P. Method of closing a blowout preventer seal based on seal erosion
CN113187468A (en) * 2021-04-01 2021-07-30 东北石油大学 Wellhead sealing simulation device for high-pressure gas well
CN113187468B (en) * 2021-04-01 2022-05-31 东北石油大学 Wellhead sealing simulation device for high-pressure gas well

Also Published As

Publication number Publication date
WO2011054209A1 (en) 2011-05-12

Similar Documents

Publication Publication Date Title
CN201562390U (en) distributed drilling simulator
CN101789190B (en) Distributed well drilling simulation system
RU2517261C2 (en) Portable drilling simulation system
CN101789191A (en) Distributed well drilling simulation system and operation method
CN201364662Y (en) Simulation system for driller control
CN2857140Y (en) Well controol training simulation operator for well working
CN102384621B (en) Refrigerator
CN105370234A (en) Intelligent control device for blowout preventer
CN201556348U (en) Driller console of drilling simulator
CN201562391U (en) Blowout preventer console of drilling simulator
CN206071559U (en) Proppant settlement law dynamic analog device under visualization confined pressure state
CN203706485U (en) Ship ballast water system operation and troubleshooting simulator
CN102768809A (en) Coal mine auxiliary shaft hoisting system virtual practical training operation system and method
CN201556349U (en) Portable drilling simulator
CN201246056Y (en) Pneumatic automatic window
CN204839172U (en) Water dispenser control system
CN206179346U (en) Process control tests platform based on matlab and winCC
CN201521276U (en) Control device of electric control type ground blowout preventer
CN202598777U (en) Intelligent air conditioner system
CN204883324U (en) Deep water production facility installation under water, emulation loop wheel machine control cabinet of retrieving
CN204040741U (en) A kind of pneumatic vent window cigarette sense control cabinet
CN204002272U (en) Pneumatic vent window is controlled in a kind of illumination
CN207427596U (en) For the gas well switch board of playback of data curve
CN203630572U (en) Autoclave automatic control cabinet
CN204009408U (en) A kind of pneumatic vent window illumination control box

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100825