CN201546440U - Suspended scaffold upright rod load-bearing base capable of moving for distance adjusting - Google Patents

Suspended scaffold upright rod load-bearing base capable of moving for distance adjusting Download PDF

Info

Publication number
CN201546440U
CN201546440U CN2009202559448U CN200920255944U CN201546440U CN 201546440 U CN201546440 U CN 201546440U CN 2009202559448 U CN2009202559448 U CN 2009202559448U CN 200920255944 U CN200920255944 U CN 200920255944U CN 201546440 U CN201546440 U CN 201546440U
Authority
CN
China
Prior art keywords
bearing base
scaffold
bottom plate
upright rod
upright
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202559448U
Other languages
Chinese (zh)
Inventor
陈克荣
郭文山
刘建华
张明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shuanglou Construction Group Co Ltd
Original Assignee
Jiangsu Shuanglou Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shuanglou Construction Group Co Ltd filed Critical Jiangsu Shuanglou Construction Group Co Ltd
Priority to CN2009202559448U priority Critical patent/CN201546440U/en
Application granted granted Critical
Publication of CN201546440U publication Critical patent/CN201546440U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a suspended scaffold upright rod load-bearing base capable of moving for distance adjusting and used for fixing upright rods of a scaffold. The base is formed by a metal bottom plate and an upright short pipe welded on the bottom plate, and a pair of parallel edges of the metal bottom plate is respectively folded towards each other to form chutes matched with upper legs of an H-steel suspended beam. Row distance between two rows of the upright rods of the suspended scaffold can be conveniently adjusted by sliding the scaffold upright rod load-bearing base back and forth along the upper legs of the H-steel via the chutes on the bottom plate, thereby meeting row distance needs of double-row upright rods of scaffolds of different projects. The base has the advantages of having simple and small structure, being long-termed repeatedly usable, saving cost and enhancing working efficiency.

