CN201526151U - Three-dimensional zigzag-shaped steel truss assembled support frame - Google Patents

Three-dimensional zigzag-shaped steel truss assembled support frame Download PDF

Info

Publication number
CN201526151U
CN201526151U CN2009203081838U CN200920308183U CN201526151U CN 201526151 U CN201526151 U CN 201526151U CN 2009203081838 U CN2009203081838 U CN 2009203081838U CN 200920308183 U CN200920308183 U CN 200920308183U CN 201526151 U CN201526151 U CN 201526151U
Authority
CN
China
Prior art keywords
steel truss
bracing frame
assembly unit
joist
pairs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203081838U
Other languages
Chinese (zh)
Inventor
陈平
李浓云
何勇
唐杰
杨霞
龚泽鑫
梅振兴
随娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING URBAN CONSTRUCTION JINGGONG STEEL STRUCTURE ENGINEERING Co Ltd
Original Assignee
BEIJING URBAN CONSTRUCTION JINGGONG STEEL STRUCTURE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING URBAN CONSTRUCTION JINGGONG STEEL STRUCTURE ENGINEERING Co Ltd filed Critical BEIJING URBAN CONSTRUCTION JINGGONG STEEL STRUCTURE ENGINEERING Co Ltd
Priority to CN2009203081838U priority Critical patent/CN201526151U/en
Application granted granted Critical
Publication of CN201526151U publication Critical patent/CN201526151U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Disclosed is a three-dimensional zigzag-shaped steel truss assembled support frame which is in three-dimensional zigzag-shaped structure. The support frame comprises a front pair of vertical bars, a rear pair of vertical bars, two lower chord jig frames, two upper chord trimmer beams, operation platforms and pull bars, wherein the two lower chord jig frames placed parallelly are respectively connected to the root portions of two pairs of vertical columns; the two upper chord trimmer beams placed parallelly are respectively connected to the top portions of the two pairs of vertical columns; the operation platforms are connected between the two upper chord trimmer beams; and the pull bars are connected between the front pair of vertical bars and the rear pair of vertical bars. Positioning holes are arranged in the middle portions of the operation platforms, and positioning blocks for controlling the positions of steel truss axes are connected to the edges of the positioning holes. Zigzag-shaped steel truss assembled support technique solves the problems of high-altitude positioning and assembly of steel members, simultaneously provides a safer and more reliable assembly platform for constructors in aloft work, and can be widely applied to the field of steel structure assembly construction.

