CN201526128U - Bowlder-imitated guardrail - Google Patents

Bowlder-imitated guardrail Download PDF

Info

Publication number
CN201526128U
CN201526128U CN2009202066417U CN200920206641U CN201526128U CN 201526128 U CN201526128 U CN 201526128U CN 2009202066417 U CN2009202066417 U CN 2009202066417U CN 200920206641 U CN200920206641 U CN 200920206641U CN 201526128 U CN201526128 U CN 201526128U
Authority
CN
China
Prior art keywords
railing
bowlder
guardrail
pipe
imitated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202066417U
Other languages
Chinese (zh)
Inventor
周建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009202066417U priority Critical patent/CN201526128U/en
Application granted granted Critical
Publication of CN201526128U publication Critical patent/CN201526128U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a bowlder-imitated guardrail, and relates to a profiled bar used for manufacturing guardrails, in particular to the profiled bar used for manufacturing the bowlder-imitated guardrail. A hollow pipe is arranged inside the profiled bar of the bowlder guardrail. The pipe is arranged at the center of the axis of the profiled bar; the pipe material and the profiled bar have the same length; and the pipe is a round pipe or a square pipe. The bowlder-imitated guardrail solves the problem that the existing bowlder-imitated guardrail is easy to break and bend.

Description

Imitative jade railing
Technical field
The utility model relates to a kind of section bar that railing is used of making, particularly a kind of section bar of making imitative jade railing.
Background technology
In the last few years, imitative jade railing in state-owned a lot of manufacturer production, but all be can not command a ready sale in the market because of many disadvantages.Imitative jade railing Main Ingredients and Appearance is that resin and aluminium powder (special clock aluminium hydroxide) are synthetic, product after its moulding enbrittles, the imitative jade railing of initial production is easily broken, railing post falls from 1 meter high place will be broken into several joints, there is potential safety hazard in such railing, therefore just can not be used to make railing.People inserted reinforcing bar in railing afterwards, but new problem occurred again, because resin shrinkage is relatively poor, 10 of the railing posts of inserting reinforcing bar just have 9 buckling phenomenon to occur.Because the deadly defect of the said goods, the production of imitative jade railing can only be short-lived, can not enter in the reality of finishing.
The utility model content
The purpose of this utility model provides a kind of imitative jade railing, and the utility model has solved the frangible and flexible problem that existing imitative jade railing exists.
Imitative jade railing of the present utility model has been inserted hollow tube in the inside of jade railing section bar.
Described tubing is arranged on section bar inner axes position, and tubing and section bar are isometric.
Described tubing is pipe or square tube.
The advantage of the imitative jade railing of the utility model is:
1, owing to produces the resin of imitative jade railing and aluminium powder cost than higher, the imitative jade railing of the high price of producing is not easy to be accepted by the owner, insert the railing behind the hollow section, cost every meter (1 meter handrail and 5 spiles) descends more than 60 yuan, railing after cost descends, retail price is at 400 yuan about every meter, and this price is not high not low, more makes the owner accept product.
2, the product of inserting behind the pipe has solved puzzled people's pull bar buckling problem over the years once.
3, insert the product of hollow circular-tube, weight saving 1/5th, saved cost of transportation.
4, no-reinforcing-bar railing or the reinforcing bar railing is arranged, because concussion, very easily fracture, and insert the railing of pipe in transportation, phenomenon of rupture can not occur in transportation.
5, in handrail, insert rectangular tube (have seam or seamless steel quarter bend), obtain equally above-mentioned effect.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment one;
Fig. 2 is the structural representation of the utility model embodiment two.
The specific embodiment
Below in conjunction with accompanying drawing and with illustrated embodiments the utility model is done detailed explanation.
Embodiment one
Consult Fig. 1, the described imitative jade railing of present embodiment is an accommodation rail 2, and square tube 1 is arranged in handrail.
Embodiment two
Consult Fig. 2, the described imitative jade railing of present embodiment is a railing post 4, and pipe 3 is arranged in handrail.
Above-mentioned pipe and square tube are for having seam or seamless steel pipe.
The utility model has been inserted the hollow rectangle pipe owing to inserted hollow circular-tube at column at handrail, has obtained immense success, and product will be subjected to the welcome in market.
The success that imitative jade railing obtains also has an innovation, has developed big or small imperial post exactly, big or small phoenix post, a series of carved products of big or small orchid post.
As solid wood railing salable on the market, mainly based on circular square column, carve on wooden railing, carve one cutter a moment of carver, cost is high, be difficult for being accepted by the owner, and the imitative jade railing that I produce, specially based on engraving, cost is also low, filled up the vacancy of wooden railing, will be subjected to numerous citizen and like.