Description

The builder's jack vertical rod pressure-bearing base of removable roll adjustment
Technical field
The utility model relates to the builder's jack vertical rod pressure-bearing base of the pressure-bearing base, particularly a kind of removable roll adjustment that are used for fixing scaffold upright rod in the construction work.
Background technology
In the building engineering, the conventional fixed method of the inside and outside double steel pipe vertical rod of builder's jack all directly is bearing in i iron and encorbelments on the beam, and in scaffold building, use and demolishing process, vertical rod slippage takes place easily and produces hidden dangers such as support body inclination.Present improved method is: according to the array pitch of the double vertical rod of builder's jack, on encorbelmenting beam, welds I-shaped the short and small steel bar end of two high about 120mm, diameter phi 25~φ 28 in advance, then with inside and outside double vertical rod socket joint on steel bar end, prevent double steel pipe vertical rod generation slippage and produce the effect that support body tilts thereby play.Because the scaffold array pitch of different engineerings is inequality, therefore often need on encorbelmenting beam, weld in i iron short and small steel bar end again, to adapt to new array pitch.The welding of the repeated multiple times expense of not only taking a lot of work is expected, has also influenced carrying mechanical property and the number of turnover and the application life of i iron, is unfavorable for saving cost, improves work efficiency.
Summary of the invention
The purpose of this utility model provides a kind of builder's jack vertical rod pressure-bearing base of economic, practical removable roll adjustment, and it can regulate array pitch easily, to adapt to the needs of different engineerings, reaches the purpose that improves work efficiency.
The utility model is made up of a metal base plate and a vertical short tube that is welded on the metal base plate; The pair of parallel limit of said metal base plate is turned back and can be matched with the encorbelment last leg of beam of i iron to opposite side respectively, and the chute that can slide along last leg.
This scaffold upright rod pressure-bearing base can slide the array pitch of regulating the double vertical rod of builder's jack easily by chute front and back on leg on the i iron of base plate.This pressure-bearing understructure is simply small and exquisite, can the batch production typing produce in batches, but field machining is made again, once investment, prolonged and repeated turnover are used, can regulate the array pitch of inside and outside double steel pipe vertical rod after the on-the-spot assembling fast flexibly effectively, and stable, safety, reliable, saved existing scaffold needs again the expense of the taking a lot of work material work of the short and small steel bar end of a large amount of welding at every turn because of the adjustment of vertical rod array pitch, saved cost, improved work efficiency.
Description of drawings
Fig. 1 is the three-dimensional structure diagram of the utility model scaffold upright rod pressure-bearing base.
Fig. 2 is the encorbelment sectional drawing of beam annexation of scaffold upright rod pressure-bearing base and i iron.
Fig. 3 is the on-the-spot user mode schematic diagram of scaffold upright rod pressure-bearing base.
Among the figure, the vertical short tube of 1-, 2-metal base plate, 2-1-base plate chute, the 3-weld seam, row's steel pipe vertical rod in the 4-builder's jack, the 5-i iron beam of encorbelmenting, the encorbelment last leg of beam of 5-1-i iron, the 6-builder's jack effluxes the steel pipe vertical rod, encorbelment the fixedly short tube in the beam outside of 7-i iron.
The specific embodiment
Further specify example structure of the present utility model below in conjunction with accompanying drawing.
As Fig. 1, this builder's jack vertical rod pressure-bearing base is made up of a metal base plate 2 and the vertical zinc-plated short tube 1 that is welded on the base plate 2; A pair of chute 2-1 is turned back into to opposite side respectively in the pair of parallel limit of metal base plate 2.As Fig. 2, chute 2-1 and i iron encorbelment that the last leg 5-1 of beam 5 matches and can be on last leg 5-1 sliding transfer.Zinc-plated short tube 1 is weldingly fixed on the bearing bottom plate 2 by weld seam 3.
Metal base plate 2 adopts hot-roll forming or passes through the machining moulding by rectangular bar of steel plate.The length of the metal base plate 2 after the moulding should be more bigger than the last leg 5-1 width dimensions of i iron 5, be beneficial to form between the last leg of metal platen and i iron certain space, can on leg 5-1 on the i iron 5, slide front and back, realize regulating the function of the double vertical rod array pitch of builder's jack.
Fig. 3 is that the mounting means schematic diagram is set up at the scene of scaffold upright rod pressure-bearing base, among the figure, effluxes vertical rod 6 cover and is inserted on the short tube 7, and short tube 7 is the fixedly short tubes that directly are welded on the leg 5-1, so it is not removable to efflux vertical rod 6; Be used to overlap the pressure-bearing base of arranging vertical rod 4 in inserting and be assemblied in leg 5-1 by Fig. 2 mode, its base plate 2 can horizontally slip on last leg 5-1 by chute, regulate and efflux the distance of vertical rod 6, then inboard scaffold upright rod 4 covers are inserted on the vertical zinc-plated short tube 1, thereby make the inboard scaffold upright rod 4 and the array pitch of the scaffold upright rod 6 in the outside meet engine request.

Claims (1)

1. the builder's jack vertical rod pressure-bearing base of removable roll adjustment is characterized in that being made up of a metal base plate and a vertical short tube that is welded on this metal base plate; The pair of parallel limit of said metal base plate is turned back and can be matched with the encorbelment last leg of beam of i iron to opposite side respectively, and chute that can the edge.
CN2009202559448U 2009-11-27 2009-11-27 Suspended scaffold upright rod load-bearing base capable of moving for distance adjusting Expired - Fee Related CN201546440U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202559448U CN201546440U (en) 2009-11-27 2009-11-27 Suspended scaffold upright rod load-bearing base capable of moving for distance adjusting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202559448U CN201546440U (en) 2009-11-27 2009-11-27 Suspended scaffold upright rod load-bearing base capable of moving for distance adjusting

Publications (1)

Publication Number Publication Date
CN201546440U true CN201546440U (en) 2010-08-11