Description

Solid and formula steel truss assembly unit bracing frame
Technical field
The utility model relates to a kind of bracing frame of construction steel structure assembly unit engineering.
Background technology
The steel truss assembly unit of winding up belongs to work high above the ground, and work progress high and medium location assembly unit difficulty is big, and construction technology mainly is by setting up A-frame (seeing accompanying drawing 1), wind up by many covers A-frame sub-truss, the auxiliary girder location at present; But because A-frame is a two-dimensional structure, self stability is poor, so need drawknot between support and the support, to guarantee to form stabilization element, set spacing can not be excessive simultaneously, otherwise unstability appears in pull bar between support easily; This has increased the steel using amount in the engineering undoubtedly, has increased the difficulty of construction of engineering, has increased the construction cost of engineering.
The utility model content
Utility model provides a kind of solid and formula steel truss assembly unit bracing frame, solve existing bracing frame instability, and the engineering steel amount is big, the technical problem of working security difference.
The technical scheme that its technical problem that solves the utility model adopts is:
This solid and formula steel truss assembly unit bracing frame, it is characterized in that: this bracing frame is solid and font structure, the two pairs of vertical rods before and after comprising, be connected to the parallel and lower edge moulding bed bar put of two of two column roots, be connected to the parallel and joist that winds up put of two of two column tops, be connected in two wind up between the joist operating platform and be connected in pull bar between the two pairs of vertical rods in front and back, described operating platform middle part has locating hole, and the edge of locating hole is connected with the locating piece that is used to control the steel truss axial location.
Above-mentioned locating piece can be positioned at the middle part of the joist that winds up, and two wind up the locating piece of four symmetries on the joist.
About the aforesaid operations platform can be divided into two, two operating platforms laterally are connected the column outside respectively.
A pull bar can respectively be arranged at middle part and top between the two pairs of vertical rods in above-mentioned front and back.
Lower edge moulding bed bar, the joist that winds up, vertical rod and pull bar can be H shaped steel or i iron.
The beneficial effects of the utility model are as follows:
And formula bracing frame shape such as its word by the moulding of several shaped steel assembly weldings, are arranged in the butt joint node place of structure, can adjust rod member height and cross section specification according to the height and the weight of structure.The constructor controls installation accuracy by locating piece, winds up in place by the auxiliary steel truss of the operating platform at moulding bed top.After steel truss was in place, member can break off relations, and had improved the efficient of lifting operation; Especially hang time manyly in structure, under the few situation of hanging device, and formula steel truss assembly unit support technology can improve the lifting efficient of loop wheel machine greatly, satisfies daily demand of hanging time.Because bracing frame is a three-dimensional structure, so its stability will be higher than the A-frame of two-dimensional structure far away; Each bracing frame itself is exactly a stable cell cube, satisfies in rod member rigidity under the condition of self amount of deflection, only arranges in joint, rod member two ends to get final product.Save rolled steel dosage to greatest extent, controlled the construction cost of engineering, and be easy to construction.
And formula steel truss assembly unit support technology has solved location, steel member high-altitude, packing problem, provides a more safe and reliable platform for lining for the constructor in work high above the ground simultaneously.Can be widely used in the steel structure assembling construction field.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the structural representation of existing triangular support bracket.
Fig. 2 is a structural representation of the present utility model.
Fig. 3 is the schematic diagram of construction sequence one, step 2.
Fig. 4 is the schematic diagram of construction sequence three.
Fig. 5 is the schematic diagram of construction sequence four, step 5.
Fig. 6 is the schematic diagram of construction sequence six.
Fig. 7 is the schematic diagram of construction sequence seven.
Reference numeral: 1-vertical rod, 2-lower edge moulding bed bar, 3-locating piece, 4-wind up joist, 5-operating platform, 6-pull bar, 7-bracing frame, 8-steel truss lower chord, 9-steel truss upper chord, 10-steel truss web member.
The specific embodiment
Embodiment is referring to shown in Figure 2, this solid and formula steel truss assembly unit bracing frame, this bracing frame is solid and font structure, the two pairs of vertical rods 1 before and after comprising, be connected to the parallel and lower edge moulding bed bar 2 put of two of two column roots, be connected to the parallel and joist 4 that winds up put of two of two column tops, be connected in two wind up between the joist 4 operating platform 5 and be connected in pull bar 6 between the two pairs of vertical rods in front and back, a pull bar 6 is respectively arranged at middle part and top between the two pairs of vertical rods 1 in front and back.About operating platform is divided into two, two operating platforms laterally are connected the column outside respectively.Operating platform middle part has locating hole, and the edge of locating hole is connected with the locating piece 3 that is used to control the steel truss axial location, and locating piece 3 is positioned at the middle part of the joist 4 that winds up, and two wind up the locating piece 3 of four symmetries on the joist 4.
Lower edge moulding bed bar 2, the joist 4 that winds up, vertical rod 1 and pull bar 6 are H shaped steel or i iron.
Adopt steel truss assembling construction process of the present utility model as follows:
Step 1: the lower edge moulding bed bar 2 of arranging bracing frame 7 at two banjo fixing butt jointing positions of steel truss;
Step 2: after lower edge moulding bed bar 2 deployed, lifting steel truss lower chord 8 was referring to shown in Figure 3;
Step 3: the steel truss lower chord installs, and lifting is the joist that winds up of steel truss fixedly, and the assembly unit bracing frame is referring to shown in Figure 4;
Step 4: the lifting of a Pin steel truss upper chord 9 and steel truss web member 10, upper chord becomes whole back hoisted in position with its straight web member at installation on ground, the constructor is in place by the operating platform 5 auxiliary steel truss upper chords at bracing frame top, by locating piece 3 control installation accuracies.After steel truss was in place, member can break off relations; Referring to shown in Figure 5;
Step 5: the lifting of the 2nd Pin steel truss upper chord and web member, upper chord becomes whole back hoisted in position with its straight web member at installation on ground;
Step 6: the 3rd Pin steel truss lifting, an end is connected with truss, and an end is pulled wind and is fixed by leading the chain drawknot; Referring to shown in Figure 6.
Step 7: install by expansion around the middle mind-set, require the pre-arch camber value of panel point is checked, guarantee the installation accuracy of postorder, referring to shown in Figure 7.

