CN201537622U - Rubbish landfill gas preprocess complete plant - Google Patents

Rubbish landfill gas preprocess complete plant Download PDF

Info

Publication number
CN201537622U
CN201537622U CN2009203060988U CN200920306098U CN201537622U CN 201537622 U CN201537622 U CN 201537622U CN 2009203060988 U CN2009203060988 U CN 2009203060988U CN 200920306098 U CN200920306098 U CN 200920306098U CN 201537622 U CN201537622 U CN 201537622U
Authority
CN
China
Prior art keywords
gas
preliminary treatment
landfill gas
rubbish landfill
complete set
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203060988U
Other languages
Chinese (zh)
Inventor
赖明帅
林锋
林皓
张壮
张统良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHUANGDONG ENERGY ENVIRONMENTAL PROTECTION TECHNOLOGY (FUJIAN) Co Ltd
Original Assignee
CHUANGDONG ENERGY ENVIRONMENTAL PROTECTION TECHNOLOGY (FUJIAN) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHUANGDONG ENERGY ENVIRONMENTAL PROTECTION TECHNOLOGY (FUJIAN) Co Ltd filed Critical CHUANGDONG ENERGY ENVIRONMENTAL PROTECTION TECHNOLOGY (FUJIAN) Co Ltd
Priority to CN2009203060988U priority Critical patent/CN201537622U/en
Application granted granted Critical
Publication of CN201537622U publication Critical patent/CN201537622U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a rubbish landfill gas preprocess complete plant, which comprises a preprocess pipe, a pressure meter and a thermometer are arranged on the preprocess pipe, an inlet and an outlet of the preprocess pipe are in turn provided with a primary filter, a condenser, a gas-water separator and a fan, a flowmeter, a thermometer, a pressure meter and a gas analyzer are provided on the output pipe of the fan, an way of an output end of the fan after air cooling is connected to a gas electric generating set through a fine filter and a flame arrester, the other way of the output end of the fan is connected to a torch, according to the complete plant of the utility model, the quality of the landfill gas can be effectively improved, and the gas pressure can be stabilized, the requirement of the gas electric generating set to the gas can be satisfied, and the gas electric generating set can operate stably and reliably.

Description

Rubbish landfill gas preliminary treatment complete set of equipments
Technical field
The utility model relates to a kind of rubbish landfill gas preliminary treatment complete set of equipments.
Background technology
The fuel that rubbish fills up the utilization of gas power plant is landfill gas, and landfill gas is a kind of fuel gas, i.e. our usually said biogas.The technological process of whole landfill gas power generation factory comprises that landfill gas is collected, landfill gas is handled, the generating of fuel gas generation unit and step-up transformer boost the back to grid transmission, and wherein to handle be a committed step to landfill gas.Landfill gas has usually near saturated relative humidity, in the conveying and processing procedure of gas, when gas temperature is lower than its dew point, will produce condensed water, under the effect of condensed water, if the corrosion composition in the gas not in addition the processing meeting operating generator is caused very big injury, the fine particle in the landfill gas also can cause wearing and tearing to the parts of generator in addition.
Summary of the invention
The purpose of this utility model is to provide a kind of rubbish landfill gas preliminary treatment complete set of equipments, and this equipment can effectively improve the quality of landfill gas and the air pressure of stabilizing gas, makes it satisfy the requirement of generator to combustion gas, guarantees that set steady moves reliably.
Of the present utility model being characterised in that: described preliminary treatment pipeline is provided with pressure gauge and thermometer, described preliminary treatment pipeline import and export is disposed with initial filtrator, condenser, moisture trap and blower fan, the output channel of described blower fan is provided with flowmeter, thermometer, pressure and takes into account gas analyzer, possesses CDM on-line monitoring function, the output one tunnel of described blower fan is connected to the fuel gas generation unit after by fine filter and spark arrester after air-cooled, and another road is connected to torch.
The rubbish landfill gas preliminary treatment complete set of equipments that the utility model provides is collected house steward with gas and directly is connected, swabbing action by blower fan is collected landfill gas in the pretreatment unit, stablize the gas that control can be met requirement by gas being carried out cool-down dehumidification, thickness filtration and outlet pressure again, this equipment is antiknock device, the safe class height; Each link of system comprises pipeline and all possesses automatic continuous drainage function; Cross when low when the preliminary treatment inlet pressure, system has the response of sound and light alarm even shutdown; When the winter temperature environment was lower than certain value, handpiece Water Chilling Units possessed automatic shutdown function; Cross when low when the preliminary treatment outlet temperature, air-cooled unit possesses automatic shutdown function; Control module adopts the engineering configuration software, acquisition process, storage data, supervisory control system running, friendly interface.
Description of drawings
Fig. 1 is a workflow diagram of the present utility model.
The specific embodiment
A kind of rubbish landfill gas preliminary treatment complete set of equipments, comprise the preliminary treatment pipeline, described preliminary treatment pipeline is provided with pressure gauge and thermometer, described preliminary treatment pipeline import and export is disposed with initial filtrator, condenser, moisture trap and blower fan, the output channel of described blower fan is provided with flowmeter, thermometer, pressure and takes into account gas analyzer, the output one tunnel of described blower fan is connected to the fuel gas generation unit after by fine filter and spark arrester after air-cooled, and another road is connected to torch.
Described condenser is a tubular heat exchanger, adopts cooling water as cooling media, and described moisture trap is the cyclone type gas and water separator, and described blower fan is a roots blower, and its drive motors adopts the frequency conversion fire-proof motor.
The course of work of the present utility model is as follows: landfill gas enters the person in charge and enters in the foam removal filter through stop valve, and bulky grain drop and immobilized particles in the source of the gas can be retained down, and discharges system by sewage draining exit; Gas enters in the condenser of lyophilization module again, and the gas after being cooled is through the gas-liquid separation filter branch liquid that condensation gets off of leaving away, and this module can also be removed the part high boiling substance in the source of the gas, as halogenated hydrocarbons, high-carbon hydrocarbon etc.; After the roots blower supercharging, through cooling heat exchanger the temperature of landfill gas is controlled at 30-40 degree centigrade again, then further removes the dust of diameter 〉=1 μ m through high efficiency particulate air filter, the gas that comes out at last is divided into two-way, one group is removed generating set through spark arrester, and another winding is to torch.

