CN201526053U - Assembly box type inspection well for pipeline in lightweight composite material - Google Patents

Assembly box type inspection well for pipeline in lightweight composite material Download PDF

Info

Publication number
CN201526053U
CN201526053U CN2009201951776U CN200920195177U CN201526053U CN 201526053 U CN201526053 U CN 201526053U CN 2009201951776 U CN2009201951776 U CN 2009201951776U CN 200920195177 U CN200920195177 U CN 200920195177U CN 201526053 U CN201526053 U CN 201526053U
Authority
CN
China
Prior art keywords
side plate
composite material
material pipe
light composite
assembling box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201951776U
Other languages
Chinese (zh)
Inventor
秦日强
党智斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGYUAN DAYINGXIN COMPOSITE MATERIAL PRODUCT CO Ltd
Original Assignee
QINGYUAN DAYINGXIN COMPOSITE MATERIAL PRODUCT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGYUAN DAYINGXIN COMPOSITE MATERIAL PRODUCT CO Ltd filed Critical QINGYUAN DAYINGXIN COMPOSITE MATERIAL PRODUCT CO Ltd
Priority to CN2009201951776U priority Critical patent/CN201526053U/en
Application granted granted Critical
Publication of CN201526053U publication Critical patent/CN201526053U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to an assembly box type inspection well for pipeline in lightweight composite material, which is characterized in that the well is constructed by detachably splicing a seat, a front and a rear side panel in the same, a left and a right side panel in the same. The assembly box type inspection well for pipeline in lightweight composite material facilitates human operation, no affection to the environment is caused because no clay bricks is used, no sand, rocks and cement is used for the masonry, and is an environment friendly pipeline inspection well. The utility model proposes that the inspection well is subject to product production in prefabrication form, then spliced and connected in the field, and in field masonry is eliminated. Not only no affection to the operation field is caused, but also the installation is easy, the splicing speed is high, the construction speed is enhanced by more than 3 times, and the construction cost is lowered by 50% because composite material is used for the seat, the front, the rear, the left and the right side panels. The efficiency is high, and the entire strength of the inspection well is also high.