Claims (5)

1. solid and formula steel truss assembly unit bracing frame, it is characterized in that: this bracing frame is solid and font structure, two pairs of vertical rods (1) before and after comprising, be connected to the parallel and lower edge moulding bed bar (2) put of two of two column roots, be connected to the parallel and joist that winds up (4) put of two of two column tops, be connected in the operating platform (5) between two joists that wind up (4) and be connected in pull bar (6) between the two pairs of vertical rods in front and back, described operating platform middle part has locating hole, and the edge of locating hole is connected with the locating piece (3) that is used to control the steel truss axial location.
2. solid according to claim 1 and formula steel truss assembly unit bracing frame, it is characterized in that: above-mentioned locating piece (3) is positioned at the middle part of the joist that winds up (4), and two wind up the locating piece (3) of four symmetries on the joist (4).
3. solid according to claim 1 and formula steel truss assembly unit bracing frame is characterized in that: about the aforesaid operations platform is divided into two, two operating platforms laterally are connected the column outside respectively.
4. solid according to claim 1 and formula steel truss assembly unit bracing frame, it is characterized in that: a pull bar (6) is respectively arranged at middle part between the two pairs of vertical rods in above-mentioned front and back (1) and top.
5. solid according to claim 1 and formula steel truss assembly unit bracing frame is characterized in that: lower edge moulding bed bar (2), the joist that winds up (4), vertical rod (1) and pull bar (6) are H shaped steel or i iron.
CN2009203081838U 2009-08-18 2009-08-18 Three-dimensional zigzag-shaped steel truss assembled support frame Expired - Fee Related CN201526151U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203081838U CN201526151U (en) 2009-08-18 2009-08-18 Three-dimensional zigzag-shaped steel truss assembled support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203081838U CN201526151U (en) 2009-08-18 2009-08-18 Three-dimensional zigzag-shaped steel truss assembled support frame

Publications (1)

Publication Number Publication Date
CN201526151U true CN201526151U (en) 2010-07-14

Family

ID=42517440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203081838U Expired - Fee Related CN201526151U (en) 2009-08-18 2009-08-18 Three-dimensional zigzag-shaped steel truss assembled support frame

Country Status (1)

Country Link
CN (1) CN201526151U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103406702A (en) * 2013-08-21 2013-11-27 安徽鸿路钢结构(集团)股份有限公司 Truss main pipe assembling jig frame
CN105064704A (en) * 2015-09-02 2015-11-18 南京南化建设有限公司 Steel truss splicing, supporting and adjusting device
CN112796528A (en) * 2021-02-23 2021-05-14 中冶建工集团重庆钢结构有限公司 Construction method for high-altitude in-situ splicing of large-span steel truss

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103406702A (en) * 2013-08-21 2013-11-27 安徽鸿路钢结构(集团)股份有限公司 Truss main pipe assembling jig frame
CN105064704A (en) * 2015-09-02 2015-11-18 南京南化建设有限公司 Steel truss splicing, supporting and adjusting device
CN112796528A (en) * 2021-02-23 2021-05-14 中冶建工集团重庆钢结构有限公司 Construction method for high-altitude in-situ splicing of large-span steel truss

Similar Documents

Publication Publication Date Title
CN101629456B (en) Three-dimensional steel truss assembling support frame shaped like a Chinese character qie and construction method for assembling steel truss
CN202509404U (en) High-pier single-column capping beam framework construction support system
CN110700572B (en) Height-adjustable supporting base and using method thereof
CN204919346U (en) Knotted bar iron strutting arrangement that detached pier bent cap is adjustable
CN206646835U (en) It is a kind of from hoisting type steel structure slipping measure support
CN201526151U (en) Three-dimensional zigzag-shaped steel truss assembled support frame
CN105442853B (en) A kind of long-span deformed Elements of Space Grid Truss and landing Steel Structure Installation construction method
CN202007535U (en) Supporting reinforcing structure
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN202718234U (en) Hanging support steel structure
CN203034345U (en) Coal transporting trestle of integral continuous steel truss
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN203530864U (en) Large-span concrete continuous beam bridge side span folding device
CN106368322A (en) Installing method of bidirectional symmetric oblique steel posts used between super high-rise building transfer stories
CN205444935U (en) Special -shaped steel space frame construction and installation structure of complicated large -span department
CN202144681U (en) Oar-type steel well frame
CN210031746U (en) Steel casing drilling platform for bridge construction
CN209780229U (en) Jacking platform system of integrated tower crane
CN203452393U (en) Rhombic truss supporting jig frame
CN203066357U (en) Large-span arch-shaped steel truss structure
CN206467550U (en) Stretch-draw forming combining structure arch bridge
CN202247660U (en) Steel truss piece unit and steel truss structure
CN110565528A (en) Novel assembled cast in situ concrete support
CN216604174U (en) Suspension type center drive mud scraper working bridge
CN113431194B (en) Large-span inclined leg steel pipe truss structure and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100714