CN201555632U - 动水水位取样装置 - Google Patents
动水水位取样装置 Download PDFInfo
- Publication number
- CN201555632U CN201555632U CN2009203157945U CN200920315794U CN201555632U CN 201555632 U CN201555632 U CN 201555632U CN 2009203157945 U CN2009203157945 U CN 2009203157945U CN 200920315794 U CN200920315794 U CN 200920315794U CN 201555632 U CN201555632 U CN 201555632U
- Authority
- CN
- China
- Prior art keywords
- water
- water inlet
- dividing plate
- water level
- level sensor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)
Abstract
本实用新型涉及一种动水水位取样装置,特别适用于灌区渠道压力式水位传感器的安装。技术方案是包含水位传感器安装管(6)、外壳(1)、多层进水隔板、进水口(8),水位传感器安装管(6)设置在外壳(1)内,外壳上设有进水口,与进水口连通的多层进水隔板设置在外壳内,多层进水隔板在外壳内构成迷宫式通道,该通道的出口连通水位传感器安装管。采用本实用新型,水流经变化的水路,经过多层进水隔板后进入水位传感器安装管,由于迷宫式通道的作用,消除了水流涌动,从而消除因水流造成的动水对水位传感器可靠性的影响。可将在工厂制造好的动水水位取样装置在使用现场方便的安装,大大降低了现场工作量和维护量。
Description
所属技术领域:
本实用新型涉及一种动水水位取样装置,特别适用于灌区渠道压力式水位传感器的安装。
背景技术:
目前,水利行业中灌溉渠道水位测量大都采用压力式水位传感器,压力式水位传感器适用于静压力环境下水位的测量,由于渠道水流原因,测量现场很难形成静压的测量环境,为保证测量的准确性,使用压力式水位传感器测量水位时,必须采用水位测井以消除水流造成的动水影响,使得灌区建设费用增加、建设周期延长,从而给使用部门造成巨大压力。
实用新型内容:
本实用新型目的是提供一种动水水位取样装置,作用相当于简化的测井,安装简单和成本低廉,大大提高压力式水位传感器工作的可靠性,解决背景技术存在的上述问题。
本实用新型的技术方案是:动水水位取样装置包含水位传感器安装管、外壳、多层进水隔板、进水口,水位传感器安装管设置在外壳内,外壳上设有进水口,与进水口连通的多层进水隔板设置在外壳内,多层进水隔板在外壳内构成迷宫式通道,该通道的出口连通水位传感器安装管。
所说的多层进水隔板分层布置,数量是任意的,每层进水隔板上面设有进水孔,相邻进水隔板上设置进水孔的位置不在同一直线上,使得水流通道在外壳内形成迷宫式通道;例如:多层进水隔板包括分层布置的进水底板、隔板、进水板,在进水底板、隔板、进水板上设有进水孔,进水底板上的进水孔设置在进水底板的两侧部位,与之相邻的隔板进水孔设置在隔板的中间位置,与隔板相伴的进水板上的进水孔设置在进水板的两侧部位。所说的进水孔的数量形状都是任意的,例如:进水底板、进水板的两侧部位各设置三个进水孔,隔板的中间位置设置一个大的进水孔。
水位传感器放置在水位传感器安装管的底部。
采用本实用新型,水流经变化的水路,经过多层进水隔板后进入水位传感器安装管,由于迷宫式通道的作用,消除了水流涌动,从而消除因水流造成的动水对水位传感器可靠性的影响。
可将在工厂制造好的动水水位取样装置在使用现场方便的安装,大大降低了现场工作量和维护量。
本实用新型具有如下优点:
①将水位传感器安装管、外壳和多层进水隔板组成在一起,可在工厂批量制造;迷宫式通道的作用,消除了水流涌动,从而消除因水流造成的动水对水位传感器可靠性的影响;
②由于设备已事先整体集成,在使用现场安装维护都非常方便;
③降低了测井费用和建设周期。
附图说明:
图1为本实用新型实例结构示意图;
图2为图1的俯视图;
图3为B-B剖视图;
图4为C-C剖视图;
图5为D-D剖视图;
图6为E-E剖视图.