Description

Assembling box light composite material pipe manhole
Technical field
The utility model relates to a kind of manhole of pipeline, specifically be a kind of little to the operation field ambient influnence, assembly unit speed is fast, and efficient height, pipe manhole that bulk strength is high.
Background technology
With people's life, the many closely pipe-line inspections of working relation, to guarantee safety with needing not timing; Especially some municipal engineering, for example thermoelectricity, communication, coal gas, fire-fighting etc.Pipe inspection need be built a manhole at operation field, traditional pipe manhole, often adopt clay common brick or cement sanded brick and masonry of cement mortar to form, because the main material of masonry is solid clay common brick, and solid clay common brick occupies cultivated land in a large number because of its production, destroy the soil, consumes energy, contaminated environment is a kind of nondegradable resource-hungry product, is limited the quantity of in the city by a lot of local governments even bans use of; Adopt the cement sanded brick, because the structure of building by laying bricks or stones is soaked through rainwater underground, external force (as heavy vehicle) repeat function is easy to plaster and comes off, and is loosely organized, and whole well body is destroyed; Pipe manhole is built at the scene by laying bricks or stones, and sand, stone, cement and brick be manageability not at the scene, have greater environmental impacts, and it is low manually to build work efficiency by laying bricks or stones, and expense is big, and is very uneconomical.
The utility model content
The purpose of this utility model provide a kind of little to the operation field ambient influnence, assembly unit speed is fast, and efficient height, pipe manhole that bulk strength is high.
The purpose of this utility model can realize by following technical scheme: a kind of assembling box light composite material pipe manhole is characterized in that: it is made of base, identical forward and backward side plate and identical left and right side plate assembly unit removably.
The end face periphery of described base has four grooves all around, and each groove joins in twos and constitutes closed square, and the length of each groove is corresponding with the front, rear, left and right side plate respectively with thickness; Described front, rear, left and right side plate vertically is inserted on the described base top surface groove, and described front, rear, left and right side plate vertically splicing place design has corresponding connected structure; Side plate vertical dual-side in described front, rear, left and right has the through hole or the screwed hole of a pair of correspondence at least, and the steel card and the connector that all have " L " type of connecting hole by two right-angle sides connect adjacent biside plate.
The connected structure of described front, rear, left and right side plate is: the two ends in the cross section of each vertical front, rear, left and right side plate are the corresponding stairstepping groove and tognue type that overlaps that an angle bar is made.
On the basis of the above, the utility model can be done following improvement:
The bottom of described base is provided with one deck reinforced mesh, and the size and the base of this reinforced mesh adapt.
Be provided with one deck reinforced mesh at least in the side plate of described front, rear, left and right in any side plate more than one or, the size of described reinforcing bar steel disc and each side plate adapt.
The end face of described base is located at suspension ring; Reinforced mesh in these suspension ring and the described base extension that interlocks.Use other these suspension ring of corollary equipment lifting to move this base up and down.
The center of described base has the through hole that penetrates, and this through hole is as sump.
Described forward and backward side plate all has the preformed hole that is used for by communication conduit, and the preformed hole on the biside plate is located at the position of symmetry.
The material of described composition manhole side plate, end plate, base adopts composite material.
Compared with prior art, the utility model manual work of being more convenient for simultaneously because of not using loam brick, influences environment hardly without sand, stone, cement masonry, is a kind of environment-friendly type pipe manhole.The utility model proposes and take prefabricated form to carry out commercialization production manhole, behind the scene, carry out the assembly unit connection then, build by laying bricks or stones at the cancellation scene, not only the operation field environment there is not influence, and, install lightly because base, front, rear, left and right side plate use is composite material, assembly unit speed is fast, speed of application improves more than three times, and operating expenses reduces by 50%; The efficient height, the manhole bulk strength is also high.
Description of drawings
Fig. 1 is the structural representation of the utility model assembled state;
Fig. 2 is the structural representation along A-A line among Fig. 1;
Fig. 3 is the structural representation of base of the present utility model;
Fig. 4 is the cross-sectional schematic along B-B line among Fig. 3, omits the reinforced mesh in the base this moment;
Fig. 5 is the cross-sectional schematic along C-C line among Fig. 3, omits the reinforced mesh in the base this moment;
Fig. 6 is the front schematic view that reinforced mesh sets in the base of the present utility model;
Fig. 7 is the schematic bottom view that reinforced mesh sets in the base of the present utility model;
Fig. 8 is the structural representation of left plate of the present utility model;
Fig. 9 is the upward view of Fig. 8;
Figure 10 is the schematic bottom view that reinforced mesh sets in the left plate of the present utility model;
Figure 11 is that the reinforced mesh around the left plate upper screwed hole of the present utility model sets schematic diagram;
Figure 12 is the structural representation of front side board of the present utility model;
Figure 13 is the upward view of Figure 12;
Figure 14 is the cross-sectional schematic along D-D line among Figure 12, omits the reinforced mesh in the front side board this moment;
Figure 15 is the front schematic view that reinforced mesh sets in the front side board of the present utility model;
Figure 16 is the cross-sectional schematic along E-E line among Figure 15;
Figure 17 is the schematic bottom view that reinforced mesh sets in the front side board of the present utility model;
Figure 18 is that the reinforced mesh around the front side board upper screwed hole of the present utility model sets schematic diagram;
Figure 19 is the structural representation of steel card of the present utility model;
Figure 20 is the three-dimensional decomposing state schematic diagram of the utility model embodiment assembling;
Figure 21 is the embodiment cross-sectional schematic after the assembling;
Figure 22 is the schematic top plan view of Figure 21;
Figure 23 is the welding schematic diagram of angle bar and reinforced mesh.
The specific embodiment
Assembling box light composite material pipe manhole shown in Fig. 1~19 is embodiment of the present utility model, and it comprises base 1, identical forward and backward side plate 2,3 and identical left and right side plate 4,5; Wherein, the end face periphery of base 1 has four grooves all around, and each groove joins in twos and constitutes closed square 11, and the length of each groove is corresponding with front, rear, left and right side plate 2,3,4,5 respectively with thickness; The front, rear, left and right side plate vertically is inserted on the described base top surface groove, the two ends in the cross section of each vertical front, rear, left and right side plate are the corresponding stairstepping groove and tognue type that overlaps that an angle bar is made, and side plate vertical dual-side in front, rear, left and right has the screwed hole of a pair of correspondence, and the steel card and the connector that all have " L " type of connecting hole by two right-angle sides connect adjacent biside plate.。In addition, the center of base 1 has the through hole 12 that penetrates, and this through hole is as sump; Left and right side plate 4,5 all has the preformed hole 41 that is used for by communication conduit, and the preformed hole on the biside plate is located at the position of symmetry.
During assembly unit, the front, rear, left and right side plate is vertically embedded the counterpart of the groove of base, and the groove and tognue type angle bar of the two side ends of adjacent side plates docks mutually; Fastening between the steel card 6 of " L " type that all has connecting hole between the adjacent biside plate by two right-angle sides and screw 7 existing each side plate then.
In order to increase the intensity of each side plate, thereby improve the anti-heavy load loading capability of whole manhole, the bottom of base is provided with one deck reinforced mesh 8, and the size and the base of this reinforced mesh adapt; Be provided with two-layer reinforced mesh 91,92 in the side plate of front, rear, left and right, the size of reinforced mesh and each side plate adapt.In addition, the end face of base is located at suspension ring 10, the extension that interlocks of the reinforced mesh in these suspension ring and the described base; Can use other these suspension ring of corollary equipment lifting to move this base up and down.
The size of manhole can be divided into single page manhole, pair of pages manhole, three page check wells according to the well lid quantity that covers on the manhole, and side plate, the big I of end plate are adjusted synchronously according to well seat size.
The composite material that manhole adopted will reach material performance requirement, must strict prepare burden by certain proportioning, and by stirrings that feed intake of certain feeding sequence, mixing time must not be lower than 3min only.
Composite material ratio range (kg):
Cement: coarse aggregate: fine aggregate: Admixture: additive
300~400 500~750 400~700 2.4~3.2 0.7~1.2
Composite material each component feeding sequence:
Figure G2009201951776D00041
The material of forming manhole side plate, end plate, base adopts composite material, and its main raw material(s) technical requirements need be satisfied:
A. cement is general purpose portland cement.
B. gather materials and adopt 500~800 density rating light aggregates or common medium coarse sand.
C. adding material is that fiber is split in the polypropylene resistance.
Manhole is divided into A level, B level, C level, D level level Four according to different environments for use and characteristics by bearing capacity.
The A level is applicable to that the airport maybe can be for the extraordinary road and the places such as speedway of helicopter landing.
The B level is applicable to motor-driven vehicle going, the urban road of parking, highway and parking lot.
The C level is applicable to slow lane, esidential building sub-district internal channel and sidewalk.
The D level is applicable to lane and the place that greenbelt and motor vehicles can not exercise, park.

