The anti-corrosive apparatus of Gas Production control system rack chamber
Technical field
The utility model relates to the anticorrosion of a kind of Gas Production control system rack chamber, belongs to electrical equipment aseptic technic field.
Background technology
Gas producer gas station control room host computer is the brain of whole Gas Production, and manufacture control, load adjustment all are to finish by operations staff's input command on host computer.But,, still have in the air that spreads in whole gas station on a small quantity though these corrosive gas are handled in existing all kinds of measures owing in the Gas Production process, can produce macro-corrosion gas.These air that have the microcorrosion medium have very serious harm for comparatively accurate host computer.Because the computer chip that causes of corrosion damages, host slot over oxidation and losing efficacy, phenomenons such as hard-disk interface rust corrosion and display blank screen fault are endangering gas producer gas station safety, stable, operation efficiently always.In industrial production, there are a lot of similarly situations too.
Summary of the invention
The technical problems to be solved in the utility model is: the anti-corrosive apparatus that a kind of Gas Production control system rack chamber is provided, this apparatus structure is simple, easy for installation, cheap, can regulate and control according to the condition of production flexibly, produce deficiencies such as serious harm for host computer with the air that overcomes the Korrosionsmedium that prior art exists.
The technical solution of the utility model is: it comprises divider wall, compressed air hose, compressed air control stop valve, compressed air flash vessel, air-conditioning and an exhaust fan composition.Divider wall is set in the control room, divider wall is arranged between host computer and the operations staff's input equipment, compressed air hose one end connects plant area's compressed air pipe network, and the other end is connected to the compressed air flash vessel place that is positioned under the air-conditioning air intake, and exhaust fan is arranged on the wall of control room.
Divider wall is arranged between host computer and the operations staff's input equipment, and is provided with a confession personnel turnover.Compressed air hose is picked out by plant area's compressed air pipe network and is connected to the compressed air flash vessel place that is positioned under the air-conditioning air intake by compressed air control stop valve control and along the control room wall, exhaust fan is positioned on the wall of control room, is used for getting rid of to the external world air of upper rack chamber.
Compressed air is sent into the air capacity of rack chamber by stop valve control, after the flash vessel dilatation, drain into the air-conditioning inlet scoop, blow to upper rack chamber by air-conditioning through the cooled air of air-conditioning, not only guarantee the pressure-fired of the indoor pure air in rack chamber, also reduced the temperature of rack chamber.According to the gas house location, isolate back rack chamber size and host computer quantity and determine inlet and outlet amount and ventilation rate, and then the time and the number of times of the unlatching of definite exhaust fan.
Compared with the prior art, the utility model separates with the host computer input equipment host computer body with divider wall, and feeds the compressed air that does not contain Korrosionsmedium, can guarantee that host computer moves in clean relatively environment; The compressed air that reduce to suck by air-conditioning, and air in the circulation cool room have reduced the rack room temperature, so that host computer can stable operation; Whole corrosion protection system reduced investment, nothing are taken up an area of, and can adopt when newly constructing the factory buildings, and also can undergo technological transformation to old factory building.The utility model also is applicable to the upper rack chamber in corrosive atmosphere work.
Description of drawings
Fig. 1 is a system schematic of the present utility model.
Fig. 2 is the flash vessel scheme of installation that is used for cabinet air-conditioner.
Fig. 3 is the flash vessel scheme of installation that is used for wall-hanging air conditioner.
Being labeled as among the figure:: the 1-divider wall, the 2-compressed air hose, 3-controls stop valve, 4-compressed air flash vessel, 5-air-conditioning, 6-exhaust fan, 7-door, 8-compressed air pipe network, 9-control room, the upper rack of 10-chamber, 11-air-conditioner air outlet, 12-air-conditioning air intake.
The specific embodiment
Embodiment of the present utility model: it comprises divider wall 1, compressed air hose 2, compressed air control stop valve 3, compressed air flash vessel 4, air-conditioning 5 and a composition such as exhaust fan 6.Divider wall 1 is set in control room 9, divider wall 1 is arranged between host computer and the operations staff's input equipment, compressed air hose 2 one ends connect plant area's compressed air pipe network 8, and the other end is connected to compressed air flash vessel 4 places that are positioned under air-conditioning 5 air intakes, and exhaust fan 6 is arranged on 9 walls of control room.
Control stop valve 3 is arranged on compressed air hose 2.
Divider wall 1 adopts the glass manufacturing.
Door 7 is set on the divider wall 1.
Compressed air hose 2 is picked out by plant area's compressed air pipe network 8 and is connected to compressed air flash vessel 4 places that are positioned under air-conditioning 5 air intakes by 3 controls of compressed air control stop valve and along control room 9 walls, and exhaust fan 6 is got rid of upper rack chamber 10 air to the external world.
As be located in certain alumina producer gas producer gas station of southern area, be equipped with 5 host computers.Because environment temperature is higher, upper in addition board number is more, and calorific value is bigger, and air-conditioning is held open in a long time, to keep the rack room temperature below 20 ℃.Determine each compressed air control valve opening time according to room area, treat that indoor being full of behind the pure air carried out 1-2 ventilation every 1 hour, when exhaust, keep compressed air control valve to open, to keep the pressure-fired of rack chamber with respect to external environment.