Claims (3)

1. imitative jade railing is characterized in that, has inserted hollow tube in the inside of jade railing section bar.
2. imitative according to claim 1 jade railing is characterized in that described tubing is arranged on section bar inner axes position, and tubing and section bar are isometric.
3. imitative according to claim 1 jade railing is characterized in that described tubing is pipe or square tube.
CN2009202066417U 2009-10-12 2009-10-12 Bowlder-imitated guardrail Expired - Fee Related CN201526128U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202066417U CN201526128U (en) 2009-10-12 2009-10-12 Bowlder-imitated guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202066417U CN201526128U (en) 2009-10-12 2009-10-12 Bowlder-imitated guardrail

Publications (1)

Publication Number Publication Date
CN201526128U true CN201526128U (en) 2010-07-14

Family

ID=42517417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202066417U Expired - Fee Related CN201526128U (en) 2009-10-12 2009-10-12 Bowlder-imitated guardrail

Country Status (1)

Country Link
CN (1) CN201526128U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535340A (en) * 2011-12-15 2012-07-04 江苏金土木建设集团有限公司 Planting bar grouting and anchoring construction process for antique stone balustrade
CN107130839A (en) * 2017-06-29 2017-09-05 苏州园林发展股份有限公司 A kind of construction method of gold inlaid jade rail structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535340A (en) * 2011-12-15 2012-07-04 江苏金土木建设集团有限公司 Planting bar grouting and anchoring construction process for antique stone balustrade
CN102535340B (en) * 2011-12-15 2013-12-11 江苏金土木建设集团有限公司 Planting bar grouting and anchoring construction process for antique stone balustrade
CN107130839A (en) * 2017-06-29 2017-09-05 苏州园林发展股份有限公司 A kind of construction method of gold inlaid jade rail structure

Similar Documents

Publication Publication Date Title
CN201526128U (en) Bowlder-imitated guardrail
CN201486215U (en) Light and safe fencing wall for construction site
CN201236327Y (en) Railing
CN201649486U (en) Imitating rosewood jade handrail
CN202658818U (en) Imitated jade handrail
CN205259605U (en) Novel stagnant water split bolt
CN105545023B (en) Swimming pool bottom cushion layer
CN205153212U (en) Steel pipe concrete shear force wall and building
CN206723220U (en) A kind of reinforced nail
CN203160167U (en) Temporary fence for roads
CN204001989U (en) With the bounding wall guardrail of Climb proof thorns
CN204475225U (en) Road construction safety barrier
CN209260618U (en) One kind being easily assembled connection combined isolation guardrail
CN203201021U (en) Wood plastic hollow square column
CN206844807U (en) A kind of modeling wooden rails gone along with sb. to guard him for meadow
CN207224232U (en) A kind of mould for pouring imitation wood stake
CN205135108U (en) Novel safety fence
CN203924902U (en) Cap head and the fence upright of fence upright
CN208669192U (en) A kind of simple folding shaft mouth operating bench
CN203282589U (en) Glass steel sleeper plate mould
CN210138956U (en) Arc template processingequipment
CN204398431U (en) Automatically cleaning composite material
CN203120580U (en) Composite frame structure made of synthetic wood and steel products and used for solar greenhouses
CN103606346B (en) A kind of light high-strength multifunctional anti-theft mark peg
CN202850593U (en) Support rod used for iron product

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100714

Termination date: 20101012