Claims (9)

1. assembling box light composite material pipe manhole is characterized in that: be made of base, identical forward and backward side plate and identical left and right side plate assembly unit removably.
2. assembling box light composite material pipe manhole according to claim 1, it is characterized in that: the end face periphery of described base has four grooves all around, each groove joins in twos and constitutes closed square, and the length of each groove is corresponding with the front, rear, left and right side plate respectively with thickness; Described front, rear, left and right side plate vertically is inserted on the described base top surface groove, and described front, rear, left and right side plate vertically splicing place design has corresponding connected structure; Side plate vertical dual-side in described front, rear, left and right has the through hole or the screwed hole of a pair of correspondence at least, and the steel card and the connector that all have " L " type of connecting hole by two right-angle sides connect adjacent biside plate.
3. assembling box light composite material pipe manhole according to claim 2, it is characterized in that: the connected structure of described front, rear, left and right side plate is: the two ends in the cross section of each vertical front, rear, left and right side plate are the corresponding stairstepping groove and tognue type that overlaps that an angle bar is made.
4. assembling box light composite material pipe manhole according to claim 3, it is characterized in that: the bottom of described base is provided with reinforced mesh, and the size and the base of this reinforced mesh adapt.
5. assembling box light composite material pipe manhole according to claim 4, it is characterized in that: be provided with one deck reinforced mesh at least in the side plate of described front, rear, left and right in any side plate more than one or, the size of described reinforced mesh and each side plate adapt.
6. assembling box light composite material pipe manhole according to claim 5, it is characterized in that: the end face of described base is located at suspension ring; Reinforced mesh in these suspension ring and the described base extension that interlocks.
7. assembling box light composite material pipe manhole according to claim 6, it is characterized in that: the center of described base has the through hole that penetrates.
8. assembling box light composite material pipe manhole according to claim 7, it is characterized in that: described forward and backward side plate all has the preformed hole that is used for by communication conduit, and the preformed hole on the biside plate is located at the position of symmetry.
9. assembling box light composite material pipe manhole according to claim 8, it is characterized in that: described base size can be divided into single page manhole, pair of pages manhole, three page check wells according to the well lid quantity that manhole covers, and side plate, the big I of end plate are adjusted synchronously according to the base size.
CN2009201951776U 2009-09-22 2009-09-22 Assembly box type inspection well for pipeline in lightweight composite material Expired - Lifetime CN201526053U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201951776U CN201526053U (en) 2009-09-22 2009-09-22 Assembly box type inspection well for pipeline in lightweight composite material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201951776U CN201526053U (en) 2009-09-22 2009-09-22 Assembly box type inspection well for pipeline in lightweight composite material

Publications (1)

Publication Number Publication Date
CN201526053U true CN201526053U (en) 2010-07-14

Family

ID=42517343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201951776U Expired - Lifetime CN201526053U (en) 2009-09-22 2009-09-22 Assembly box type inspection well for pipeline in lightweight composite material

Country Status (1)