Family

ID=42601614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202559448U Expired - Fee Related CN201546440U (en) 2009-11-27 2009-11-27 Suspended scaffold upright rod load-bearing base capable of moving for distance adjusting

Country Status (1)

Country Link
CN (1) CN201546440U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852334A (en) * 2012-09-27 2013-01-02 江苏弘盛建设工程集团有限公司 Construction technology for high-rise anti-slippage scaffold
CN105113775A (en) * 2015-09-18 2015-12-02 中建七局(上海)有限公司 Basic structure of cantilever scaffold
CN105649322A (en) * 2016-03-01 2016-06-08 中国建筑第八工程局有限公司 Overall jacking platform hanger sliding beam system
CN106193572A (en) * 2016-08-30 2016-12-07 中国华西企业股份有限公司 A kind of safety labor-saving can position vertical rod
CN108547443A (en) * 2018-04-12 2018-09-18 中建四局第四建筑工程有限公司 The upright bar bearing adjusted and its construction method are moved on a kind of overhanging I-steel
CN109707146A (en) * 2018-12-29 2019-05-03 中国二十冶集团有限公司 Simple overhanging type slides scaffold construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852334A (en) * 2012-09-27 2013-01-02 江苏弘盛建设工程集团有限公司 Construction technology for high-rise anti-slippage scaffold
CN102852334B (en) * 2012-09-27 2015-06-03 江苏弘盛建设工程集团有限公司 Construction technology for high-rise anti-slippage scaffold
CN105113775A (en) * 2015-09-18 2015-12-02 中建七局(上海)有限公司 Basic structure of cantilever scaffold
CN105649322A (en) * 2016-03-01 2016-06-08 中国建筑第八工程局有限公司 Overall jacking platform hanger sliding beam system
CN106193572A (en) * 2016-08-30 2016-12-07 中国华西企业股份有限公司 A kind of safety labor-saving can position vertical rod
CN108547443A (en) * 2018-04-12 2018-09-18 中建四局第四建筑工程有限公司 The upright bar bearing adjusted and its construction method are moved on a kind of overhanging I-steel
CN109707146A (en) * 2018-12-29 2019-05-03 中国二十冶集团有限公司 Simple overhanging type slides scaffold construction method

Similar Documents

Publication Publication Date Title
CN201546440U (en) Suspended scaffold upright rod load-bearing base capable of moving for distance adjusting
CN201597365U (en) Lathe bed of an engraving machine
CN203559531U (en) Metal roof forming and transportation integrated construction device
CN202053011U (en) Double-wire submerged arc welding device with hydraulic displacement for wind tower foundation ring
CN201579547U (en) Mini-excavator unloading frame correcting device
CN202544399U (en) Supporting frame for overhang floor slab with steel structure
CN215802240U (en) House steel construction with resistance to deformation
CN211331996U (en) Molten tin bath bottom plate steel constructs frame welding frock
CN210857492U (en) Fabricated building structure system
CN201055869Y (en) Main unit base of sizing machine for producing weldless steel tube
CN201028274Y (en) High-pressure gas storage cabinet housing
CN206605186U (en) A kind of production fixture of generating set
CN202021441U (en) Assembly mould for steel frame vertical gusset
CN207593155U (en) A kind of anchor bolt welds displacement device
CN213402884U (en) Two-sided photovoltaic module light steel photovoltaic support that excels in
CN203569681U (en) Cantilever beam supporting structure
CN213449159U (en) High strength crossbeam steel construction
CN215093150U (en) Special tool for disassembling deep well submersible pump
CN208456086U (en) A kind of portable panels reinforced mesh welding stool
CN211338492U (en) Hoisting tool
CN218487611U (en) Horizontal method equipment auxiliary device of industrial field equipment
CN213420320U (en) Precision laminating machine frame
CN214844402U (en) Guardrail thrust test device
CN210549182U (en) Welding support tool
CN211387486U (en) Welded pipe mould convenient to dismantle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100811

Termination date: 20161127

CF01 Termination of patent right due to non-payment of annual fee