Claims (5)

1. rubbish landfill gas preliminary treatment complete set of equipments, comprise the preliminary treatment pipeline, it is characterized in that: described preliminary treatment pipeline is provided with pressure gauge and thermometer, described preliminary treatment pipeline import and export is disposed with initial filtrator, condenser, moisture trap and blower fan, the output channel of described blower fan is provided with flowmeter, thermometer, pressure and takes into account gas analyzer, the output one tunnel of described blower fan is connected to the fuel gas generation unit after by fine filter and spark arrester after air-cooled, and another road is connected to torch.
2. rubbish landfill gas preliminary treatment complete set of equipments according to claim 1 is characterized in that: described condenser is a tubular heat exchanger, adopts cooling water as cooling media.
3. rubbish landfill gas preliminary treatment complete set of equipments according to claim 1 is characterized in that: described moisture trap is the cyclone type gas and water separator.
4. rubbish landfill gas preliminary treatment complete set of equipments according to claim 1 is characterized in that: described blower fan is a roots blower, and its drive motors adopts the frequency conversion fire-proof motor.
5. rubbish landfill gas preliminary treatment complete set of equipments according to claim 1 is characterized in that: described rubbish landfill gas preliminary treatment complete set of equipments possesses CDM on-line monitoring function.
CN2009203060988U 2009-07-13 2009-07-13 Rubbish landfill gas preprocess complete plant Expired - Fee Related CN201537622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203060988U CN201537622U (en) 2009-07-13 2009-07-13 Rubbish landfill gas preprocess complete plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203060988U CN201537622U (en) 2009-07-13 2009-07-13 Rubbish landfill gas preprocess complete plant

Publications (1)

Publication Number Publication Date
CN201537622U true CN201537622U (en) 2010-08-04

Family

ID=42589076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203060988U Expired - Fee Related CN201537622U (en) 2009-07-13 2009-07-13 Rubbish landfill gas preprocess complete plant

Country Status (1)

Country Link
CN (1) CN201537622U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105368518A (en) * 2015-11-26 2016-03-02 同济大学 System for garbage landfill gas purification and energy utilization and use method thereof
CN110094997A (en) * 2019-04-01 2019-08-06 重庆康达新能源有限公司 Wind cooling temperature lowering system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105368518A (en) * 2015-11-26 2016-03-02 同济大学 System for garbage landfill gas purification and energy utilization and use method thereof
CN110094997A (en) * 2019-04-01 2019-08-06 重庆康达新能源有限公司 Wind cooling temperature lowering system

Similar Documents

Publication Publication Date Title
CN202322831U (en) Methane and landfill gas utilization system
CN204973424U (en) Pitch exhaust purification system
CN204897857U (en) Landfill gas is collected and is utilized system
CN103611377A (en) Gas purification pretreatment method and device
CN105435573A (en) Low-energy-consumption roof haze particle capturing and curing device and monitoring device thereof
CN103074135A (en) Low-concentration methane gas dewatering method and complete equipment
CN201537622U (en) Rubbish landfill gas preprocess complete plant
CN105697110A (en) Automobile exhaust purification and waste heat recovery integrated device
CN203540263U (en) Efficient purification system for power station flue gas
CN210332167U (en) Pretreatment device with modular air-cooled cold and hot water unit
WO2018152605A4 (en) System for cleaning gases and sequestration of particulate matter from internal-combustion engines, with conversion of waste into extra energy
CN205361011U (en) Organic waste gas purification device to five metals workshop
CN205323484U (en) Organic waste gas purifier that processing produced to pitch
CN204294074U (en) Exhaust gas processing device in grease frying oil refining process
CN103614509B (en) A kind of carbon steel converter dry cloth bag dedusting process of whole process recovery waste heat and device thereof
CN202893796U (en) Integrated landfill gas pretreatment and torch complete device
CN208920078U (en) A kind of flare gas recovery processing system for power generation
CN103925162B (en) Gas flow generating device
CN210303026U (en) Tail gas treatment system of tank field and loading system
CN203790798U (en) Purification treatment system for waste gas produced in production process of furfural
CN201605252U (en) Device for removing sulphur, water and dust from landfill gas
CN203625414U (en) Dry cloth-bag dust removal device for carbon steel converter capable of recovering waste heat in whole process
CN207694433U (en) Landfill gas pretreatment unit
CN201704296U (en) Coal gasifier coal gas dry bag type coal gas purifying device
CN204582842U (en) A kind of skid-mounted landfill gas purifier

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100804

Termination date: 20180713