Country Link
CN (1) CN201526053U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767227A (en) * 2011-05-06 2012-11-07 徐刚 Combined rectangular municipal inspection well chamber prefabricating part
CN103088844A (en) * 2013-03-04 2013-05-08 济南城建集团有限公司 Reinforced concrete inspection well whole prefabricated hoisting construction method
CN103088900A (en) * 2013-03-04 2013-05-08 济南城建集团有限公司 Prefabricated-assembled type gutter inlet and construction method thereof
CN104047354B (en) * 2014-07-10 2015-11-25 童中祥 A kind of assembling general-purpose type fiber glass reinforced plastics inspection well
CN105369828A (en) * 2015-10-30 2016-03-02 国网浙江省电力公司台州供电公司 Prefabricated assembly type cable working well
CN106545032A (en) * 2016-11-04 2017-03-29 常州信息职业技术学院 Large-scale power inspection shaft well body and preparation method thereof
CN107447785A (en) * 2017-09-15 2017-12-08 齐建军 A kind of plastic spliced inspection shaft of light steel skeleton
CN108487320A (en) * 2018-04-28 2018-09-04 国网江苏省电力有限公司常州供电分公司 Modularization short-term training cable shaft
CN109183821A (en) * 2018-09-18 2019-01-11 中国矿业大学 A kind of quick detachable predetermined level precipitation well construction and construction method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767227A (en) * 2011-05-06 2012-11-07 徐刚 Combined rectangular municipal inspection well chamber prefabricating part
CN103088844A (en) * 2013-03-04 2013-05-08 济南城建集团有限公司 Reinforced concrete inspection well whole prefabricated hoisting construction method
CN103088900A (en) * 2013-03-04 2013-05-08 济南城建集团有限公司 Prefabricated-assembled type gutter inlet and construction method thereof
CN103088844B (en) * 2013-03-04 2015-04-08 济南城建集团有限公司 Reinforced concrete inspection well whole prefabricated hoisting construction method
CN104047354B (en) * 2014-07-10 2015-11-25 童中祥 A kind of assembling general-purpose type fiber glass reinforced plastics inspection well
CN105369828A (en) * 2015-10-30 2016-03-02 国网浙江省电力公司台州供电公司 Prefabricated assembly type cable working well
CN106545032A (en) * 2016-11-04 2017-03-29 常州信息职业技术学院 Large-scale power inspection shaft well body and preparation method thereof
CN106545032B (en) * 2016-11-04 2018-11-16 常州信息职业技术学院 Large-scale power inspection shaft well body and preparation method thereof
CN107447785A (en) * 2017-09-15 2017-12-08 齐建军 A kind of plastic spliced inspection shaft of light steel skeleton
CN108487320A (en) * 2018-04-28 2018-09-04 国网江苏省电力有限公司常州供电分公司 Modularization short-term training cable shaft
CN109183821A (en) * 2018-09-18 2019-01-11 中国矿业大学 A kind of quick detachable predetermined level precipitation well construction and construction method

Similar Documents

Publication Publication Date Title
CN201526053U (en) Assembly box type inspection well for pipeline in lightweight composite material
CN102535295B (en) Fabricated prestressed heat-resistant cement concrete pavement and construction process thereof
CN204258238U (en) A kind of prefabricated assembled irrigation canals and ditches device
CN201635257U (en) Member utilizing regeneration aggregate concrete
CN101446078A (en) Recycled aggregate highway sound insulation protective screen plate and manufacturing and installing method thereof
CN102767191A (en) Anti-differential-settlement inspection well device and construction method thereof
CN212404694U (en) Assembled water drainage road surface structure of preventing
CN111364667B (en) Raw soil-laminated wood composite floor slab
CN103306306A (en) Anti-differential settlement inspection well device and construction method thereof
CN202247719U (en) Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN105484284B (en) A kind of outdoor switch case well head basis and preparation method thereof
CN201649123U (en) Assembly integrated counterfort retaining wall
CN203947493U (en) Assembling type device for detecting manhole
CN202767112U (en) Differential settlement resistant inspection well device
CN205894278U (en) Solid superstructure beam -columns system's integral basement of coincide assembly
CN212425885U (en) Recycled concrete permeable pavement brick
CN104499507B (en) Regenerated concrete cover plate and manufacturing method thereof
CN205188747U (en) Each other pass power formula interlocking piece
CN212000674U (en) Novel reverse construction method assembly type non-pressure culvert
CN204510264U (en) A kind of manhole mouth structure
CN206600524U (en) A kind of modularization assembling steel backrest
CN203669499U (en) Prefabricated wall
CN207004150U (en) A kind of environmentally friendly flag platform easy to assemble that can be reused
CN207672362U (en) Assembled temporary road plate
CN205189174U (en) Light fitment wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20100714

CX01 Expiry of patent term