图中:外壳1,进水底板2,进水板3,隔板4,挡板5,水位传感器安装管6,顶盖7,进水口8,进水孔9。
具体实施方式:
以下结合附图,通过实施例对本实用新型作进一步说明。
参照附图1、2,动水水位取样装置包含水位传感器安装管6、外壳1、多层进水隔板、进水口8,水位传感器安装管6设置在外壳1内,外壳上设有进水口,与进水口连通的多层进水隔板设置在外壳内,多层进水隔板在外壳内构成迷宫式通道,该通道的出口连通水位传感器安装管。所说的多层进水隔板分层布置,每层进水隔板上面设有进水孔,相邻进水隔板上设置进水孔的位置不在同一直线上,使得水流通道在外壳内形成迷宫式通道。
水位传感器放置在水位传感器安装管的底部,本实用新型从下到上依次为:进水口、多层进水隔板、挡板5、水位传感器安装管、顶盖7。
参照附图3、4、5、6,实施例中,多层进水隔板包括分层布置的进水底板2、隔板4、进水板3,在进水底板、隔板、进水板上设有进水孔9,进水底板上的进水孔设置在进水底板的两侧部位,与之相邻的隔板进水孔设置在隔板的中间位置,与隔板相伴的进水板上的进水孔设置在进水板的两侧部位。
采用本实用新型,水流经变化的水路,经过多层进水隔板后进入水位传感器安装管,由于迷宫式通道的作用,消除了水流涌动,从而消除因水流造成的动水对水位传感器可靠性的影响。
Claims (3)
1.一种动水水位取样装置,其特征在于包含水位传感器安装管(6)、外壳(1)、多层进水隔板、进水口(8),水位传感器安装管(6)设置在外壳(1)内,外壳上设有进水口,与进水口连通的多层进水隔板设置在外壳内,多层进水隔板在外壳内构成迷宫式通道,该通道的出口连通水位传感器安装管。
2.根据权利要求1所述之动水水位取样装置,其特征在于所说的多层进水隔板分层布置,每层进水隔板上面设有进水孔,相邻进水隔板上设置进水孔的位置不在同一直线上,使得水流通道在外壳内形成迷宫式通道。
3.根据权利要求2所述之动水水位取样装置,其特征在于多层进水隔板包括分层布置的进水底板(2)、隔板(4)、进水板(3),在进水底板、隔板、进水板上设有进水孔(9),进水底板上的进水孔设置在进水底板的两侧部位,与之相邻的隔板进水孔设置在隔板的中间位置,与隔板相伴的进水板上的进水孔设置在进水板的两侧部位。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009203157945U CN201555632U (zh) | 2009-11-25 | 2009-11-25 | 动水水位取样装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009203157945U CN201555632U (zh) | 2009-11-25 | 2009-11-25 | 动水水位取样装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201555632U true CN201555632U (zh) | 2010-08-18 |
Family
ID=42615318
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009203157945U Expired - Fee Related CN201555632U (zh) | 2009-11-25 | 2009-11-25 | 动水水位取样装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201555632U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103759786A (zh) * | 2014-01-22 | 2014-04-30 | 唐山现代工控技术有限公司 | 一种高流速渠道测井内水位稳定方法及装置 |
-
2009
- 2009-11-25 CN CN2009203157945U patent/CN201555632U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103759786A (zh) * | 2014-01-22 | 2014-04-30 | 唐山现代工控技术有限公司 | 一种高流速渠道测井内水位稳定方法及装置 |
CN103759786B (zh) * | 2014-01-22 | 2016-06-22 | 唐山现代工控技术有限公司 | 一种高流速渠道测井内水位稳定方法及装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101126652B (zh) | 电子式质量流量燃气计量表 | |
CN102680058A (zh) | 可移动式质量法液体流量标准装置 | |
CN200979430Y (zh) | 气、水、油两相三介质流量测量装置 | |
CN202083421U (zh) | 流量测量孔板及收集井流量测量节流装置 | |
CN201555632U (zh) | 动水水位取样装置 | |
CN202141482U (zh) | 一种森林流域测流装置 | |
CN203376230U (zh) | 一种浆液pH值和密度值测量装置 | |
CN201555643U (zh) | 带孔上隔板稳压罐 | |
CN103234604A (zh) | 堰槽明渠流量计检定装置 | |
CN202947901U (zh) | 一种多参数在线取样装置 | |
CN202915960U (zh) | 皮托管流量计 | |
CN202024803U (zh) | 一种co2气体排量监测装置 | |
CN204612703U (zh) | 一种渗流监测区的渗流监测装置 | |
CN104807517A (zh) | 一种用于灌区明渠自动量水的监测系统 | |
CN202393431U (zh) | 分流式孔板流量计 | |
CN104501893A (zh) | 大量程高精度自动产流量测量系统 | |
CN204854847U (zh) | 一种mems流量计流道结构 | |
CN211262372U (zh) | 一种分级测量式流量监测井 | |
CN106053739A (zh) | 一种多功能跑水试验台 | |
CN204612858U (zh) | 吸收塔除雾器差压测量装置 | |
CN205956624U (zh) | 一种用于排水管道的新型流量控制装置 | |
CN203053910U (zh) | 一种液体恒流速在线分析监测装置 | |
CN105698888A (zh) | 一种用于收集地表径流水的装置 | |
CN111189504A (zh) | 一种分级测量式流量监测井及流量测量方法 | |
CN203163770U (zh) | 一种滤芯检测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100818 Termination date: 20121125 |